Start from what you see on your floor and get the method that fixes it: 62 methods from SMED and TPM to kanban, what to measure before and after, 131 results from real plants (36 in India) and 78 training programmes in India. Data as of
The Navigator holds 62 improvement methods and tools, from SMED and TPM to kanban, SPC and daily management, each tied to the problems an owner sees on the floor (25 of them). For every method it shows what to measure before you start and after, and how to get that number with your own staff: a stopwatch, a downtime log, a check sheet or a video of the job
The 131 results are before/after numbers taken from published sources, 36 of them from Indian plants. Each number carries the type of its source: a peer-reviewed study, a review of studies, a case study, or a figure reported by a vendor or consultant. Most published results come from a single plant, and each such number is marked "single-plant case". Treat them as what a method has achieved somewhere, not as a promise for your plant. Timelines and costs appear only where a source prints them
The Training tab lists 78 programmes that are open or running now, from the National Productivity Council, MSME centres, industry bodies and institutes, filtered by role from owner/MD to operator. Fees and dates are as each provider publishes them; check with the provider before you enrol
Methods covered: 5-Why root cause analysis, 5S, 8D problem solving, A3 problem solving, ABC/XYZ inventory classification, Assembly line balancing, Automated visual inspection, Autonomous maintenance, Cellular manufacturing, CMMS / digital maintenance log, Compressed-air leak detection and repair, CONWIP, Cost of Poor Quality, Daily management, Demand-Driven MRP, Design of Experiments, Employee suggestion system, Energy management system and energy audits, Finite-capacity scheduling, Gemba walk, Heijunka, Hoshin kanri, In-plant milk-run with supermarket, IoT machine monitoring, Ishikawa, ISO 9001 quality management system, Jidoka and andon, Just-in-Time, Kaizen, Kanban, Line-side kitting, Measurement System Analysis, OEE measurement, Overall Labour Effectiveness, Pareto analysis, Plant layout redesign, Poka-yoke, Predictive maintenance, Preventive, Process FMEA, Quality circles, Quick Response Manufacturing, Reliability-centred maintenance, Sales and Operations Planning, Six Sigma, Skill matrix and cross-training, SMED, Spaghetti diagram, Standardised work, Statistical Process Control, Supplier development, Takt time planning, Theory of Constraints, Time and motion study, TPM, TWI Job Instruction, Value analysis / value engineering, Value Stream Mapping, Vendor-managed inventory, Visual management, Work sampling, Workstation ergonomics
Read next: OEE explained, with a rupee example, the real cost of factory downtime, SKU changeover on packing lines (SMED)
The same 62 methods as the Navigator above, each with what to measure before and after, 131 published results with their source type, and the training programmes in India. Open a method to read it.
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| average mold changeover time | mold changeover time decreased from 8.77 minutes to 3.51 minutes (-60.22%); OEE 55.85% -> 65.65% | automotive parts stamping, 800-ton press; Why-Why analysis combined with SMED, visual control | TH | Peer-reviewed study | Meemak J., Choomlucksana J. (2024). Reducing Downtime Loss in the Automotive Parts Stamping Process Using Why-Why Analysis: A Case Study. Engineering and Technology Horizons 41(3) |
| overall equipment effectiveness | OEE from 55.85% to 65.65% (+9.8 percentage points) | automotive parts stamping, 800-ton press; Why-Why with SMED and visual control | TH | Peer-reviewed study | Meemak J., Choomlucksana J. (2024). Reducing Downtime Loss in the Automotive Parts Stamping Process Using Why-Why Analysis: A Case Study. Engineering and Technology Horizons 41(3) |
| rejection level, cylinder block castings (sand drop) | rejection level from 37.17% to 16.3% | foundry, cylinder block casting; why-why analysis with check sheet and cause-effect diagram | Case study | Nerle V., Shinde S. (2013). Analysis of the Sand Drop Defect to Reduce the Rejection Level of Cylinder Block Casting: A Case Study. International Journal of Engineering Research & Technology 2(9) |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Problem Analysis and Decision Making | online | self-paced | Rs.250 | online | shop manager, supervisor | |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | 8D Problem Solving Methodology and 7QC Tools | classroom | 2 days | Gurugram | supervisor, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Machine Breakdown Analysis | classroom | 2 days | Pune | supervisor, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Problem-Solving Tools for Securing our Present & Future | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Chhatrapati Sambhajinagar | shop manager, supervisor |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Effective Maintenance Towards Zero Down Time (ZDT) - Electrical Aspects of CNC Machines | classroom | 3 days | Rs. 6999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | maintenance head |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Certified Specialist in Root Cause Analysis | classroom | 2 days | Pune | supervisor, quality head, maintenance head | ||
| IIM Mumbai (formerly NITIE) - Open MDP | Manufacturing & Operational Excellence | online | 3 days / 18 hours | Bulk discount for 5+ participants from same organisation | online | plant head, shop manager, quality head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| tool search time; 5S audit score | 30 -> 5 min; audit score 7 -> 55 (week 1 -> week 20) | small-scale scientific instruments manufacturer | IN | Peer-reviewed study | Gupta S., Jain S.K. (2015). An application of 5S concept to organize the workplace at a scientific instruments manufacturing company. Int. J. Lean Six Sigma 6(1):73 |
| 5S audit score | 6 -> 72 (week 1 -> week 24) | scientific equipment company | IN | Peer-reviewed study | Gupta S., Chandna P. (2020). Grey Systems: Theory and Application |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | 5S | online | self-paced | Rs.250 | online | shop manager, supervisor, operator | |
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| National Productivity Council (NPC) | Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0 | classroom | 5 days | Puri | plant head, shop manager, maintenance head | ||
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI) | ZED Certification (Bronze/Silver/Gold) + Gap Analysis & Handholding | certification | Bronze online self-certification; Silver/Gold with site assessment | Registration free | Subsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEs | pan-India | owner/MD, plant head, quality head |
| CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), Mumbai | In-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safety | in-plant | tailored | Mumbai (delivered pan-India) | plant head, shop manager, supervisor | ||
| Quality Circle Forum of India (QCFI) | 40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yoke | classroom | 4 days | Bhubaneswar | shop manager, supervisor, operator | ||
| Quality Circle Forum of India (QCFI) - chapters | Chapter Conventions on Quality Concepts (CCQC 2026) - Tirupati, Nagpur, Pune (virtual) | classroom | 1-2 days | Tirupati; Nagpur; Pune (virtual) | supervisor, operator | ||
| Quality Circle Forum of India (QCFI) | 5S training, implementation & certification (in-plant) | in-plant | engagement-based | at client plant | shop manager, supervisor, operator | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | World Class Manufacturing - What, Why and How; Tools and Techniques | classroom | 2 days | Bengaluru | owner/MD, plant head | ||
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| valve spring rejection | rejection from 17.07% (6-month average) to 4.91% (July 2014); target 5% | springs and stampings manufacturer; 8D with Pareto, cause-and-effect, 5-Why | Peer-reviewed study | Kumar T.S., Adaveesh B. (2017). Application of 8D Methodology for the Root Cause Analysis and Reduction of Valve Spring Rejection in a Valve Spring Manufacturing Company: A Case Study. Indian Journal of Science and Technology 10(11):1-11 | |
| reject rate, mixer shower assembly line (leak rejects) | reject rate from 11.84% to 0.11% | mixer shower sub-assembly with O-seals; 8D combined with Six Sigma tools | Peer-reviewed study | Sharma M., Sharma S., Sahni S. (2020). Structured problem solving: combined approach using 8D and Six Sigma case study. Engineering Management in Production and Services 12(1):57-69 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | 8D Problem Solving Methodology and 7QC Tools | classroom | 2 days | Gurugram | supervisor, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Certified Specialist in Root Cause Analysis | classroom | 2 days | Pune | supervisor, quality head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| machine setup (preparation) time | reduction of 70.4% of setup time; third shift avoided | motorcycle production company, action research single case | BR | Peer-reviewed study | Santos Filho G.M., Simão L.E. (2022). A3 methodology: going beyond process improvement. Revista de Gestão 30(2):147-161 |
| share of A3 reports fully successful (target met, actions on time) | 6 A3 reports in 3 plants over 1.5 years: 50% successful, 33% moderate, 17% low-performing | three production companies (incl. shock absorber assembly) | PL | Peer-reviewed study | Grobelna A., Wasilewska B. (2023). Evaluation of A3 tool in the production process. Scientific Papers of Silesian University of Technology, Organization and Management Series 176 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | New 7 QC Tools | online | self-paced | Rs.250 | online | shop manager, quality head | |
| National Productivity Council (NPC) - e-LEAP | Problem Analysis and Decision Making | online | self-paced | Rs.250 | online | shop manager, supervisor | |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Problem-Solving Tools for Securing our Present & Future | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Chhatrapati Sambhajinagar | shop manager, supervisor |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Materials Requirement Planning | online | self-paced | Rs.250 | online | plant head, shop manager | |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Materials Management and Inventory Control | classroom | 2 days | Bengaluru | plant head, shop manager | ||
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor | ||
| IIM Mumbai - Open MDP | Warehouse Design & Automation | classroom | 3 days | Mumbai | plant head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Line efficiency | efficiency of the line has increased approx 10% and hence balance delay got reduced | Indian SME with foundry shop; takt computation, line balancing, VSM, layout, kanban, andon | IN | Case study | Das A.K., Das M.C. (2023). Productivity improvement using different lean approaches in small and medium enterprises (SMEs). Management Science Letters 13(1):51-64 |
| Fuel tank assembly line output | productivity enhanced from 140 to 158 units per shift within 14 months | Indian automobile manufacturer, fuel tank assembly line; TPM programme with line-stoppage reduction, line balancing and operations standardisation combined | IN | Peer-reviewed study | Gupta P., Mittal S., Hooda S., Gupta A. (2022). Assembly line productivity improvement through TPM by controlling line organisation efficiency and out of balance index: an empirical exploration. International Journal of Indian Culture and Business Management 26(1):1 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | NRLL Series M4 - Productivity Improvement through Line Balancing | online | self-paced | Rs.1500 | online | shop manager, supervisor | |
| National Productivity Council (NPC) - e-LEAP | Industrial Engineering Tools for Productivity Improvement | online | self-paced | Rs.2000 | online | shop manager, supervisor | |
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| human inspector hit rate | manual inspectors caught 85% of defective parts and wrongly rejected 35% of good parts; industry average hit rate 80% | 82 inspectors, 140 precision parts, 8 defect types | US | Peer-reviewed study (baseline, not a result) | See J.E. (2015). Visual Inspection Reliability for Precision Manufactured Parts. Human Factors 57(8):1427-1442 |
| classification accuracy, response time | deployed CNN defect finder: accuracy over 99%, about 0.14 s per part (requirement 95% within 0.2 s) | weld nut inspection, automotive bolts and nuts maker Frontec | KR | Peer-reviewed study | Lee K.J., Kwon J.W., Min S., Yoon J. (2020). Embedding Convolution Neural Network-Based Defect Finder for Deployed Vision Inspector in Manufacturing Company Frontec. AAAI Conference on Artificial Intelligence 34(08):13164-13171 |
| inspection time per part | manual inspection up to seven minutes per part on two workstations -> vision system about 300 ms, monitored by a single operator | MAP sensor inspection, Bosch India; integrator Qualitas Technologies | IN | Vendor-reported | Camillo J. (2015). Machine Vision Improves Inspection of Automotive Sensors. Assembly Magazine, 4 May 2015 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Inspection for Quality Control | online | self-paced | Rs.250 | online | supervisor, quality head, operator | |
| Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology Centre | Jr. Technician - Inspection & Quality Control (NSQF) | classroom | 6 months / 600 hrs | ₹ 22,000/- | No fee for SC/ST (NSQF courses) | Bhubaneswar | supervisor, operator |
| National Institute for MSME (NI-MSME) | Smart Factory Design & AI Integration: Building Future-Ready MSME Manufacturing Enterprises (SED/SM/5) | classroom | 3 days | Hyderabad | owner/MD, plant head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| OEE of packaging line | OEE 39.37% -> 52.31% (+12.95 points); availability 66.21->69.33, performance 61.30->77.44, quality 97.00->97.44 | pharmaceutical packaging line, Jamshoro, Sindh; CILT (clean-inspect-lubricate-tighten) | PK | Peer-reviewed study | Khan S., Ahmed S., Ali M., Khan R. (2023). Impact of Cleaning Inspecting Lubrication & Tightening (CILT) on Overall Equipment Effectiveness for Sustainable Production. Journal of Sustainable Environment 2(1):29-37 |
| OEE of one machine (Alfing) | OEE April 37.65%, May 71.17%, June 77.38%, July 77.62% after JH steps 1-3 | manufacturing company, Maharashtra; single machine 'Alfing'; Jishu Hozen up to step 3 over 4 months | IN | Case study | Gaikwad H.V. (2018). Total Productive Maintenance in a Manufacturing Industry: A Case Study of JISHU HOZEN Implementation. Indian Journal of Science and Technology 11(37):1-13 |
| total uptime | 6% improvement in total uptime; scheduled maintenance need lowered by 2.61 h/week | pharmaceutical packaging line; operator-training-led AM | PK | Peer-reviewed study | Memon A.M. (2022). Analysing the Impact of Autonomous Maintenance on the Packaging Line of a Pharmaceutical Industry. Quaid-e-Awam University Research Journal of Engineering, Science & Technology 20(2):64-70 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Total Productive Maintenance (TPM): Basic Programme | online | self-paced | Rs.1200 | online | shop manager, supervisor, maintenance head | |
| Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology Centre | Sr. Technician - Machine Maintenance & Automation (NSQF) | classroom | 6 months / 600 hrs | ₹ 33,810/- | No fee for SC/ST (NSQF courses) | Bhubaneswar | maintenance head, operator |
| CII TPM Club India (CII-IQ) | CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membership | certification | assessment-based | pan-India | owner/MD, plant head, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Understanding TPM and Roadmap for Implementation of TPM | classroom | 2 days | Hosur | plant head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| production lead time; WIP; operators | lead time two days -> one hour; WIP 500-1500 -> max 100 pieces; operators -14%; rework -80% | shirt sewing section, garment company; batch line converted to single piece flow work cells | Case study | Paneru N. (2011). Implementation of Lean Manufacturing Tools in Garment Manufacturing Process Focusing Sewing Section of Men's Shirt. Bachelor's thesis, Theseus (Finnish UAS repository) |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| plant production losses | production losses $22.54m (2013, no CMMS), $21.587m (2014), $19.365m (2015) | cement plant; limestone crusher, cement mill, kiln; year-on-year after CMMS deployment | NG | Peer-reviewed study | Adetunji O.R., Owolabi S.M., Adesusi O.M., Dairo O.U., Ipadeola S.O., Taiwo S.O. (2018). Effect of Computerized Maintenance Management System on a Cement Production Plant. International Journal of Integrated Engineering 10(4) |
| maintenance cost as % of replacement asset value | %RAV 3.74% with CMMS vs 5.67% without (benchmark 2.5%) | 62 publicly listed process-industry companies; cross-sectional comparison, not before/after | PK | Peer-reviewed study | Ali M.H., Khalid R. (2021). Computerized Maintenance Management System: A case of Process Industries of Pakistan. Pakistan Journal of Engineering and Applied Sciences 28(1) |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Preventive Maintenance | online | self-paced | Rs.250 | online | supervisor, maintenance head, operator |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| compressed-air system energy consumption after leak repair | energy consumption improved by 8% after repairing leaks (230 leak points, ultrasonic survey) | manufacturing plant, 230 leak points over three measurement periods | Peer-reviewed study | Kapan, S. (2026). Energy Saving Potential and Machine Learning-Based Prediction of Compressed Air Leakages in Sustainable Manufacturing. Sustainability 18(2):904 | |
| savings vs repair cost per cfm of leakage | on average $156 savings per cfm repaired vs $30 repair cost per cfm; 740 leaks, >50% at hoses, threads, connectors, fittings | leak assessments at several US manufacturing plants plus 68 ITAC assessments | US | Peer-reviewed study | Barad, D., Buechler, J., Rasmussen, B. P. (2025). Optimizing Compressed Air System Efficiency in Manufacturing: A Study on Air Leak Repairs and Economical Impact. ASME MSEC 2025 (conference) |
| annual energy saved by leak arresting | 1,20,356 kWh per year, INR 9 lakh; verified with energy meters and compressor run counters | cement plant, instrument air network, Wadi, Karnataka | IN | Vendor-reported | Atlas Copco India (n.d.). AIRScan helps leading cement manufacturer cut CO2 emissions. Customer story |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Energy Efficiency Techniques-22 | online | self-paced | Rs.1770 | online | plant head, maintenance head | |
| National Productivity Council (NPC) - Dr. Ambedkar Institute of Productivity | Energy Efficiency Hands-on Training on Electrical & Thermal Utilities | classroom | 5 days | Chennai (AIP-NPC) | plant head, maintenance head | ||
| National Productivity Council (NPC) - Dr. Ambedkar Institute of Productivity | Energy Efficiency Practitioners Course for Industrial Applications | classroom | 5 days | Chennai (AIP-NPC) | plant head, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Maintenance and Troubleshooting of Hydraulics and Pneumatics Systems | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Ghaziabad | maintenance head, operator |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| WIP inventory | WIP down ~20,000 units (27.79%); kanban cards 48 to 38; inner-ring replenishment 6.94 to 6.53 days | bearing manufacturer (UN 3213B bottom roller bearing), Kanban with CONWIP | IN | Peer-reviewed study | Ukey K, Gajghate SS, Kumar S, Kumar Behera A, Majumder H (2025). Execution of Pull System and Constant Work-in-Process Using Kanban System - A Case Study. Engineering Proceedings (AdvaMAP 2025), art. 2 |
| inventory turnover | 38% increase in inventory turnover, cycle time reduced (hybrid Kanban-CONWIP pilot) | make-to-order job shop, manufacturer of electromechanical components for valve monitoring and controls | Peer-reviewed study | Leonardo DG, Sereno B, da Silva DSA, Sampaio M, Massote AA, Simoes JC (2017). Implementation of hybrid Kanban-CONWIP system: a case study. Journal of Manufacturing Technology Management 28(6):714-736 |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| cost of internal failure | cost of internal failures reduced by about 40% after on-line gauge inspection | small-scale sheet metal unit, central India | IN | Case study | Kane P.V., Deshpande V.S. (2007). Design of on-line inspection methodology for reduction of cost of internal failure - a case study in sheet metal industry. 9th International Symposium on Measurement and Quality Control (ISMQC), IIT Madras |
| total cost of quality as % of sales | CoQ = 23% of sales revenue (prevention 4.8%, appraisal 10.2%, internal failure 7.4%, external failure 0.54%) | small export apparel factory, Addis Ababa | ET | Peer-reviewed study (baseline, not a result) | Panghal M., Prasad S., Tilahun S. (2022). Quantification of Cost of Quality: A Case Study in an Ethiopian Apparel Manufacturing Factory. Journal of Textile and Apparel, Technology and Management 12(3) |
| quality cost as % of sales | quality cost fell from 2.21% to 1.24% of sales (4.67 million baht on selected product within 5 months) | electronics appliance manufacturer, PAF model + Pareto + cause-and-effect | TH | Case study | Li Xiujie (2001). Quality cost reduction: a case study in electronics appliance manufacturing company. M.Eng thesis, Chulalongkorn University |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Cost of Quality | online | self-paced | Rs.250 | online | owner/MD, plant head, quality head | |
| Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI) | ZED Certification (Bronze/Silver/Gold) + Gap Analysis & Handholding | certification | Bronze online self-certification; Silver/Gold with site assessment | Registration free | Subsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEs | pan-India | owner/MD, plant head, quality head |
| CII Institute of Quality | Lean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior management | handholding/consulting | engagement-based | Bengaluru (pan-India delivery) | owner/MD, plant head, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | World Class Manufacturing - What, Why and How; Tools and Techniques | classroom | 2 days | Bengaluru | owner/MD, plant head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing SPC, a Game Changer for Cost Reduction | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Pune | supervisor, quality head |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing SPC, a Game Changer for Cost Reduction | classroom | 2 days | Bengaluru | supervisor, quality head | ||
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager | ||
| ACMA (Automotive Component Manufacturers Association of India) | E-learning: Material Flow Cost Accounting (MFCA) incl. MFCA in Kaizen and supply chain | online | self-paced modules | online | plant head, quality head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Productivity | productivity +17% in the first year (randomized; bundle of 38 practices incl. daily production/quality meetings and daily-updated visual boards) | Large Indian textile (weaving) firms, randomized treatment vs control plants, Mumbai area | IN | Peer-reviewed study | Bloom, N., Eifert, B., Mahajan, A., McKenzie, D., Roberts, J. (2013). Does Management Matter? Evidence from India. Quarterly Journal of Economics 128(1):1-51 |
| Quality defects index (QDI) | 32% fall in quality defects index - defects cut by about a third (faults caught in daily QDI and handled in next day's quality meeting) | Indian textile plants, intent-to-treat estimate | IN | Working paper | Bloom, N., Eifert, B., Mahajan, A., McKenzie, D., Roberts, J. (2010). Does Management Matter? Evidence from India. NBER Working Paper 16658 |
| Overall Equipment Efficiency Total (OEET) | OEET 37% to 48%; equipment maintenance time 4,681 to 3,750 hours/year after DM | Logistics sector of an oil & gas industrial unit ('Alfa Company') | BR | Case study | Telhada, A.L.C., Damasio, M.E.P., Pacheco, D.J., Molina Palma, M.A., Margem, F.M. (2026). Daily production management based on Lean Manufacturing: strategies for process optimization and control in the logistics sector. Cadernos Cajuina 11(3):e2141 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Supervisor and His Job | online | self-paced | Rs.250 | online | supervisor | |
| National Productivity Council (NPC) - e-LEAP | TQM Implementation for Business Excellence | online | self-paced | Rs.2000 | online | owner/MD, plant head, quality head | |
| Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI) | ZED Certification (Bronze/Silver/Gold) + Gap Analysis & Handholding | certification | Bronze online self-certification; Silver/Gold with site assessment | Registration free | Subsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEs | pan-India | owner/MD, plant head, quality head |
| Quality Council of India - National Board for Quality Promotion (NBQP), Training & Capacity Building Division | Quality awareness workshops and tailored training / capacity building | in-plant | tailored | pan-India | owner/MD, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | World Class Manufacturing - What, Why and How; Tools and Techniques | classroom | 2 days | Bengaluru | owner/MD, plant head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Lean Daily Work Management (DWM) System | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| inventory level | inventory reduced by 52.53% while material consumption rose 8.7%, service level maintained | real company converting from MRP to DDMRP (before/after comparison) | Peer-reviewed study | Kortabarria A, Apaolaza U, Lizarralde A, Amorrortu I (2018). Material management without forecasting: From MRP to demand driven MRP. Journal of Industrial Engineering and Management 11(4):632 |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| casting rejection rate | rejection rate reduced from 16.98% to 6.07% | ductile iron castings, medium-scale foundry, Taguchi L-27 | IN | Peer-reviewed study | Johnson Santhosh A., Lakshmanan A.R. (2016). Investigation of ductile iron casting process parameters using Taguchi approach and response surface methodology. China Foundry 13(5):352-360 |
| electrical failures | reduction in the electrical failures of around 50% | semiconductor inkjet cartridge plant, 2^3 DOE within Six Sigma project | MX | Peer-reviewed study | Valles A., Sanchez J., Noriega S., Gomez Nunez B. (2009). Implementation of Six Sigma in a Manufacturing Process: A Case Study. International Journal of Industrial Engineering 16(3):171-181 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| Indian Statistical Institute - SQC & OR Unit Hyderabad | In-plant training programmes (top management / middle managers / shopfloor supervisors & operators) | in-plant | 1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloor | at client plant | owner/MD, plant head, supervisor, quality head, operator | ||
| IIM Mumbai - Open MDP | Business Accelerator Program for MSME | online | 3 days / 18 hours | online | owner/MD |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| savings from implemented employee suggestions | Savings of nearly Rs 400 million in FY2004-05; >57,000 suggestions, ~20,000 accepted | BHEL, heavy electrical engineering PSU, company-wide | IN | Consultant-reported | Bharat Heavy Electricals Ltd (2005). BHEL's participative culture pays rich dividends: employees' suggestions lead to savings of Rs.400 million. Company press release, 02/05/2005 |
| estimated economic effect of suggestions per firm | 225.4 billion yen/year across 278 firms (avg 810 million yen per firm); 12.8 suggestions per employee per year | 1981 survey of 427 Japanese firms (Japan Human Relations Association / Japan Suggestion Activities Association), ~1.83 million employees | JP | Case study | Akaoka, I. (1983). Motivation of Employees in Japan. Kyoto University Economic Review 53:25- |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Kaizen | online | self-paced | Rs.250 | online | shop manager, supervisor, operator | |
| National Productivity Council (NPC) - e-LEAP | Quality, Waste Minimization & Safety Circles | online | self-paced | Rs.250 | online | supervisor, operator |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| annual energy performance improvement rate | around 4.1% in the initial year of implementation and around 3.4% twelve years after implementation | 83 manufacturing facilities with verified ISO 50001 energy performance data | Peer-reviewed study | Fitzgerald, P., Therkelsen, P. L., Sheaffer, P., Rao, P. (2023). Deeper and persistent energy savings and carbon dioxide reductions achieved through ISO 50001 in the manufacturing sector. Sustainable Energy Technologies and Assessments 57:103280 | |
| annual energy savings after detailed energy audits and implementation support | 757 ECMs implemented, 1409 toe/year energy savings, CO2 reductions over 12,700 t; monetary benefit Rs 1130 lakh/year (table) | Rajkot foundry cluster, 110 MSME foundries, TERI-SDC deep dive 2015-17 | IN | Case study | TERI / BEE (2018). SAMEEEKSHA Newsletter Vol 9 Issue 2 (June 2018): deep dive approach in Rajkot foundry cluster |
| share of identified energy conservation measures needing no investment / paying back within 1 year | 242 ECMs (23%) required no investment; 463 (44%) paid back within one year | Rajkot foundry cluster, 110 MSME foundries | IN | Case study | TERI / BEE (2018). SAMEEEKSHA Newsletter Vol 9 Issue 2 (June 2018) |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | ISO 50001:2018 Energy Management System (EnMS) | online | self-paced | Rs.1770 | online | plant head, maintenance head | |
| National Productivity Council (NPC) - e-LEAP | Energy Efficiency Techniques-22 | online | self-paced | Rs.1770 | online | plant head, maintenance head | |
| National Productivity Council (NPC) - e-LEAP | Energy Management System Auditors Course | online | self-paced | Rs.1770 | online | plant head, maintenance head | |
| National Productivity Council (NPC) - e-LEAP | Energy Management Professional Short Course | online | self-paced | Rs.0 | online | plant head, maintenance head | |
| National Productivity Council (NPC) - Dr. Ambedkar Institute of Productivity | Energy Efficiency Hands-on Training on Electrical & Thermal Utilities | classroom | 5 days | Chennai (AIP-NPC) | plant head, maintenance head | ||
| National Productivity Council (NPC) - Dr. Ambedkar Institute of Productivity | Energy Efficiency Practitioners Course for Industrial Applications | classroom | 5 days | Chennai (AIP-NPC) | plant head, maintenance head | ||
| Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI) | ZED Certification (Bronze/Silver/Gold) + Gap Analysis & Handholding | certification | Bronze online self-certification; Silver/Gold with site assessment | Registration free | Subsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEs | pan-India | owner/MD, plant head, quality head |
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager | ||
| IIM Calcutta - Executive Education | Advanced Programme in Smart Manufacturing Leadership (APSML) | online | 8 months (Saturday evening live sessions + 4-day campus visit) | Rs. 2,74,000/- + (Applicable Taxes) | online + Kolkata campus | owner/MD, plant head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Compliance with delivery deadlines | from 60 to 90 percent; planning time 4 days to 1 | moulds and plastic/metal parts maker, Siemens Opcenter APS | BR | Vendor-reported | Siemens Digital Industries Software (n.d.). Artis Matriz case study (Opcenter APS). Vendor web page |
| On-time deliveries | on-time deliveries improved by 15 percent | mining and aggregate heavy equipment maker, Siemens Opcenter APS | CA | Vendor-reported | Siemens Digital Industries Software (n.d.). Masaba Canada case study (Opcenter APS). Vendor web page |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Introduction to Works Planning and Control | online | self-paced | Rs.250 | online | plant head, shop manager | |
| National Institute for MSME (NI-MSME) | Smart Production Management with AI Decision (SED/SM/4) | classroom | 3 days | Hyderabad | owner/MD, plant head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Overall factory performance (OEE-type efficiency) | approximately 5% increase in overall factory performance; 5% package maker; 1.5% extruder, alongside higher adherence to the gemba walk schedule | Animal feed factory, one-year study; weekly digital reminder to keep the walk schedule | BR | Case study | Almeida, A.G.M. (2025). Uso da ferramenta de Gemba Walks para aumentar a eficiencia geral de equipamentos: um estudo de caso. Bachelor thesis (TCC), Universidade Federal de Pernambuco |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Lean Daily Work Management (DWM) System | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Actual inventory (monthly average) | actual inventory decreased in 23% in average monthly values | Stamping-like press stage, 2 machines, up to 130 product models, make-to-stock batch production; subsidiary of a multinational; 3 months before vs 3 months after | BR | Peer-reviewed study | Araujo L.F., Queiroz A.A. (2010). Production Leveling (Heijunka) Implementation in a Batch Production System: A Case Study. In: APMS 2009, IFIP AICT 338, Springer: 105-112 |
| Average lot size | average lot size has also been decreased by 18% in monthly average value; monthly set ups increased 10%; service level unchanged | Same case: press stage, make-to-stock, Brazil subsidiary of multinational | BR | Peer-reviewed study | Araujo L.F., Queiroz A.A. (2010). Production Leveling (Heijunka) Implementation in a Batch Production System: A Case Study. In: APMS 2009, IFIP AICT 338, Springer: 105-112 |
| Inter-process inventory | inter-process inventory was reduced to 20% in just five years | Manufacturer of interior subassembly items for commercial jets, low-mix/low-volume; over 5 years | Case study | Koide K., Iwata T. (2007). Kaizen Through Heijunka Production (Leveled Production). SAE Technical Paper 2007-01-3886 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing Toyota Production System - Why, What and How | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | TQM Implementation for Business Excellence | online | self-paced | Rs.2000 | online | owner/MD, plant head, quality head | |
| IIM Mumbai - Open MDP | Business Accelerator Program for MSME | online | 3 days / 18 hours | online | owner/MD | ||
| IIM Calcutta - Executive Education | Advanced Programme in Smart Manufacturing Leadership (APSML) | online | 8 months (Saturday evening live sessions + 4-day campus visit) | Rs. 2,74,000/- + (Applicable Taxes) | online + Kolkata campus | owner/MD, plant head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| milk-run lap time | 15% reduction of milk-run lap time; fewer laps; one vehicle with four wagons serves all lines | automotive component manufacturer, inbound in-plant milk-run redesign with management software | Peer-reviewed study | Tellini T, Silva FJG, Pereira T, Morgado L, Campilho RDSG, Ferreira LP (2019). Improving In-Plant Logistics Flow by Physical and Digital Pathways. Procedia Manufacturing 38:965-974 | |
| milk-run cycle time | 9% average reduction of milk-run cycle time after standardising supply and operator training | automotive component manufacturer, milk-run feeding an assembly line, PDCA project | PT | Peer-reviewed study | Amaral VP, Ferreira AC, Ramos B (2022). Internal Logistics Process Improvement using PDCA: A Case Study in the Automotive Sector. Business Systems Research 13(3):100-115 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | NRLL Series M6 - Lean Tools for Supply Chain Management: JIT and Kanban | online | self-paced | Rs.1500 | online | shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Average efficiency of work centres (real-time OEE) | average efficiency improved by 12.3% in 7 months | Medium-sized eyewear manufacturer, 3 manual assembly work centres, IoT + cloud real-time OEE | BR | Peer-reviewed study | Novochadlo Y.M., Paladini E.P. (2024). Application of real-time overall equipment efficiency indicator in a medium-sized company. Brazilian Journal of Operations & Production Management 21(2):2042 |
| OEE of machining cell | from 36.9 percent OEE to 85 percent OEE; fourth machine not needed | Magellan Aerospace, Kitchener, Ontario; Memex MERLIN monitoring (vendor customer story in trade press) | CA | Vendor-reported | Albert M. (2014). Machine Monitoring Proves Its Worth. Modern Machine Shop |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) | Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0 | classroom | 5 days | Puri | plant head, shop manager, maintenance head | ||
| National Institute for MSME (NI-MSME) | Smart Production Management with AI Decision (SED/SM/4) | classroom | 3 days | Hyderabad | owner/MD, plant head | ||
| National Institute for MSME (NI-MSME) | Smart Factory Design & AI Integration: Building Future-Ready MSME Manufacturing Enterprises (SED/SM/5) | classroom | 3 days | Hyderabad | owner/MD, plant head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Introduction to Digital Factory | classroom | 2 days | Bengaluru | plant head, maintenance head | ||
| IIM Mumbai (formerly NITIE) - Open MDP | Manufacturing & Operational Excellence | online | 3 days / 18 hours | Bulk discount for 5+ participants from same organisation | online | plant head, shop manager, quality head, maintenance head | |
| IIM Calcutta - Executive Education | Advanced Programme in Smart Manufacturing Leadership (APSML) | online | 8 months (Saturday evening live sessions + 4-day campus visit) | Rs. 2,74,000/- + (Applicable Taxes) | online + Kolkata campus | owner/MD, plant head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| defect percentage | defect percentage decreased from 6.51% to 5.84%; annual cost reduction 199,800 baht | nylon synthetic fibre plant (Thailand); fishbone diagram + brainstorming found root causes of yarn breaks and pack changes; fixes implemented (work instructions, inspection sheets, Godet roller check schedule, factorial-DOE pack-change interval). Fishbone combined with Pareto/ECRS/DOE, so effect is of the bundle. | TH | Peer-reviewed study | Sriyanalugsana S., Punnaphasasiphas P. (2024). Defect Reduction in Nylon Fibers Manufacturing Process. Thai Industrial Engineering Network Journal 10(1):1-11 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Basic 7QC Tools | online | self-paced | Rs.250 | online | supervisor, quality head, operator | |
| National Productivity Council (NPC) - e-LEAP | New 7 QC Tools | online | self-paced | Rs.250 | online | shop manager, quality head | |
| National Productivity Council (NPC) - e-LEAP | Problem Analysis and Decision Making | online | self-paced | Rs.250 | online | shop manager, supervisor | |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | 8D Problem Solving Methodology and 7QC Tools | classroom | 2 days | Gurugram | supervisor, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Problem-Solving Tools for Securing our Present & Future | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Chhatrapati Sambhajinagar | shop manager, supervisor |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Certified Specialist in Root Cause Analysis | classroom | 2 days | Pune | supervisor, quality head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| sales vs matched non-adopters | sales almost 9 percentage points higher at ISO 9001 adopters than matched comparison firms (effect appears from year 4) | matched sample of single-plant California firms across industries | US | Working paper | Levine D.I., Toffel M.W. (2010). Quality Management and Job Quality: How the ISO 9001 Standard for Quality Management Systems Affects Employees and Employers. Management Science 56(6):978-996 |
| firm death (disappearance) rate | 0.5% of adopters vs 7.1% of matched controls disappeared by 2003 | 622 matched pairs of California firms | US | Working paper | Levine D.I., Toffel M.W. (2010). Quality Management and Job Quality: How the ISO 9001 Standard for Quality Management Systems Affects Employees and Employers. Management Science 56(6):978-996 |
| wastage and rejection | average wastage & rejection fell from 9.34% to 6.39% after ISO 9000 (machine breakdown 1.60% to 0.51%) | survey of Indian manufacturing organisations, before vs after ISO 9000:2000 | IN | Case study | Maddulety K. (2010). A research study on impact of ISO 9000:2000 on selected key performance indicators of manufacturing organizations in India. Summer Internship Society journal II(1) |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | ISO-9001:2015 and IATF 16949:2016 Quality Management System | online | self-paced | Rs.2000 | online | quality head | |
| Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI) | ZED Certification (Bronze/Silver/Gold) + Gap Analysis & Handholding | certification | Bronze online self-certification; Silver/Gold with site assessment | Registration free | Subsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEs | pan-India | owner/MD, plant head, quality head |
| Indian Statistical Institute - SQC & OR Unit Hyderabad | In-plant training programmes (top management / middle managers / shopfloor supervisors & operators) | in-plant | 1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloor | at client plant | owner/MD, plant head, supervisor, quality head, operator | ||
| Quality Council of India - National Board for Quality Promotion (NBQP), Training & Capacity Building Division | Quality awareness workshops and tailored training / capacity building | in-plant | tailored | pan-India | owner/MD, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Internal Auditor Course - ISO 9001:2015 | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Gurugram | quality head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| unscheduled downtime | 55.55% reduction in unscheduled downtime and 4% increase in OEE (IoT andon + BI dashboard) | genset manufacturing business, single case | Peer-reviewed study | Narassima M.S., Gunasekaran A., Thenarasu M., Gedam V.V., Karuppiah K. (2026). An integrated Lean-IoT-business intelligence model of IS success on the manufacturing shop floor. Production Planning & Control, 1-24 | |
| response time to andon call | about 24 min average to about 5 min within four months (vendor states 75%) | medical device plant, Vandergrift PA, digital andon software | US | Vendor-reported | SmartSights (n.d.). Cook Medical: Next-Generation Andon Case Study. Vendor case study |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing Toyota Production System - Why, What and How | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| inventory level | inventories came down by 47%; lead times down 28% (JIT-Kanban with digital twin, 12 SMEs) | 12 small and medium automotive parts manufacturers, 30-month action research; JIT-Kanban combined with cloud digital twin | SA | Peer-reviewed study | Aldouri SNM (2025). Digital Twin-Enabled Just-In-Time and Kanban Implementation Framework for Industry 4.0 Transformation in SMEs. International Journal of Industrial Engineering and Management 16(4):339-358 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | NRLL Series M6 - Lean Tools for Supply Chain Management: JIT and Kanban | online | self-paced | Rs.1500 | online | shop manager, supervisor | |
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing Toyota Production System - Why, What and How | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| cycle time; productivity | cycle time 80 -> 75 s; productivity +6.7%; line efficiency +2.9% | automotive assembly line | IN | Peer-reviewed study | Sangwa N.R., Sangwan K.S. (2020). Continuous Kaizen Implementation to Improve Leanness: A Case Study of Indian Automotive Assembly Line. Springer, Sustainable Production, Life Cycle Engineering and Management |
| productivity; lead time | productivity +57.15%; lead time -69.47% | small-scale enterprise, kaizen chosen via VSM | IN | Peer-reviewed study | Kumar S., Dhingra A.K., Singh B. (2018). Kaizen Selection for Continuous Improvement through VSM-Fuzzy-TOPSIS in Small-Scale Enterprises: An Indian Case Study. Advances in Fuzzy Systems |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Kaizen | online | self-paced | Rs.250 | online | shop manager, supervisor, operator | |
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| National Productivity Council (NPC) | Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0 | classroom | 5 days | Puri | plant head, shop manager, maintenance head | ||
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| CII Institute of Quality | Lean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior management | handholding/consulting | engagement-based | Bengaluru (pan-India delivery) | owner/MD, plant head, quality head | ||
| CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), Mumbai | In-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safety | in-plant | tailored | Mumbai (delivered pan-India) | plant head, shop manager, supervisor | ||
| Quality Circle Forum of India (QCFI) | 40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yoke | classroom | 4 days | Bhubaneswar | shop manager, supervisor, operator | ||
| Quality Circle Forum of India (QCFI) - chapters | Chapter Conventions on Quality Concepts (CCQC 2026) - Tirupati, Nagpur, Pune (virtual) | classroom | 1-2 days | Tirupati; Nagpur; Pune (virtual) | supervisor, operator | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | World Class Manufacturing - What, Why and How; Tools and Techniques | classroom | 2 days | Bengaluru | owner/MD, plant head | ||
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager | ||
| ACMA (Automotive Component Manufacturers Association of India) | E-learning: Material Flow Cost Accounting (MFCA) incl. MFCA in Kaizen and supply chain | online | self-paced modules | online | plant head, quality head | ||
| ACMA regional chapters | Regional Kaizen Competition; Poka Yoke & SMED Competition (ACMA North / West) | classroom | 1 day | NCR / Uttarakhand; Pune | shop manager, supervisor, operator |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| WIP; kanban cards; replenishment time | WIP -27.79% (~20,000 units); cards 48 -> 38; replenishment 6.94 -> 6.53 days | bearing manufacturer (authors from Pune) | IN | Peer-reviewed study | Ukey K., Gajghate S.S., Kumar S., Kumar Behera A., Majumder H. (2025). Execution of Pull System and Constant Work-in-Process Using Kanban System - A Case Study. Engineering Proceedings (MDPI) |
| WIP between process steps | -56% (injection -> painting); -45% (painting -> dispatch) | SME, polymer automotive parts, with SMED and levelling | PT | Peer-reviewed study | Martins B. et al. (2021). Implementation of a Pull System - A Case Study of a Polymeric Production System for the Automotive Industry. Management Systems in Production Engineering 29(4):253-259 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | NRLL Series M6 - Lean Tools for Supply Chain Management: JIT and Kanban | online | self-paced | Rs.1500 | online | shop manager, supervisor | |
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Materials Management and Inventory Control | classroom | 2 days | Bengaluru | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| operator walk time; line side storage space; inventory value | operator walk time -78.3%; line side storage space -69%; inventory value -54.3%; line side replenishment -29.6% | excavator engine assembly line, Bangalore (with Caterpillar logistics); continuous supply replaced by lean kitting | IN | Case study | Ramappa R., Sharath Kumar K.M., Nairy A.K. (2013). Improvement of Material Feeding System for an Excavator Assembly Line through Lean Principles. SASTECH Journal 12(2):27- |
| material flow lead time | material flow lead time -28.55%; non value added activities -11.91% | automotive booster assembly line, mixed-model plant; continuous supply replaced by lean supply kitting (Pune authors) | IN | Case study | Karandikar V., Sane S., Pulkurte R. (2014). Improvement in Line feeding System in Assembly Plant using Lean Manufacturing Techniques. International Journal of Current Engineering and Technology 4(3):1594-1599 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| IIM Mumbai - Open MDP | Warehouse Design & Automation | classroom | 3 days | Mumbai | plant head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Total Gage R&R | Total Gage R&R from 67.80% to 10.11% after adding a Go/No-Go pin | automotive stamped part Reinf BK6, 2 operators x 10 parts x 3 repeats | ID | Case study | Sumasto F., Nugroho Y.A., Purwojatmiko B.H., Wirandi M., Imansuri F., Aisyah S. (2023). Implementation of Measurement System Analysis to Reduce Measurement Process Failures on Part Reinf BK6. IJIEM - Indonesian Journal of Industrial Engineering and Management 4(2):212 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | ISO-9001:2015 and IATF 16949:2016 Quality Management System | online | self-paced | Rs.2000 | online | quality head | |
| Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology Centre | Jr. Technician - Inspection & Quality Control (NSQF) | classroom | 6 months / 600 hrs | ₹ 22,000/- | No fee for SC/ST (NSQF courses) | Bhubaneswar | supervisor, operator |
| Indian Statistical Institute - SQC & OR Unit Hyderabad | In-plant training programmes (top management / middle managers / shopfloor supervisors & operators) | in-plant | 1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloor | at client plant | owner/MD, plant head, supervisor, quality head, operator | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Fundamentals of APQP and Implementation of PPAP | classroom | 2 days | Hosur | quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Measurement System Analysis (MSA) | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Pune | supervisor, quality head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| typical OEE level | ~55% (about 20 cases); performance losses dominate | field study of manufacturing cases | SE | Peer-reviewed study (baseline, not a result) | Ljungberg O. (1998). IJOPM 18(5):495-507 |
| typical OEE level with automatic measurement | average 65% (23 companies, 884 machines); ~half of losses unclassified | automatic OEE measurement, discrete manufacturing | SE | Peer-reviewed study (baseline, not a result) | Hedman R., Subramaniyan M., Almstrom P. (2016). Analysis of critical factors for automatic measurement of OEE. Procedia CIRP 57:128-133 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Total Productive Maintenance (TPM): Basic Programme | online | self-paced | Rs.1200 | online | shop manager, supervisor, maintenance head | |
| National Productivity Council (NPC) | Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0 | classroom | 5 days | Puri | plant head, shop manager, maintenance head | ||
| National Institute for MSME (NI-MSME) | Smart Production Management with AI Decision (SED/SM/4) | classroom | 3 days | Hyderabad | owner/MD, plant head | ||
| CII TPM Club India (CII-IQ) | CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membership | certification | assessment-based | pan-India | owner/MD, plant head, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Machine Breakdown Analysis | classroom | 2 days | Pune | supervisor, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Enhancing Productivity in Grinding Operations | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Hosur | shop manager, supervisor, operator |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Understanding TPM and Roadmap for Implementation of TPM | classroom | 2 days | Hosur | plant head, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Introduction to Digital Factory | classroom | 2 days | Bengaluru | plant head, maintenance head | ||
| IIM Mumbai (formerly NITIE) - Open MDP | Manufacturing & Operational Excellence | online | 3 days / 18 hours | Bulk discount for 5+ participants from same organisation | online | plant head, shop manager, quality head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Return on assets (ROA), average of 4 periods after vs 4 before introducing OLE | average ROA increased by 1.4% | Czech manufacturing company, introduction of OLE indicator | CZ | Peer-reviewed study | Brabec Z., Jacova H. (2022). Overall Labor Effectiveness as a Tool for Measuring Performance in a Given Company. ACC Journal 28(2) |
| EBIT per converted employee | average EBIT per converted employee increased by approximately 20,000 CZK | Czech manufacturing company, introduction of OLE indicator | CZ | Peer-reviewed study | Brabec Z., Jacova H. (2022). Overall Labor Effectiveness as a Tool for Measuring Performance in a Given Company. ACC Journal 28(2) |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| process rejection rate from dominant cause (inappropriate composition) | rejection rate 2.54% -> 0.82%; dominant cause = 84% of total rejection; unit cost -2.50% | pharmaceutical drug production; Pareto + SPC + fishbone within HACCP | Peer-reviewed study | Kharub M. (2020). Integrating the HACCP and SPC for hazard control and process improvement: a case of pharmaceutical industry. International Journal of Pharmaceutical and Healthcare Marketing 14(4):561-586 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Basic 7QC Tools | online | self-paced | Rs.250 | online | supervisor, quality head, operator | |
| Quality Circle Forum of India (QCFI) HQ | Webinar on 'Basic Statistical Analysis' | online | 2 days (10 AM - 4 PM) | online | supervisor, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | 8D Problem Solving Methodology and 7QC Tools | classroom | 2 days | Gurugram | supervisor, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Problem-Solving Tools for Securing our Present & Future | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Chhatrapati Sambhajinagar | shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| operator travel distance per standard task cycle | operator travel distance in the classification area from 25.99 m to 18.16 m (-30.13%) | mid-size frozen fruit processor (Peru); SLP layout redesign physically built ('the plant area was physically restructured to match the proposed layout'), 4-month pilot with tracked indicators. | PE | Case study | Diaz Espinoza N., Leon Berrios C.X., Tupia-De-La-Cruz E.L. (2025). Enhancing Productivity through Lean and Layout Redesign: A Case Study in the Frozen Fruit Industry in Peru. IRJEMS 4(5):217-232. doi:10.56472/25835238/IRJEMS-V4I5P131 |
| productivity | productivity from 621 kg/h to 847 kg/h (+36.4%) | same Peruvian frozen fruit plant; layout redesign bundled with 5S, standard work and Andon, so layout share not isolated. | PE | Case study | Diaz Espinoza N., Leon Berrios C.X., Tupia-De-La-Cruz E.L. (2025). Enhancing Productivity through Lean and Layout Redesign: A Case Study in the Frozen Fruit Industry in Peru. IRJEMS 4(5):217-232. doi:10.56472/25835238/IRJEMS-V4I5P131 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Industrial Engineering Tools for Productivity Improvement | online | self-paced | Rs.2000 | online | shop manager, supervisor | |
| National Institute for MSME (NI-MSME) | Smart Factory Design & AI Integration: Building Future-Ready MSME Manufacturing Enterprises (SED/SM/5) | classroom | 3 days | Hyderabad | owner/MD, plant head | ||
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor | ||
| IIM Mumbai - Open MDP | Warehouse Design & Automation | classroom | 3 days | Mumbai | plant head | ||
| IIT Kanpur + IIM Calcutta + IIT Madras | PGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturing | classroom | 1 year full-time residential (incl. Japan immersion) | Kanpur / Kolkata / Chennai | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| scrap rate; OEE | scrap 1.18% -> 0.56% (-52.5%); OEE 85% -> 90% | CNC turning of automotive shafts, low-cost mechanical device | PT | Peer-reviewed study | Alcacer V., Costa J., Ferreira R., Mendes D. (2026). Mechanical error-proofing in CNC turning: industrial validation of a Poka-Yoke device for scrap reduction. Production (SciELO) |
| monthly rejections | 12-56 per month (Jun-Dec 2016) -> 0 (Jan-Jun 2017) | horn assembly line, Coimbatore | IN | Case study | Premanand N., Kannan V., Sangeetha P., Umamaheswari S. (2018). A Study on Implementation of Poka-Yoke Technique in Improving the Operational Performance by Reducing the Rejection Rate in the Assembly Line. Int. J. Pure and Applied Mathematics 119(17):2177-2191 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| Quality Circle Forum of India (QCFI) | 40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yoke | classroom | 4 days | Bhubaneswar | shop manager, supervisor, operator | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing Toyota Production System - Why, What and How | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager |
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager | ||
| ACMA regional chapters | Regional Kaizen Competition; Poka Yoke & SMED Competition (ACMA North / West) | classroom | 1 day | NCR / Uttarakhand; Pune | shop manager, supervisor, operator |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| breakdowns eliminated | Elimination of breakdowns: 70% to 75%; reduction in downtime 35% to 45%; reduction in maintenance costs 25% to 30% (industrial averages from independent surveys) | industrial facilities starting a functional predictive maintenance programme; survey averages quoted by US DOE FEMP | US | Case study | US DOE Federal Energy Management Program (2010). Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0, Ch.5 Types of Maintenance Programs. PNNL for US DOE FEMP |
| unplanned downtime | 30% unplanned downtime reduced; 12% total maintenance cost decreased | rotating equipment, one aluminium processing plant, vibration + shock-pulse monitoring | Peer-reviewed study | Gomes G., Ungureanu N.S., Kalácska G. (2025). Optimizing predictive maintenance for maintenance management development: a hybrid approach using vibration and shock-pulse monitoring. Review of Management and Economic Engineering 24(4):260-271 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Maintenance - Objectives, Types and Functions | online | self-paced | Rs.250 | online | supervisor, maintenance head | |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Care for Machine Tool Spindles - Systematic Approach for Spindle Maintenance | classroom | 3 days | Rs. 6999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | maintenance head |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Effective Maintenance Towards Zero Down Time (ZDT) - Electrical Aspects of CNC Machines | classroom | 3 days | Rs. 6999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| breakdowns (number), year 3 of TPM | 25-40% drop in year 1 (model machines), 40-60% in year 2, 70-80% in year 3 | ~70 TPM-practicing companies (domestic and overseas), PM pillar together with JH; auto, ancillary, FMCG, appliances, packing, plastic, refinery, tyres, steel | IN | Case study | Raj B.K. (2021). Benefits of Planned Maintenance - An Analysis of Equipment Failure & Maintenance Costs in 70 TPM Practicing Companies. CII Institute of Quality, Article TPM/2021/02 |
| MTBF | indicative tangible benefits: 80% breakdown reduction, 200% MTBF increase, 35% maintenance cost reduction, 31% MTTR reduction | ~70 TPM-practicing companies (domestic and overseas), CII benchmark | IN | Case study | Raj B.K. (2021). Benefits of Planned Maintenance - An Analysis of Equipment Failure & Maintenance Costs in 70 TPM Practicing Companies. CII Institute of Quality, Article TPM/2021/02 |
| breakdowns due to failure (CNC machining centres; lathes -23%) | breakdowns -23% on CNC lathes, -38% on CNC machining centres; OEE +5% | clutches and hydraulic controls manufacturer; CNC lathe and machining-centre cells; AM procedures + PM plans | PT | Peer-reviewed study | Pinto G., Silva F.J.G., Baptista A., Fernandes N.O., Casais R., Carvalho C. (2020). TPM implementation and maintenance strategic plan - a case study. Procedia Manufacturing 51:1423-1430 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Total Productive Maintenance (TPM): Basic Programme | online | self-paced | Rs.1200 | online | shop manager, supervisor, maintenance head | |
| National Productivity Council (NPC) - e-LEAP | Maintenance - Objectives, Types and Functions | online | self-paced | Rs.250 | online | supervisor, maintenance head | |
| National Productivity Council (NPC) - e-LEAP | Preventive Maintenance | online | self-paced | Rs.250 | online | supervisor, maintenance head, operator | |
| Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology Centre | Sr. Technician - Machine Maintenance & Automation (NSQF) | classroom | 6 months / 600 hrs | ₹ 33,810/- | No fee for SC/ST (NSQF courses) | Bhubaneswar | maintenance head, operator |
| CII TPM Club India (CII-IQ) | CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membership | certification | assessment-based | pan-India | owner/MD, plant head, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Care for Machine Tool Spindles - Systematic Approach for Spindle Maintenance | classroom | 3 days | Rs. 6999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | maintenance head |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Machine Breakdown Analysis | classroom | 2 days | Pune | supervisor, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Maintenance and Troubleshooting of Hydraulics and Pneumatics Systems | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Ghaziabad | maintenance head, operator |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Understanding TPM and Roadmap for Implementation of TPM | classroom | 2 days | Hosur | plant head, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Effective Maintenance Towards Zero Down Time (ZDT) - Electrical Aspects of CNC Machines | classroom | 3 days | Rs. 6999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| overall defect rate | overall defect rate was reduced by 87.2% | medical device manufacturer, FMEA-based integrated framework | MY | Peer-reviewed study | Liew C.F., Prakash J., Ong K.S. (2019). An FMEA-based integrated framework to quantify and improve operational performance in advanced manufacturing environments: a case study. International Journal of Productivity and Quality Management 28(3):318-339 |
| OEE | OEE from 87% to 92%; breakdown time 111 to 85 min/month | cylinder block machining line, automotive, FMEA within DMAIC | ID | Peer-reviewed study | Rozak A., Jaqin C., Hasbullah H. (2020). Increasing Overall Equipment Effectiveness in Automotive Company Using DMAIC and FMEA Method. Journal Europeen des Systemes Automatises 53(1):55-60 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | ISO-9001:2015 and IATF 16949:2016 Quality Management System | online | self-paced | Rs.2000 | online | quality head | |
| National Productivity Council (NPC) - e-LEAP | Hazard Identification and Risk Analysis | online | self-paced | Rs.250 | online | shop manager, supervisor | |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Fundamentals of APQP and Implementation of PPAP | classroom | 2 days | Hosur | quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | How to become an effective FMEA Practitioner (AIAG & VDA) | classroom | 2 days | Hosur | quality head |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Quality, Waste Minimization & Safety Circles | online | self-paced | Rs.250 | online | supervisor, operator | |
| National Productivity Council (NPC) - e-LEAP | TQM Implementation for Business Excellence | online | self-paced | Rs.2000 | online | owner/MD, plant head, quality head | |
| Quality Council of India - National Board for Quality Promotion (NBQP), Training & Capacity Building Division | Quality awareness workshops and tailored training / capacity building | in-plant | tailored | pan-India | owner/MD, quality head | ||
| Quality Circle Forum of India (QCFI) | 40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yoke | classroom | 4 days | Bhubaneswar | shop manager, supervisor, operator | ||
| Quality Circle Forum of India (QCFI) - chapters | Chapter Conventions on Quality Concepts (CCQC 2026) - Tirupati, Nagpur, Pune (virtual) | classroom | 1-2 days | Tirupati; Nagpur; Pune (virtual) | supervisor, operator |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| breakdown level (filling machine) | breakdown level reduced 40-60% vs semester 1 of 2018 | food and beverage, filling machine type A, Nutrifood Cibitung factory; autonomous maintenance tasks designed via FMEA-RCM | ID | Peer-reviewed study | Iswidibyo D., Nugroho G., Imam A., Junianto H., Astutik R., Hadi T., Puspasari K. (2019). Developing Autonomous Maintenance through FMEA-RCM Models to Reduce % Machine Breakdown in Food and Beverages Industry. Proc. ICIB 2019, SciTePress, pp.635-639. doi:10.5220/0008434706350639 |
| breakdown downtime | breakdown downtime down 947, 814 and 899 min/month on three machines; failure rate down 6.29%, 6.97%, 6.69% | vermicelli factory, three machines | TH | Peer-reviewed study | Klomjit P., Pasuktree P. (2016). The Application of Reliability Centered Maintenance in The Sample Factory. Thai Industrial Engineering Network Journal 2(2):35-41 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Machine Breakdown Analysis | classroom | 2 days | Pune | supervisor, maintenance head |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Introduction to Works Planning and Control | online | self-paced | Rs.250 | online | plant head, shop manager | |
| National Productivity Council (NPC) - e-LEAP | Materials Requirement Planning | online | self-paced | Rs.250 | online | plant head, shop manager | |
| IIM Calcutta - Executive Education | Advanced Programme in Smart Manufacturing Leadership (APSML) | online | 8 months (Saturday evening live sessions + 4-day campus visit) | Rs. 2,74,000/- + (Applicable Taxes) | online + Kolkata campus | owner/MD, plant head | |
| IIT Kanpur + IIM Calcutta + IIT Madras | PGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturing | classroom | 1 year full-time residential (incl. Japan immersion) | Kanpur / Kolkata / Chennai | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| defects per unit; first-time yield; OEE; savings | DPU 0.18 -> 0.0068; FTY 83.5% -> 99.32%; OEE 0.48 -> 0.83; ~$140,000/yr | aluminium die-casting SME, 150 employees, 3 shifts (Lean Sigma: DMAIC + VSM + 5S + TPM) | IN | Peer-reviewed study | Kumar M., Antony J., Singh R.K., Tiwari M.K., Perry D. (2006). Implementing the Lean Sigma framework in an Indian SME: a case study. Production Planning & Control 17(4):407-423 |
| process sigma level; savings | sigma 1.40 -> 5.46; Rs 0.288 million per annum | SME, bicycle-chain bushes | IN | Peer-reviewed study | Kaushik P., Khanduja D., Mittal K., Jaglan P. (2012). TQM Journal 24(1):4-16 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| Indian Statistical Institute - SQC & OR Unit Hyderabad | In-plant training programmes (top management / middle managers / shopfloor supervisors & operators) | in-plant | 1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloor | at client plant | owner/MD, plant head, supervisor, quality head, operator | ||
| CII Institute of Quality | Lean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior management | handholding/consulting | engagement-based | Bengaluru (pan-India delivery) | owner/MD, plant head, quality head | ||
| IIT Kanpur + IIM Calcutta + IIT Madras | PGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturing | classroom | 1 year full-time residential (incl. Japan immersion) | Kanpur / Kolkata / Chennai | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| sewing line efficiency; labour productivity | Efficiency +21%, labour productivity +22% (balanced layout with multi-skilled manpower) | apparel sewing line; multi-skilling combined with line balancing and modular/traditional layout | Peer-reviewed study | Shumon, M.R.H., Arif-Uz-Zaman, K., Rahman, A. (2012). Productivity improvement through balancing process using multi-skilled manpower in apparel industries. International Journal of Industrial and Systems Engineering 11(1/2):31- |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Supervisor and His Job | online | self-paced | Rs.250 | online | supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| die changeover time | -43% to -45%; OEE 70% after | forging plant, die change on three press capacities | Peer-reviewed study | Sundaramali G., Kandavel T.K., Santhosh Raj K., Anirudh S. (2024). Application of SMED to improve overall equipment effectiveness of die change over activities in a forging industry - a case study. Int. J. Productivity and Quality Management 42(4):445-458 | |
| welding machine changeover time | -61%; >40 min of production time recovered (+4 gratings, efficiency +4.77%) | bridge-grating production line, welding station | PL | Peer-reviewed study | Ocieczek W., Krasniewski D., Furman J. (2025). Implementation of the SMED method on a production line to improve work efficiency. Production Engineering Archives |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | NRLL Series M7 - Lean Tools: Single Minute Exchange of Dies (SMED) | online | self-paced | Rs.1500 | online | shop manager, supervisor, maintenance head | |
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| Quality Circle Forum of India (QCFI) | 40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yoke | classroom | 4 days | Bhubaneswar | shop manager, supervisor, operator | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing Toyota Production System - Why, What and How | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Quick Changeover Techniques (SMED) in Discrete Manufacturing | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Chhatrapati Sambhajinagar | shop manager, supervisor |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Quick Changeover Techniques (SMED) in Discrete Manufacturing | classroom | 2 days | Hosur | shop manager, supervisor | ||
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager | ||
| ACMA regional chapters | Regional Kaizen Competition; Poka Yoke & SMED Competition (ACMA North / West) | classroom | 1 day | NCR / Uttarakhand; Pune | shop manager, supervisor, operator | ||
| IIM Mumbai (formerly NITIE) - Open MDP | Manufacturing & Operational Excellence | online | 3 days / 18 hours | Bulk discount for 5+ participants from same organisation | online | plant head, shop manager, quality head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| total distance traveled | total distance traveled reduced by 61.2% (with lead time -23.66%, WIP -8.6%) | Hibret Manufacturing & Machine Building Industries, machine building; VSM + spaghetti diagram | ET | Peer-reviewed study | Gebeyehu S.G., Abebe M., Gochel A. (2022). Production lead time improvement through lean manufacturing. Cogent Engineering 9(1) |
| total walking distance of inspection process | 87 m -> 38.50 m (-55.75%); operators -33.33% | incoming inspection of car-body (chassis) auto parts; spaghetti chart + container relocation | TH | Case study | Phakdeewanich C., Thongphrom S. (2020). Efficiency improvement of incoming auto-part inspection: a case study of car body [Thai]. PSRU Journal of Industrial Technology and Engineering 2(2):37-51 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Value Stream Mapping | online | self-paced | Rs.1500 | online | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Output per 7 h shift (core making workstation) | SW saved 31.6 s per cycle, production up to 58 pieces per 7 h shift (vs 45-50 actual, 54 capacity); productivity up to 6.5 percent | Core making process (bottleneck workstation) in a manufacturing company; no investment in machinery or tooling | Peer-reviewed study | Mor R.S., Bhardwaj A., Singh S., Sachdeva A. (2019). Productivity gains through standardization-of-work in a manufacturing company. Journal of Manufacturing Technology Management 30(6):899-919 | |
| Assembly line downtime | 36 minutes reduction in assembly time, 200 m less operator movement on average, 9.6% reduction in assembly line downtime | Medium chassis assembly line, company in South Brazil | BR | Peer-reviewed study | Fin J.C., Vidor G., Cecconello I., Machado V.C. (2017). Improvement based on standardized work: an implementation case study. Brazilian Journal of Operations & Production Management 14(3):388-395 |
| Output per man-hour | production output from 45 pieces to 54 pieces per man hour (table states 16.67% increase); attainment 95.79% to 98.95% | Automotive assembly line, Malaysia | MY | Peer-reviewed study | Abdul Halim N.H., Jaffar A., Yusof N., Jaafar R., Adnan A.N., Mohd Salleh N.A., Azira N.N. (2015). Standardized work in TPS production line. Jurnal Teknologi 76(6):73-78 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | NRLL Series M4 - Productivity Improvement through Line Balancing | online | self-paced | Rs.1500 | online | shop manager, supervisor | |
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| National Productivity Council (NPC) - e-LEAP | Industrial Engineering Tools for Productivity Improvement | online | self-paced | Rs.2000 | online | shop manager, supervisor | |
| National Productivity Council (NPC) - e-LEAP | Supervisor and His Job | online | self-paced | Rs.250 | online | supervisor | |
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), Mumbai | In-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safety | in-plant | tailored | Mumbai (delivered pan-India) | plant head, shop manager, supervisor | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing Toyota Production System - Why, What and How | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Enhancing Productivity in Grinding Operations | classroom | 2 days | Rs. 4999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Hosur | shop manager, supervisor, operator |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Lean Daily Work Management (DWM) System | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Cpk of drop impact resistance | Cpk index was increased from 0.48 to 1.79 | aluminium two-piece beverage can manufacturer, SPC via PDCA | ID | Peer-reviewed study | Sunadi S., Purba H.H., Hasibuan S. (2020). Implementation of Statistical Process Control through PDCA Cycle to Improve Potential Capability Index of Drop Impact Resistance: A Case Study at Aluminum Beverage and Beer Cans Manufacturing Industry in Indonesia. Quality Innovation Prosperity 24(1):104-127 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Basic 7QC Tools | online | self-paced | Rs.250 | online | supervisor, quality head, operator | |
| National Productivity Council (NPC) - e-LEAP | Inspection for Quality Control | online | self-paced | Rs.250 | online | supervisor, quality head, operator | |
| National Productivity Council (NPC) - e-LEAP | ISO-9001:2015 and IATF 16949:2016 Quality Management System | online | self-paced | Rs.2000 | online | quality head | |
| Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology Centre | Jr. Technician - Inspection & Quality Control (NSQF) | classroom | 6 months / 600 hrs | ₹ 22,000/- | No fee for SC/ST (NSQF courses) | Bhubaneswar | supervisor, operator |
| Indian Statistical Institute - SQC & OR Unit Hyderabad | In-plant training programmes (top management / middle managers / shopfloor supervisors & operators) | in-plant | 1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloor | at client plant | owner/MD, plant head, supervisor, quality head, operator | ||
| Quality Circle Forum of India (QCFI) HQ | Webinar on 'Basic Statistical Analysis' | online | 2 days (10 AM - 4 PM) | online | supervisor, quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Fundamentals of APQP and Implementation of PPAP | classroom | 2 days | Hosur | quality head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing SPC, a Game Changer for Cost Reduction | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Pune | supervisor, quality head |
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Implementing SPC, a Game Changer for Cost Reduction | classroom | 2 days | Bengaluru | supervisor, quality head | ||
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Productivity on lines reengineered by buyer's supplier development team | average productivity gains of 50% on lines reengineered by BP | Honda of America BP programme, US automotive suppliers, 1994 | US | Peer-reviewed study | MacDuffie J.P., Helper S. (1997). Creating Lean Suppliers: Diffusing Lean Production through the Supply Chain. California Management Review 39(4):118-151 |
| Overall cost competitiveness profile (composite) | Overall cost competitiveness profile of ACMA firms improved by 13.3% | Indian auto-component SMEs, UNIDO-ACMA-DHI cluster/supplier development programme, 152 firms, 2014-2018 | IN | Case study | UNIDO Independent Evaluation Division (2018). Independent Terminal Project Evaluation: Supporting SMEs in the automotive component industry in India (UNIDO-ACMA-DHI Partnership Programme), project 100245 |
| Supplier product defects (range across firms) | Reducing product defects by 5 - 90%; improving on-time delivery by 6 - 15% | US firms, Supplier Development research of NC State Supply Chain Resource Cooperative | US | Case study | Supply Chain Resource Cooperative, NC State University (2002). Supplier Development Strategies and Outcomes |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI) | ZED Certification (Bronze/Silver/Gold) + Gap Analysis & Handholding | certification | Bronze online self-certification; Silver/Gold with site assessment | Registration free | Subsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEs | pan-India | owner/MD, plant head, quality head |
| Indian Statistical Institute - SQC & OR Unit Hyderabad | In-plant training programmes (top management / middle managers / shopfloor supervisors & operators) | in-plant | 1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloor | at client plant | owner/MD, plant head, supervisor, quality head, operator | ||
| CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), Mumbai | In-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safety | in-plant | tailored | Mumbai (delivered pan-India) | plant head, shop manager, supervisor | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Fundamentals of APQP and Implementation of PPAP | classroom | 2 days | Hosur | quality head | ||
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Line cycle time vs takt | line CT was reduced by 16.0%, from 78.0 sec to 65.5 sec, managed to be lower than line takt time | Automotive assembly line (TPS line), Malaysia; takt set from 5 months demand, line rebalanced and standard work applied | MY | Peer-reviewed study | Abdul Halim N.H., Jaffar A., Yusof N., Jaafar R., Adnan A.N., Mohd Salleh N.A., Azira N.N. (2015). Standardized work in TPS production line. Jurnal Teknologi 76(6):73-78 |
| Average overtime | Average overtime was reduced from 193.56 hours to 55.0 hours per month | Same automotive assembly line, Malaysia, after balancing to takt | MY | Peer-reviewed study | Abdul Halim N.H., Jaffar A., Yusof N., Jaafar R., Adnan A.N., Mohd Salleh N.A., Azira N.N. (2015). Standardized work in TPS production line. Jurnal Teknologi 76(6):73-78 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | NRLL Series M4 - Productivity Improvement through Line Balancing | online | self-paced | Rs.1500 | online | shop manager, supervisor | |
| IIM Mumbai (formerly NITIE) - Open MDP | Manufacturing & Operational Excellence | online | 3 days / 18 hours | Bulk discount for 5+ participants from same organisation | online | plant head, shop manager, quality head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| lead time; inventory; due-date performance; revenue/throughput | lead time -69% (n=32); inventory -50% (n=28); due-date performance +60% (n=12); revenue/throughput +68% | review of published TOC applications, mostly manufacturing | Review of studies | Balderstone S.J., Mabin V.J. (c.1998). A Review of Goldratt's Theory of Constraints (TOC) - lessons from the international literature. Victoria University of Wellington (basis of Mabin & Balderstone 2003, IJOPM 23(6):568-595, doi 10.1108/01443570310476636) |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| work efficiency (model production) | efficiency increased 53 percent; model production capacity reached 237 | tea-glass manufacturer, model production (moulder work), time survey vs standard time | TR | Peer-reviewed study | Duran C., Cetindere A., Aksu Y.E. (2015). Productivity Improvement by Work and Time Study Technique for Earth Energy-glass Manufacturing Company. Procedia Economics and Finance 26:109-113 |
| overall productivity | 14% productivity increase; annual financial gain 21,84,000 (currency not stated, INR format) | sheet-metal stamping, Piaggio Ape 3-wheeler mid-body frame line, Budhale Stampings | IN | Case study | Shinde A., Jadhav P., Oswal A. (2023). Productivity Improvement by using Time Study: A Case Study on Mid Body Frame Manufacturing. International Journal For Multidisciplinary Research 5(6) |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Industrial Engineering Tools for Productivity Improvement | online | self-paced | Rs.2000 | online | shop manager, supervisor | |
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor | ||
| IIM Mumbai (formerly NITIE) - Open MDP | Manufacturing & Operational Excellence | online | 3 days / 18 hours | Bulk discount for 5+ participants from same organisation | online | plant head, shop manager, quality head, maintenance head |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| OEE; breakdown time; rejection; production | OEE +17.08%; breakdown time -23.14%; rejection -17.94%; production +15.63% | manufacturing unit, North India | IN | Peer-reviewed study | Singh J., Singh H., Sharma V. (2018). Success of TPM concept in a manufacturing unit - a case study. IJPPM 67(3):536-549 |
| OEE | 51.39% -> 58.81% | jute bag plant | BD | Peer-reviewed study | Haider M.M.N., Rafiquzzaman M. (2023). Implementation of Total Productive Maintenance in a Jute Bag Industry: a Case Study. J. Engineering Science 14(1):137-149 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Total Productive Maintenance (TPM): Basic Programme | online | self-paced | Rs.1200 | online | shop manager, supervisor, maintenance head | |
| National Productivity Council (NPC) | Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0 | classroom | 5 days | Puri | plant head, shop manager, maintenance head | ||
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| CII TPM Club India (CII-IQ) | CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membership | certification | assessment-based | pan-India | owner/MD, plant head, maintenance head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | World Class Manufacturing - What, Why and How; Tools and Techniques | classroom | 2 days | Bengaluru | owner/MD, plant head | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Understanding TPM and Roadmap for Implementation of TPM | classroom | 2 days | Hosur | plant head, maintenance head | ||
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager | ||
| IIT Kanpur + IIM Calcutta + IIT Madras | PGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturing | classroom | 1 year full-time residential (incl. Japan immersion) | Kanpur / Kolkata / Chennai | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| firm productivity vs non-trained applicants | +6% productivity within one year, rising to +27% after ten years | 11,575 US firms that applied to the TWI programme 1940-45; trained vs non-trained applicants | US | Working paper | Bianchi, N., Giorcelli, M. (2022). The Dynamics and Spillovers of Management Interventions: Evidence from the Training within Industry Program. Journal of Political Economy 130(6):1630-1675 (figures from NBER Working Paper 28833, 2021) |
| share of companies with production up at least 25% | 86% of 600 companies increased production by at least 25%; 100% reduced training time by 25% or more; 55% reduced scrap by at least 25% | 1945 TWI programme report, 600 participating US companies (cited secondhand) | US | Case study | Misiurek, B., Koch, T. (2014). Teaching formula of the training for operators on effective application of lean management tools. Management and Production Engineering Review 5(1):21-27 |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| component cost reduction | rotor 30%, pump body 4%, stator housing 10% cost reduction | fuel-dispenser Global Pumping Unit, Indian retail market | IN | Peer-reviewed study | Bhosle, A., Sah, A., Shinde, D. K. (2020). Application of Value Analysis and Value Engineering for Cost Reduction of Global Pumping Unit. In: Advances in Simulation, Product Design and Development, Springer, pp. 663-674 |
| component cost reduction | cost reductions of up to 36% of initial component cost | product engineering department of an automotive company, mass-produced components | BR | Peer-reviewed study | Candido, G. M., Kaminski, P. C. (2008). Product value optimisation engineering applied to current component designs: a case study from the Brazilian automotive industry. International Journal of Automotive Technology and Management 8(3):270 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Value Analysis | online | self-paced | Rs.250 | online | owner/MD, plant head | |
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| lead time; WIP; cost | lead time -27%; WIP -27% to -32%; INR 2,17,728 value-added cost saving | small-scale industry, Kerala | IN | Peer-reviewed study | Menon B.R., Shalij P.R., Kiron K.R., Sreejith J., Sajeesh P. (2020). Cost value stream mapping as a lean assessment tool in a small-scale industry. IJPQM 30(1):72-91 |
| lead time; WIP; scrap | lead time -81%; WIP -91%; scrap -90% | automobile rubber components (oil seals); bundled with new oven, auto-trimming and kanban | IN | Peer-reviewed study | Pradeep A., Balaji K. (2022). Reduction of lead time in an automobile rubber components manufacturing process through value stream mapping. Proc IMechE Part E |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Value Stream Mapping | online | self-paced | Rs.1500 | online | plant head, shop manager | |
| National Productivity Council (NPC) - e-LEAP | Rapid Lean Learning Course | online | self-paced | Rs.7080 | online | plant head, shop manager | |
| National Productivity Council (NPC) | Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0 | classroom | 5 days | Puri | plant head, shop manager, maintenance head | ||
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| CII Institute of Quality | Lean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior management | handholding/consulting | engagement-based | Bengaluru (pan-India delivery) | owner/MD, plant head, quality head | ||
| CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), Mumbai | In-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safety | in-plant | tailored | Mumbai (delivered pan-India) | plant head, shop manager, supervisor | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | World Class Manufacturing - What, Why and How; Tools and Techniques | classroom | 2 days | Bengaluru | owner/MD, plant head | ||
| ACMA Centre for Technology (ACT) - ACMA Cluster Programme | ACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital) | handholding/consulting | multi-month cluster (duration not printed in source) | auto-component hubs (Pune, NCR, Chennai etc.) | owner/MD, plant head, shop manager | ||
| ACMA (Automotive Component Manufacturers Association of India) | E-learning: Material Flow Cost Accounting (MFCA) incl. MFCA in Kaizen and supply chain | online | self-paced modules | online | plant head, quality head | ||
| IIM Mumbai (formerly NITIE) - Open MDP | Manufacturing & Operational Excellence | online | 3 days / 18 hours | Bulk discount for 5+ participants from same organisation | online | plant head, shop manager, quality head, maintenance head | |
| IIT Kanpur + IIM Calcutta + IIT Madras | PGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturing | classroom | 1 year full-time residential (incl. Japan immersion) | Kanpur / Kolkata / Chennai | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| downstream inventory level | VMI decision-transfer reduces inventory levels by 7% on average | econometric analysis of item-level data from distributors with actual VMI programmes vs information-sharing only (US); effect beyond information sharing. | US | Peer-reviewed study | Dong Y., Dresner M., Yao Y. (2014). Beyond Information Sharing: An Empirical Analysis of Vendor-Managed Inventory. Production and Operations Management 23(5):817-828 |
| stockouts | VMI decision-transfer reduces stockouts by 31% on average (benefit mostly after first year) | same distributor item-level dataset (US); stockout reduction more likely realised after the first year of implementation. | US | Peer-reviewed study | Dong Y., Dresner M., Yao Y. (2014). Beyond Information Sharing: An Empirical Analysis of Vendor-Managed Inventory. Production and Operations Management 23(5):817-828 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Materials Management and Inventory Control | classroom | 2 days | Bengaluru | plant head, shop manager |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| Improvement memos raised from visual control tables | 61 improvement memos, 39% fully implemented (24 months; bundle with SMED, 5S, TPM; OEE 87.9% to 92.3%) | Leading confectionery producer, >25,000 t/year, 24-month lean programme | RS | Peer-reviewed study | Djekic, I., Zivanovic, D., Dragojlovic, S., Dragovic, R. (2014). Lean Manufacturing Effects in a Serbian Confectionery Company - Case Study. Organizacija 47(3):143-152 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | 5S | online | self-paced | Rs.250 | online | shop manager, supervisor, operator | |
| Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC) | MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levels | handholding/consulting | Basic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultant | Basic free | Govt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines) | pan-India (online LMS + in-plant) | owner/MD, plant head, shop manager, supervisor |
| Quality Circle Forum of India (QCFI) | 5S training, implementation & certification (in-plant) | in-plant | engagement-based | at client plant | shop manager, supervisor, operator | ||
| IMTMA Training (Indian Machine Tool Manufacturers' Association) | Lean Daily Work Management (DWM) System | classroom | 1 day | Rs. 2999/- +18% GST | Group concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages) | Bengaluru | plant head, shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| OEE of production line | OEE 32% -> 56% (+24 points); workers productive 50.2% of time at baseline (2,200 observations) | beverage manufacturer, fruit juice production line, 24 workers over 2 shifts; actions: work-sequence rearrangement, removing unnecessary activities, standard procedures | Case study | Lee K.S. (2014). Work sampling. APO Productivity Methodologies, Tools, and Techniques (Asian Productivity Organization web column) | |
| crew size for two shifts | crew reduced from 24 to 15 workers for two shifts | beverage manufacturer, fruit juice production line | Case study | Lee K.S. (2014). Work sampling. APO Productivity Methodologies, Tools, and Techniques (Asian Productivity Organization web column) |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Industrial Engineering Tools for Productivity Improvement | online | self-paced | Rs.2000 | online | shop manager, supervisor | |
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor |
| Metric | Result | Context | Country | Source type | Citation |
|---|---|---|---|---|---|
| productivity | +16% productivity and -22.7% upper-limb overload risk (OCRA) in about two years | manufacturing company, production line; ergonomics training + workstation layout and work organisation changes | IT | Peer-reviewed study | Battevi, N., Vitelli, N. (2013). Ergonomics and productivity: an example applied to a manufacturing industry. La Medicina del Lavoro 104(3):203-212 |
| output quantity; good-quality output | Holes drilled +22%, good holes +50% vs conventional workstation | repetitive drill-press operation, experimental workstation redesign (jig/fixture, chair, work height, reach, training) | Peer-reviewed study | Das, B., Shikdar, A.A., Winters, T. (2007). Workstation redesign for a repetitive drill press operation: A combined work design and ergonomics approach. Human Factors and Ergonomics in Manufacturing 17(4):395-410 | |
| products per person per day | Products per person per day +44%, order lead time -46%, workspace -44% (participatory approach) | participatory ergonomics in assembly, reported in review citing van Rhijn et al. (2005) | Peer-reviewed study | Vink, P., Koningsveld, E.A.P., Molenbroek, J.F. (2006). Positive outcomes of participatory ergonomics in terms of greater comfort and higher productivity. Applied Ergonomics 37(4):537-546 |
| Provider | Programme | Format | Duration | Fee | Subsidy | Cities | For |
|---|---|---|---|---|---|---|---|
| National Productivity Council (NPC) - e-LEAP | Safety Management Course | online | self-paced | Rs.1800 | online | plant head, shop manager, supervisor | |
| National Productivity Council (NPC) - e-LEAP | Hazard Identification and Risk Analysis | online | self-paced | Rs.250 | online | shop manager, supervisor | |
| Indian Institution of Industrial Engineering (IIIE), Navi Mumbai | Graduateship in Industrial Engineering (IE Grad) - membership-based distance examination | certification | multi-year, exam sessions (Aug 2026 session running) | distance / exam centres | shop manager, supervisor |
Tell Mama about your plant and Mama will come back with how many cameras you need, where they go, and the retention your state expects — sized to your floor, in ₹. Built for Indian factories.