Start from what you see on your floor and get the method that fixes it: 62 methods from SMED and TPM to kanban, what to measure before and after, 131 results from real plants (36 in India) and 78 training programmes in India. Data as of

Loading the methods

About this data

The Navigator holds 62 improvement methods and tools, from SMED and TPM to kanban, SPC and daily management, each tied to the problems an owner sees on the floor (25 of them). For every method it shows what to measure before you start and after, and how to get that number with your own staff: a stopwatch, a downtime log, a check sheet or a video of the job

The 131 results are before/after numbers taken from published sources, 36 of them from Indian plants. Each number carries the type of its source: a peer-reviewed study, a review of studies, a case study, or a figure reported by a vendor or consultant. Most published results come from a single plant, and each such number is marked "single-plant case". Treat them as what a method has achieved somewhere, not as a promise for your plant. Timelines and costs appear only where a source prints them

The Training tab lists 78 programmes that are open or running now, from the National Productivity Council, MSME centres, industry bodies and institutes, filtered by role from owner/MD to operator. Fees and dates are as each provider publishes them; check with the provider before you enrol

Methods covered: 5-Why root cause analysis, 5S, 8D problem solving, A3 problem solving, ABC/XYZ inventory classification, Assembly line balancing, Automated visual inspection, Autonomous maintenance, Cellular manufacturing, CMMS / digital maintenance log, Compressed-air leak detection and repair, CONWIP, Cost of Poor Quality, Daily management, Demand-Driven MRP, Design of Experiments, Employee suggestion system, Energy management system and energy audits, Finite-capacity scheduling, Gemba walk, Heijunka, Hoshin kanri, In-plant milk-run with supermarket, IoT machine monitoring, Ishikawa, ISO 9001 quality management system, Jidoka and andon, Just-in-Time, Kaizen, Kanban, Line-side kitting, Measurement System Analysis, OEE measurement, Overall Labour Effectiveness, Pareto analysis, Plant layout redesign, Poka-yoke, Predictive maintenance, Preventive, Process FMEA, Quality circles, Quick Response Manufacturing, Reliability-centred maintenance, Sales and Operations Planning, Six Sigma, Skill matrix and cross-training, SMED, Spaghetti diagram, Standardised work, Statistical Process Control, Supplier development, Takt time planning, Theory of Constraints, Time and motion study, TPM, TWI Job Instruction, Value analysis / value engineering, Value Stream Mapping, Vendor-managed inventory, Visual management, Work sampling, Workstation ergonomics

Read next: OEE explained, with a rupee example, the real cost of factory downtime, SKU changeover on packing lines (SMED)

Every method as text

The same 62 methods as the Navigator above, each with what to measure before and after, 131 published results with their source type, and the training programmes in India. Open a method to read it.

5-Why root cause analysis

Six Sigma/quality
Also known as
5 Whys; Why-Why analysis; 3x5 Why
Family
Six Sigma/quality
What it fixes
Ask 'why?' again and again (about five times) until you reach the real cause of a problem, not the symptom
Symptoms on the floor
The same problem comes back every month; Too much rejection and rework; Machines break down again and again; Customers complain or send material back
Measure before and after
Recurrence count of the same problem per month; rejection % for the defect studied; downtime minutes for the stoppage studied
How to get the baseline
Rejection/breakdown register for the last 1-3 months: count how often the same problem was logged and its rejection % or downtime minutes
Who leads it
supervisor
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal
Works well with
Ishikawa (fishbone) cause-and-effect diagram, Pareto analysis (80/20), 8D problem solving, A3 problem solving, Quality circles, Kaizen (continuous improvement)
Common pitfall
Teams stop at 'operator error' or follow one chain only, so the systemic cause (procedure, management decision) is never fixed
Last verified
17 Oct 2026
Published results for 5-Why root cause analysis
MetricResultContextCountrySource typeCitation
average mold changeover timemold changeover time decreased from 8.77 minutes to 3.51 minutes (-60.22%); OEE 55.85% -> 65.65%automotive parts stamping, 800-ton press; Why-Why analysis combined with SMED, visual controlTHPeer-reviewed studyMeemak J., Choomlucksana J. (2024). Reducing Downtime Loss in the Automotive Parts Stamping Process Using Why-Why Analysis: A Case Study. Engineering and Technology Horizons 41(3)
overall equipment effectivenessOEE from 55.85% to 65.65% (+9.8 percentage points)automotive parts stamping, 800-ton press; Why-Why with SMED and visual controlTHPeer-reviewed studyMeemak J., Choomlucksana J. (2024). Reducing Downtime Loss in the Automotive Parts Stamping Process Using Why-Why Analysis: A Case Study. Engineering and Technology Horizons 41(3)
rejection level, cylinder block castings (sand drop)rejection level from 37.17% to 16.3%foundry, cylinder block casting; why-why analysis with check sheet and cause-effect diagramCase studyNerle V., Shinde S. (2013). Analysis of the Sand Drop Defect to Reduce the Rejection Level of Cylinder Block Casting: A Case Study. International Journal of Engineering Research & Technology 2(9)
Training in India for 5-Why root cause analysis
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPProblem Analysis and Decision Makingonlineself-pacedRs.250onlineshop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)8D Problem Solving Methodology and 7QC Toolsclassroom2 daysGurugramsupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Machine Breakdown Analysisclassroom2 daysPunesupervisor, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Problem-Solving Tools for Securing our Present & Futureclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Chhatrapati Sambhajinagarshop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Effective Maintenance Towards Zero Down Time (ZDT) - Electrical Aspects of CNC Machinesclassroom3 daysRs. 6999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengalurumaintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Certified Specialist in Root Cause Analysisclassroom2 daysPunesupervisor, quality head, maintenance head
IIM Mumbai (formerly NITIE) - Open MDPManufacturing & Operational Excellenceonline3 days / 18 hoursBulk discount for 5+ participants from same organisationonlineplant head, shop manager, quality head, maintenance head

5S (workplace organisation)

Lean/TPS
Also known as
Sort, Set in order, Shine, Standardise, Sustain; Swachh workplace
Family
Lean/TPS
What it fixes
Put every tool, die and gauge in a fixed, labelled place so nobody hunts for anything and problems are visible
Symptoms on the floor
People waste time looking for tools, dies, gauges; The floor is cluttered, no space to grow; Workers wait for material, cranes or instructions
Measure before and after
Minutes spent searching for tools/dies/gauges per shift; weekly 5S audit score; floor space freed (sq ft)
How to get the baseline
Shadow 3-5 operators for a shift and log search time; score each area with a 5S audit checklist in week 1
Typical duration
20 to 24 weeks
Who leads it
supervisor
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Kaizen (continuous improvement), TPM (Total Productive Maintenance), Visual management
Common pitfall
Turns into a one-time cleaning drive unless audits continue weekly
Government support in India
ZED parameter Swachh Workplace; 5S is in MSME Lean scheme curriculum
Last verified
17 Oct 2026
Published results for 5S (workplace organisation)
MetricResultContextCountrySource typeCitation
tool search time; 5S audit score30 -> 5 min; audit score 7 -> 55 (week 1 -> week 20)small-scale scientific instruments manufacturerINPeer-reviewed studyGupta S., Jain S.K. (2015). An application of 5S concept to organize the workplace at a scientific instruments manufacturing company. Int. J. Lean Six Sigma 6(1):73
5S audit score6 -> 72 (week 1 -> week 24)scientific equipment companyINPeer-reviewed studyGupta S., Chandna P. (2020). Grey Systems: Theory and Application
Training in India for 5S (workplace organisation)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAP5Sonlineself-pacedRs.250onlineshop manager, supervisor, operator
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
National Productivity Council (NPC)Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0classroom5 daysPuriplant head, shop manager, maintenance head
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI)ZED Certification (Bronze/Silver/Gold) + Gap Analysis & HandholdingcertificationBronze online self-certification; Silver/Gold with site assessmentRegistration freeSubsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEspan-Indiaowner/MD, plant head, quality head
CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), MumbaiIn-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safetyin-planttailoredMumbai (delivered pan-India)plant head, shop manager, supervisor
Quality Circle Forum of India (QCFI)40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yokeclassroom4 daysBhubaneswarshop manager, supervisor, operator
Quality Circle Forum of India (QCFI) - chaptersChapter Conventions on Quality Concepts (CCQC 2026) - Tirupati, Nagpur, Pune (virtual)classroom1-2 daysTirupati; Nagpur; Pune (virtual)supervisor, operator
Quality Circle Forum of India (QCFI)5S training, implementation & certification (in-plant)in-plantengagement-basedat client plantshop manager, supervisor, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)World Class Manufacturing - What, Why and How; Tools and Techniquesclassroom2 daysBengaluruowner/MD, plant head
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager

8D problem solving

Six Sigma/quality
Also known as
Eight Disciplines; 8D report; G8D
Family
Six Sigma/quality
What it fixes
A team-based 8-step routine for a serious or customer problem: contain it, find the root cause, fix it permanently, prevent repeat
Symptoms on the floor
Customers complain or send material back; Too much rejection and rework; The same problem comes back every month
Measure before and after
Rejection % / ppm for the problem part; number of repeat customer complaints on the same issue
How to get the baseline
Rejection % from the inspection register for the last 3-6 months for the problem part; customer complaint log
Who leads it
quality head
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Assembly lines
Do first
Pareto analysis (80/20), Ishikawa (fishbone) cause-and-effect diagram, 5-Why root cause analysis
Works well with
Six Sigma (DMAIC), A3 problem solving, Poka-yoke (mistake-proofing), Process FMEA (PFMEA), ISO 9001 quality management system
Common pitfall
The 8D report is filled in for the customer after the fact, with containment called 'root cause' and no check that the fix holds
Last verified
17 Oct 2026
Published results for 8D problem solving
MetricResultContextCountrySource typeCitation
valve spring rejectionrejection from 17.07% (6-month average) to 4.91% (July 2014); target 5%springs and stampings manufacturer; 8D with Pareto, cause-and-effect, 5-WhyPeer-reviewed studyKumar T.S., Adaveesh B. (2017). Application of 8D Methodology for the Root Cause Analysis and Reduction of Valve Spring Rejection in a Valve Spring Manufacturing Company: A Case Study. Indian Journal of Science and Technology 10(11):1-11
reject rate, mixer shower assembly line (leak rejects)reject rate from 11.84% to 0.11%mixer shower sub-assembly with O-seals; 8D combined with Six Sigma toolsPeer-reviewed studySharma M., Sharma S., Sahni S. (2020). Structured problem solving: combined approach using 8D and Six Sigma case study. Engineering Management in Production and Services 12(1):57-69
Training in India for 8D problem solving
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
IMTMA Training (Indian Machine Tool Manufacturers' Association)8D Problem Solving Methodology and 7QC Toolsclassroom2 daysGurugramsupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Certified Specialist in Root Cause Analysisclassroom2 daysPunesupervisor, quality head, maintenance head

A3 problem solving

Lean/TPS
Also known as
A3 report; A3 thinking; Toyota A3; PDCA on one sheet
Family
Lean/TPS
What it fixes
One page per problem: facts, root cause, actions, owner, follow-up check - so problems get closed, not just discussed
Symptoms on the floor
The same problem comes back every month; Too much rejection and rework; Customers complain or send material back; Improvement drives start well and fade out; Machines break down again and again
Measure before and after
The KPI of the chosen problem (rejection %, ppm, scrap pieces/month, breakdowns/month, setup minutes); plus share of A3s closed with target met and on time
How to get the baseline
Pull 4-8 weeks of the problem metric from the rejection/breakdown register or a check sheet at the machine; write it as the 'current condition' graph on the A3 before any action
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
Gemba walk
Works well with
5-Why root cause analysis, Ishikawa (fishbone) cause-and-effect diagram, Pareto analysis (80/20), 8D problem solving, Kaizen (continuous improvement), Daily management (tiered daily meetings), Hoshin kanri (policy deployment)
Common pitfall
Filled-in forms without a verified root cause: in one study 1 of 6 A3s missed the root cause and the problem stayed unsolved even though all actions were done
Last verified
17 Oct 2026
Published results for A3 problem solving
MetricResultContextCountrySource typeCitation
machine setup (preparation) timereduction of 70.4% of setup time; third shift avoidedmotorcycle production company, action research single caseBRPeer-reviewed studySantos Filho G.M., Simão L.E. (2022). A3 methodology: going beyond process improvement. Revista de Gestão 30(2):147-161
share of A3 reports fully successful (target met, actions on time)6 A3 reports in 3 plants over 1.5 years: 50% successful, 33% moderate, 17% low-performingthree production companies (incl. shock absorber assembly)PLPeer-reviewed studyGrobelna A., Wasilewska B. (2023). Evaluation of A3 tool in the production process. Scientific Papers of Silesian University of Technology, Organization and Management Series 176
Training in India for A3 problem solving
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNew 7 QC Toolsonlineself-pacedRs.250onlineshop manager, quality head
National Productivity Council (NPC) - e-LEAPProblem Analysis and Decision Makingonlineself-pacedRs.250onlineshop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Problem-Solving Tools for Securing our Present & Futureclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Chhatrapati Sambhajinagarshop manager, supervisor

ABC/XYZ inventory classification

Planning
Also known as
ABC analysis; XYZ analysis; ABC-XYZ matrix; Pareto inventory classification; FSN
Family
Planning
What it fixes
Sort every stocked item by value (ABC) and by how steady its usage is (XYZ), then set stock rules per class instead of one rule for all
Symptoms on the floor
Raw material runs out - or too much is lying around; Workers wait for material, cranes or instructions; The floor is cluttered, no space to grow
Measure before and after
Inventory value and days of stock; number of stock-outs per month (by class); obsolete/dead stock value; item count held
How to get the baseline
Export 12 months of issues per item from the stores register/ERP; compute annual consumption value and month-to-month variation; count stock-out events logged by stores or production in the last 3 months
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Kanban (pull system), Demand-Driven MRP (DDMRP), Vendor-managed inventory (VMI), Sales and Operations Planning (S&OP), In-plant milk-run with supermarket, Pareto analysis (80/20)
Common pitfall
Classification alone changes nothing: without new reorder rules per class and a periodic re-run, stock levels drift back
Last verified
17 Oct 2026
Published results for ABC/XYZ inventory classification
MetricResultContextCountrySource typeCitation
Average monthly stock-out frequencydecreased by 88.5% (P < 0.001), 6-month pilotpublic tertiary cancer hospital pharmacy, 286 medications, ABC-XYZ (non-manufacturing)INPeer-reviewed studySingh S., Sharma H., Aggarwal V. (2026). Optimizing drug availability and reducing wastage through ABC-XYZ inventory management: Insights from a public tertiary cancer hospital in Northern India. Indian Journal of Pharmacology 58(4):387-390
Monthly wastage costreduced by 76.5% (not statistically significant)public tertiary cancer hospital pharmacy, ABC-XYZ (non-manufacturing)INPeer-reviewed studySingh S., Sharma H., Aggarwal V. (2026). Optimizing drug availability and reducing wastage through ABC-XYZ inventory management: Insights from a public tertiary cancer hospital in Northern India. Indian Journal of Pharmacology 58(4):387-390
Inventory cost / number of parts heldparts held -42%, inventory cost -44%foundry warehouse, ABC analysisTHCase studyPrasert T., Panprasitvech B., Hongsuwan P., Sangkharat P., Dara H. (2023). Using ABC Analysis for Warehouse Management: A Case Study of Seree Karnchang Buddhanimit Foundry. Journal of Manufacturing & Management Technology 2(1)
Training in India for ABC/XYZ inventory classification
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPMaterials Requirement Planningonlineself-pacedRs.250onlineplant head, shop manager
IMTMA Training (Indian Machine Tool Manufacturers' Association)Materials Management and Inventory Controlclassroom2 daysBengaluruplant head, shop manager
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor
IIM Mumbai - Open MDPWarehouse Design & Automationclassroom3 daysMumbaiplant head

Assembly line balancing

Lean/TPS
Also known as
line balancing; workload balancing; operator balance chart; yamazumi; ranked positional weight
Family
Lean/TPS
What it fixes
Split work between stations so each takes about the same time, so no station waits and no single one holds up the line
Symptoms on the floor
One machine or section always holds everyone up; Half-finished parts pile up between machines; Too many people for the output we get; Overtime keeps rising, output does not; Workers wait for material, cranes or instructions
Measure before and after
Line efficiency %, balance delay %, output per shift, output per operator, number of stations/operators, idle time per station
How to get the baseline
Stopwatch each task at every station (10+ cycles), stack times per station in a bar chart (yamazumi) against required takt; count output per shift from the production register
Who leads it
shop manager
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Forging, casting and sheet metal, Electrical and electronics, Assembly lines, Textiles and garments
Do first
Time and motion study, Takt time planning
Works well with
Takt time planning, Standardised work, Theory of Constraints (drum-buffer-rope), Cellular manufacturing (one-piece flow cells), Skill matrix and cross-training, Work sampling
Common pitfall
Simple heuristics (e.g. ranked positional weight) ignore machine-type constraints, so on mixed-machine lines the 'balanced' plan often cannot be run as drawn
Last verified
17 Oct 2026
Published results for Assembly line balancing
MetricResultContextCountrySource typeCitation
Line efficiencyefficiency of the line has increased approx 10% and hence balance delay got reducedIndian SME with foundry shop; takt computation, line balancing, VSM, layout, kanban, andonINCase studyDas A.K., Das M.C. (2023). Productivity improvement using different lean approaches in small and medium enterprises (SMEs). Management Science Letters 13(1):51-64
Fuel tank assembly line outputproductivity enhanced from 140 to 158 units per shift within 14 monthsIndian automobile manufacturer, fuel tank assembly line; TPM programme with line-stoppage reduction, line balancing and operations standardisation combinedINPeer-reviewed studyGupta P., Mittal S., Hooda S., Gupta A. (2022). Assembly line productivity improvement through TPM by controlling line organisation efficiency and out of balance index: an empirical exploration. International Journal of Indian Culture and Business Management 26(1):1
Training in India for Assembly line balancing
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNRLL Series M4 - Productivity Improvement through Line Balancingonlineself-pacedRs.1500onlineshop manager, supervisor
National Productivity Council (NPC) - e-LEAPIndustrial Engineering Tools for Productivity Improvementonlineself-pacedRs.2000onlineshop manager, supervisor
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor

Automated visual inspection (machine vision / AI camera)

Digital
Also known as
AVI; machine vision inspection; AI visual inspection; deep-learning defect detection
Family
Digital
What it fixes
Cameras plus software check every part for visible defects at line speed instead of a tired inspector checking samples
Symptoms on the floor
Too much rejection and rework; Customers complain or send material back; Quality depends on one experienced operator; Too many people for the output we get
Measure before and after
Defect escape rate to customer (ppm), false rejects of good parts %, inspection seconds per part, inspectors per shift
How to get the baseline
Seeded test: mix known good and known bad parts, have current inspectors check them blind, count misses and false rejects; time inspection per part with a stopwatch
Who leads it
quality head
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Electrical and electronics, Packaging and printing
Do first
Cost of Poor Quality (COPQ) measurement, Measurement System Analysis (Gauge R&R)
Works well with
Poka-yoke (mistake-proofing), Jidoka and andon (stop-the-line signalling), Statistical Process Control (SPC), IoT machine monitoring, Cost of Poor Quality (COPQ) measurement
Common pitfall
Buying a system before collecting enough images of real defects and fixing lighting/part positioning, so it either misses defects or rejects good parts and operators bypass it
Last verified
17 Oct 2026
Published results for Automated visual inspection (machine vision / AI camera)
MetricResultContextCountrySource typeCitation
human inspector hit ratemanual inspectors caught 85% of defective parts and wrongly rejected 35% of good parts; industry average hit rate 80%82 inspectors, 140 precision parts, 8 defect typesUSPeer-reviewed study (baseline, not a result)See J.E. (2015). Visual Inspection Reliability for Precision Manufactured Parts. Human Factors 57(8):1427-1442
classification accuracy, response timedeployed CNN defect finder: accuracy over 99%, about 0.14 s per part (requirement 95% within 0.2 s)weld nut inspection, automotive bolts and nuts maker FrontecKRPeer-reviewed studyLee K.J., Kwon J.W., Min S., Yoon J. (2020). Embedding Convolution Neural Network-Based Defect Finder for Deployed Vision Inspector in Manufacturing Company Frontec. AAAI Conference on Artificial Intelligence 34(08):13164-13171
inspection time per partmanual inspection up to seven minutes per part on two workstations -> vision system about 300 ms, monitored by a single operatorMAP sensor inspection, Bosch India; integrator Qualitas TechnologiesINVendor-reportedCamillo J. (2015). Machine Vision Improves Inspection of Automotive Sensors. Assembly Magazine, 4 May 2015
Training in India for Automated visual inspection (machine vision / AI camera)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPInspection for Quality Controlonlineself-pacedRs.250onlinesupervisor, quality head, operator
Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology CentreJr. Technician - Inspection & Quality Control (NSQF)classroom6 months / 600 hrs₹ 22,000/-No fee for SC/ST (NSQF courses)Bhubaneswarsupervisor, operator
National Institute for MSME (NI-MSME)Smart Factory Design & AI Integration: Building Future-Ready MSME Manufacturing Enterprises (SED/SM/5)classroom3 daysHyderabadowner/MD, plant head

Autonomous maintenance

TPM
Also known as
jishu hozen; JH; CILT (clean-inspect-lubricate-tighten); operator care; AM pillar
Family
TPM
What it fixes
Operators clean, inspect, lubricate and tighten their own machine every day with a simple checklist, catching faults before breakdowns
Symptoms on the floor
Machines break down again and again; Machines run slower than they should; I don't know how much my machines actually run; The floor is cluttered, no space to grow; Too much rejection and rework
Measure before and after
OEE and its parts (availability, performance, quality); unplanned stop hours per month; number of minor stops; abnormality tags raised/closed
How to get the baseline
Machine log or shift register of stops (start/end time, reason) for 2-4 weeks, plus count of output vs planned to compute OEE by hand
Who leads it
maintenance head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Food and FMCG, Pharma and medical devices, Process industries, Packaging and printing
Do first
5S (workplace organisation)
Works well with
TPM (Total Productive Maintenance), Preventive (planned) maintenance, OEE measurement (loss tracking), Visual management, Skill matrix and cross-training, CMMS / digital maintenance log
Common pitfall
Handing operators checklists without maintenance support to fix the tagged faults kills it within weeks
Last verified
17 Oct 2026
Published results for Autonomous maintenance
MetricResultContextCountrySource typeCitation
OEE of packaging lineOEE 39.37% -> 52.31% (+12.95 points); availability 66.21->69.33, performance 61.30->77.44, quality 97.00->97.44pharmaceutical packaging line, Jamshoro, Sindh; CILT (clean-inspect-lubricate-tighten)PKPeer-reviewed studyKhan S., Ahmed S., Ali M., Khan R. (2023). Impact of Cleaning Inspecting Lubrication & Tightening (CILT) on Overall Equipment Effectiveness for Sustainable Production. Journal of Sustainable Environment 2(1):29-37
OEE of one machine (Alfing)OEE April 37.65%, May 71.17%, June 77.38%, July 77.62% after JH steps 1-3manufacturing company, Maharashtra; single machine 'Alfing'; Jishu Hozen up to step 3 over 4 monthsINCase studyGaikwad H.V. (2018). Total Productive Maintenance in a Manufacturing Industry: A Case Study of JISHU HOZEN Implementation. Indian Journal of Science and Technology 11(37):1-13
total uptime6% improvement in total uptime; scheduled maintenance need lowered by 2.61 h/weekpharmaceutical packaging line; operator-training-led AMPKPeer-reviewed studyMemon A.M. (2022). Analysing the Impact of Autonomous Maintenance on the Packaging Line of a Pharmaceutical Industry. Quaid-e-Awam University Research Journal of Engineering, Science & Technology 20(2):64-70
Training in India for Autonomous maintenance
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPTotal Productive Maintenance (TPM): Basic Programmeonlineself-pacedRs.1200onlineshop manager, supervisor, maintenance head
Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology CentreSr. Technician - Machine Maintenance & Automation (NSQF)classroom6 months / 600 hrs₹ 33,810/-No fee for SC/ST (NSQF courses)Bhubaneswarmaintenance head, operator
CII TPM Club India (CII-IQ)CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membershipcertificationassessment-basedpan-Indiaowner/MD, plant head, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Understanding TPM and Roadmap for Implementation of TPMclassroom2 daysHosurplant head, maintenance head

Cellular manufacturing (one-piece flow cells)

Lean/TPS
Also known as
manufacturing cells; U-cell; one-piece flow; single piece flow; group technology cells; line-cell conversion
Family
Lean/TPS
What it fixes
Put the few machines that make one part family next to each other in a cell, so parts move one by one instead of in batches
Symptoms on the floor
An order takes weeks to go through the plant; Half-finished parts pile up between machines; Machines are busy but orders still ship late; Small batches and many variants kill output; The floor is cluttered, no space to grow
Measure before and after
Order throughput time (days/hours, release to dispatch); WIP pieces between operations; floor area used; operators per unit output
How to get the baseline
Tag 10-20 job cards with date-time at each operation for two weeks; count WIP pieces at each machine at a fixed time each shift; measure the floor area with a tape
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Electrical and electronics, Assembly lines, Textiles and garments, Pharma and medical devices
Do first
Value Stream Mapping, 5S (workplace organisation), Takt time planning, Assembly line balancing
Works well with
Plant layout redesign (Systematic Layout Planning), Spaghetti diagram (travel mapping), Standardised work, Skill matrix and cross-training, SMED (quick changeover), Quick Response Manufacturing (QRM) with POLCA, Heijunka (production levelling), Just-in-Time (JIT) production and purchasing
Common pitfall
Moving machines into a cell without cross-training operators and cutting setup times just relocates the batches
Last verified
17 Oct 2026
Published results for Cellular manufacturing (one-piece flow cells)
MetricResultContextCountrySource typeCitation
production lead time; WIP; operatorslead time two days -> one hour; WIP 500-1500 -> max 100 pieces; operators -14%; rework -80%shirt sewing section, garment company; batch line converted to single piece flow work cellsCase studyPaneru N. (2011). Implementation of Lean Manufacturing Tools in Garment Manufacturing Process Focusing Sewing Section of Men's Shirt. Bachelor's thesis, Theseus (Finnish UAS repository)

CMMS / digital maintenance log

Digital
Also known as
computerised maintenance management system; maintenance software; digital breakdown register; work-order system
Family
Digital
What it fixes
One digital record of every machine, breakdown, repair, spare part and planned job, so maintenance is planned and history is not lost
Symptoms on the floor
Machines break down again and again; I don't know how much my machines actually run; The same problem comes back every month; People waste time looking for tools, dies, gauges
Measure before and after
MTTR; MTBF; number of stoppages per critical asset; % planned vs emergency work orders; maintenance cost as % of asset value; spares stock-outs
How to get the baseline
Count paper breakdown entries per month and check how many have start/end time, cause and spares used; compute MTTR/MTBF for top 10 machines from the register
Who leads it
maintenance head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Preventive (planned) maintenance, Predictive maintenance (condition monitoring), Reliability-centred maintenance (RCM), TPM (Total Productive Maintenance), OEE measurement (loss tracking), IoT machine monitoring, ABC/XYZ inventory classification
Common pitfall
Software alone changes nothing: if technicians do not log jobs fully and on time, the data is wrong and the system becomes an expensive paper register
Last verified
17 Oct 2026
Published results for CMMS / digital maintenance log
MetricResultContextCountrySource typeCitation
plant production lossesproduction losses $22.54m (2013, no CMMS), $21.587m (2014), $19.365m (2015)cement plant; limestone crusher, cement mill, kiln; year-on-year after CMMS deploymentNGPeer-reviewed studyAdetunji O.R., Owolabi S.M., Adesusi O.M., Dairo O.U., Ipadeola S.O., Taiwo S.O. (2018). Effect of Computerized Maintenance Management System on a Cement Production Plant. International Journal of Integrated Engineering 10(4)
maintenance cost as % of replacement asset value%RAV 3.74% with CMMS vs 5.67% without (benchmark 2.5%)62 publicly listed process-industry companies; cross-sectional comparison, not before/afterPKPeer-reviewed studyAli M.H., Khalid R. (2021). Computerized Maintenance Management System: A case of Process Industries of Pakistan. Pakistan Journal of Engineering and Applied Sciences 28(1)
Training in India for CMMS / digital maintenance log
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPPreventive Maintenanceonlineself-pacedRs.250onlinesupervisor, maintenance head, operator

Compressed-air leak detection and repair

Energy/resources
Also known as
air leak survey; ultrasonic leak detection; leak tagging; compressed air audit
Family
Energy/resources
What it fixes
Find and tag hissing air leaks (often with an ultrasonic gun), fix them, and recheck every quarter so compressors run less
Symptoms on the floor
The power bill per unit keeps rising; Machines break down again and again
Measure before and after
Compressor kWh per day or per unit of output; leak rate as % of compressor output (load/unload test on a non-production day); number of open leak tags
How to get the baseline
On a holiday with all machines off, run compressors and time load vs unload with a stopwatch (or read the run-hour counter) — the loaded share is the leak share; walk the lines in quiet hours and tag each hiss
Cost
average repair cost of $30 per cfm of leakage (vs $156 savings per cfm)
Who leads it
maintenance head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Plastics and rubber, Textiles and garments, Food and FMCG, Process industries
Works well with
Energy management system and energy audits, Preventive (planned) maintenance, Autonomous maintenance, 5S (workplace organisation), TPM (Total Productive Maintenance)
Common pitfall
One leak drive without a quarterly re-survey and a tag-and-close routine: leaks return within months and the saving disappears
Last verified
17 Oct 2026
Published results for Compressed-air leak detection and repair
MetricResultContextCountrySource typeCitation
compressed-air system energy consumption after leak repairenergy consumption improved by 8% after repairing leaks (230 leak points, ultrasonic survey)manufacturing plant, 230 leak points over three measurement periodsPeer-reviewed studyKapan, S. (2026). Energy Saving Potential and Machine Learning-Based Prediction of Compressed Air Leakages in Sustainable Manufacturing. Sustainability 18(2):904
savings vs repair cost per cfm of leakageon average $156 savings per cfm repaired vs $30 repair cost per cfm; 740 leaks, >50% at hoses, threads, connectors, fittingsleak assessments at several US manufacturing plants plus 68 ITAC assessmentsUSPeer-reviewed studyBarad, D., Buechler, J., Rasmussen, B. P. (2025). Optimizing Compressed Air System Efficiency in Manufacturing: A Study on Air Leak Repairs and Economical Impact. ASME MSEC 2025 (conference)
annual energy saved by leak arresting1,20,356 kWh per year, INR 9 lakh; verified with energy meters and compressor run counterscement plant, instrument air network, Wadi, KarnatakaINVendor-reportedAtlas Copco India (n.d.). AIRScan helps leading cement manufacturer cut CO2 emissions. Customer story
Training in India for Compressed-air leak detection and repair
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPEnergy Efficiency Techniques-22onlineself-pacedRs.1770onlineplant head, maintenance head
National Productivity Council (NPC) - Dr. Ambedkar Institute of ProductivityEnergy Efficiency Hands-on Training on Electrical & Thermal Utilitiesclassroom5 daysChennai (AIP-NPC)plant head, maintenance head
National Productivity Council (NPC) - Dr. Ambedkar Institute of ProductivityEnergy Efficiency Practitioners Course for Industrial Applicationsclassroom5 daysChennai (AIP-NPC)plant head, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Maintenance and Troubleshooting of Hydraulics and Pneumatics Systemsclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Ghaziabadmaintenance head, operator

CONWIP (constant work-in-process)

Planning
Also known as
ConWIP; constant WIP; WIP cap; card-based pull; CONWIP loop; Kanban-CONWIP hybrid
Family
Planning
What it fixes
Put a fixed number of cards on the whole line: a new job starts only when a finished one leaves, so WIP stays capped and orders flow faster
Symptoms on the floor
Half-finished parts pile up between machines; An order takes weeks to go through the plant; Machines are busy but orders still ship late; Dispatch dates keep slipping; Small batches and many variants kill output
Measure before and after
WIP count (jobs or pieces) on the floor; order flow time from release to dispatch; throughput per week; on-time delivery %
How to get the baseline
Count jobs/pallets between machines at a fixed time daily for two weeks; log release and completion dates of each job in a register to get flow time; throughput from dispatch register
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Machining and engineering, Electrical and electronics
Do first
Value Stream Mapping, Theory of Constraints (drum-buffer-rope)
Works well with
Kanban (pull system), Quick Response Manufacturing (QRM) with POLCA, Theory of Constraints (drum-buffer-rope), Demand-Driven MRP (DDMRP), Finite-capacity scheduling (APS), Heijunka (production levelling)
Common pitfall
Setting the WIP cap too low starves the bottleneck and cuts output; the cap must be tuned against the bottleneck, not guessed
Last verified
17 Oct 2026
Published results for CONWIP (constant work-in-process)
MetricResultContextCountrySource typeCitation
WIP inventoryWIP down ~20,000 units (27.79%); kanban cards 48 to 38; inner-ring replenishment 6.94 to 6.53 daysbearing manufacturer (UN 3213B bottom roller bearing), Kanban with CONWIPINPeer-reviewed studyUkey K, Gajghate SS, Kumar S, Kumar Behera A, Majumder H (2025). Execution of Pull System and Constant Work-in-Process Using Kanban System - A Case Study. Engineering Proceedings (AdvaMAP 2025), art. 2
inventory turnover38% increase in inventory turnover, cycle time reduced (hybrid Kanban-CONWIP pilot)make-to-order job shop, manufacturer of electromechanical components for valve monitoring and controlsPeer-reviewed studyLeonardo DG, Sereno B, da Silva DSA, Sampaio M, Massote AA, Simoes JC (2017). Implementation of hybrid Kanban-CONWIP system: a case study. Journal of Manufacturing Technology Management 28(6):714-736

Cost of Poor Quality (COPQ) measurement

Six Sigma/quality
Also known as
cost of quality; CoQ; quality cost; PAF model (prevention-appraisal-failure)
Family
Six Sigma/quality
What it fixes
Put a rupee figure on scrap, rework, returns and inspection each month so quality losses get the same attention as sales
Symptoms on the floor
Too much rejection and rework; Customers complain or send material back; The same problem comes back every month
Measure before and after
COPQ as % of sales (internal failure: scrap+rework; external failure: returns, warranty, penalties; appraisal; prevention); rupees per month per defect type
How to get the baseline
For one month, pull scrap/rework registers, rejection notes, customer debit notes and inspection man-hours; price each at material + labour + machine hour; divide by monthly sales
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Pareto analysis (80/20), Six Sigma (DMAIC), 8D problem solving, ISO 9001 quality management system, Statistical Process Control (SPC), Poka-yoke (mistake-proofing), Automated visual inspection (machine vision / AI camera)
Common pitfall
Counting only scrap in the register and missing rework hours, sorting, premium freight and customer penalties, so the figure looks small and nobody acts
Last verified
17 Oct 2026
Published results for Cost of Poor Quality (COPQ) measurement
MetricResultContextCountrySource typeCitation
cost of internal failurecost of internal failures reduced by about 40% after on-line gauge inspectionsmall-scale sheet metal unit, central IndiaINCase studyKane P.V., Deshpande V.S. (2007). Design of on-line inspection methodology for reduction of cost of internal failure - a case study in sheet metal industry. 9th International Symposium on Measurement and Quality Control (ISMQC), IIT Madras
total cost of quality as % of salesCoQ = 23% of sales revenue (prevention 4.8%, appraisal 10.2%, internal failure 7.4%, external failure 0.54%)small export apparel factory, Addis AbabaETPeer-reviewed study (baseline, not a result)Panghal M., Prasad S., Tilahun S. (2022). Quantification of Cost of Quality: A Case Study in an Ethiopian Apparel Manufacturing Factory. Journal of Textile and Apparel, Technology and Management 12(3)
quality cost as % of salesquality cost fell from 2.21% to 1.24% of sales (4.67 million baht on selected product within 5 months)electronics appliance manufacturer, PAF model + Pareto + cause-and-effectTHCase studyLi Xiujie (2001). Quality cost reduction: a case study in electronics appliance manufacturing company. M.Eng thesis, Chulalongkorn University
Training in India for Cost of Poor Quality (COPQ) measurement
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPCost of Qualityonlineself-pacedRs.250onlineowner/MD, plant head, quality head
Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI)ZED Certification (Bronze/Silver/Gold) + Gap Analysis & HandholdingcertificationBronze online self-certification; Silver/Gold with site assessmentRegistration freeSubsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEspan-Indiaowner/MD, plant head, quality head
CII Institute of QualityLean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior managementhandholding/consultingengagement-basedBengaluru (pan-India delivery)owner/MD, plant head, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)World Class Manufacturing - What, Why and How; Tools and Techniquesclassroom2 daysBengaluruowner/MD, plant head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing SPC, a Game Changer for Cost Reductionclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Punesupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing SPC, a Game Changer for Cost Reductionclassroom2 daysBengalurusupervisor, quality head
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager
ACMA (Automotive Component Manufacturers Association of India)E-learning: Material Flow Cost Accounting (MFCA) incl. MFCA in Kaizen and supply chainonlineself-paced modulesonlineplant head, quality head

Daily management (tiered daily meetings)

Lean/TPS
Also known as
tier meetings; daily huddles; daily works management; DWM; shopfloor management; SQDC meetings; short interval control
Family
Lean/TPS
What it fixes
Short fixed daily meetings at line, section and plant level review yesterday's numbers, raise problems and assign owners
Symptoms on the floor
The same problem comes back every month; Output swings shift to shift; Too much rejection and rework; Improvement drives start well and fade out; Dispatch dates keep slipping
Measure before and after
Quality defect index or rejection %; output vs plan; OEE; open actions and % closed on time; inventory days
How to get the baseline
Collect last 4-8 weeks of daily rejection, output and downtime from existing registers into one sheet; count how many problems have a named owner and due date today
Typical duration
17 to 22 weeks
Cost
Implementation costs (excluding consulting) averaging less than $3000 per firm; consulting would have cost about $250,000 (Bloom et al., 38-practice bundle, Indian textile firms)
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
any plant
Do first
Visual management
Works well with
Visual management, Gemba walk, Hoshin kanri (policy deployment), 5-Why root cause analysis, A3 problem solving, OEE measurement (loss tracking)
Common pitfall
Meetings become long status reports with no owner or deadline for each problem, so the same issues return every day
Last verified
17 Oct 2026
Published results for Daily management (tiered daily meetings)
MetricResultContextCountrySource typeCitation
Productivityproductivity +17% in the first year (randomized; bundle of 38 practices incl. daily production/quality meetings and daily-updated visual boards)Large Indian textile (weaving) firms, randomized treatment vs control plants, Mumbai areaINPeer-reviewed studyBloom, N., Eifert, B., Mahajan, A., McKenzie, D., Roberts, J. (2013). Does Management Matter? Evidence from India. Quarterly Journal of Economics 128(1):1-51
Quality defects index (QDI)32% fall in quality defects index - defects cut by about a third (faults caught in daily QDI and handled in next day's quality meeting)Indian textile plants, intent-to-treat estimateINWorking paperBloom, N., Eifert, B., Mahajan, A., McKenzie, D., Roberts, J. (2010). Does Management Matter? Evidence from India. NBER Working Paper 16658
Overall Equipment Efficiency Total (OEET)OEET 37% to 48%; equipment maintenance time 4,681 to 3,750 hours/year after DMLogistics sector of an oil & gas industrial unit ('Alfa Company')BRCase studyTelhada, A.L.C., Damasio, M.E.P., Pacheco, D.J., Molina Palma, M.A., Margem, F.M. (2026). Daily production management based on Lean Manufacturing: strategies for process optimization and control in the logistics sector. Cadernos Cajuina 11(3):e2141
Training in India for Daily management (tiered daily meetings)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPSupervisor and His Jobonlineself-pacedRs.250onlinesupervisor
National Productivity Council (NPC) - e-LEAPTQM Implementation for Business Excellenceonlineself-pacedRs.2000onlineowner/MD, plant head, quality head
Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI)ZED Certification (Bronze/Silver/Gold) + Gap Analysis & HandholdingcertificationBronze online self-certification; Silver/Gold with site assessmentRegistration freeSubsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEspan-Indiaowner/MD, plant head, quality head
Quality Council of India - National Board for Quality Promotion (NBQP), Training & Capacity Building DivisionQuality awareness workshops and tailored training / capacity buildingin-planttailoredpan-Indiaowner/MD, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)World Class Manufacturing - What, Why and How; Tools and Techniquesclassroom2 daysBengaluruowner/MD, plant head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Lean Daily Work Management (DWM) Systemclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager, supervisor

Demand-Driven MRP (DDMRP)

Planning
Also known as
demand driven material requirements planning; DDMRP buffers; demand-driven planning
Family
Planning
What it fixes
Keep sized stock buffers at a few chosen points and reorder from actual consumption, not forecasts, so material is there without piling up
Symptoms on the floor
Raw material runs out - or too much is lying around; Dispatch dates keep slipping; An order takes weeks to go through the plant; Machines are busy but orders still ship late
Measure before and after
Inventory value or days on hand; stock-outs / shortages per month; on-time delivery %; purchase/part lead time
How to get the baseline
From ERP or stock register: average inventory value per month and count of shortage events that stopped a line or delayed dispatch; on-time delivery from dispatch register vs promised dates
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
any plant
Do first
ABC/XYZ inventory classification, Value Stream Mapping
Works well with
Kanban (pull system), Sales and Operations Planning (S&OP), Just-in-Time (JIT) production and purchasing, Vendor-managed inventory (VMI), CONWIP (constant work-in-process), Finite-capacity scheduling (APS)
Common pitfall
Buffers are only as good as their sizing and ERP data; badly set buffers can raise stock rather than cut it, as one simulation found
Last verified
17 Oct 2026
Published results for Demand-Driven MRP (DDMRP)
MetricResultContextCountrySource typeCitation
inventory levelinventory reduced by 52.53% while material consumption rose 8.7%, service level maintainedreal company converting from MRP to DDMRP (before/after comparison)Peer-reviewed studyKortabarria A, Apaolaza U, Lizarralde A, Amorrortu I (2018). Material management without forecasting: From MRP to demand driven MRP. Journal of Industrial Engineering and Management 11(4):632

Design of Experiments (DOE / Taguchi)

Six Sigma/quality
Also known as
DoE; Taguchi method; orthogonal arrays; factorial experiments; robust design; parameter optimisation
Family
Six Sigma/quality
What it fixes
Change several process settings together in a planned set of trial runs to find the combination that gives fewest defects
Symptoms on the floor
Too much rejection and rework; The same problem comes back every month; Quality depends on one experienced operator; Machines run slower than they should; Output swings shift to shift
Measure before and after
rejection % for the target defect; yield; Cpk of the response; scrap cost per month
How to get the baseline
Pull last 3 months rejection % by defect type from the inspection/rejection register; note current settings (temperature, pressure, sand moisture, feed) per batch
Who leads it
quality head
Plant size (employees)
200-1000, 1000+
Industries
Machining and engineering, Forging, casting and sheet metal, Plastics and rubber, Process industries
Do first
Measurement System Analysis (Gauge R&R), Statistical Process Control (SPC)
Works well with
Six Sigma (DMAIC), Statistical Process Control (SPC), Measurement System Analysis (Gauge R&R), Pareto analysis (80/20), Ishikawa (fishbone) cause-and-effect diagram
Common pitfall
Optimal settings found in the trial are not locked into the standard work sheet, so operators drift back to old settings
Last verified
17 Oct 2026
Published results for Design of Experiments (DOE / Taguchi)
MetricResultContextCountrySource typeCitation
casting rejection raterejection rate reduced from 16.98% to 6.07%ductile iron castings, medium-scale foundry, Taguchi L-27INPeer-reviewed studyJohnson Santhosh A., Lakshmanan A.R. (2016). Investigation of ductile iron casting process parameters using Taguchi approach and response surface methodology. China Foundry 13(5):352-360
electrical failuresreduction in the electrical failures of around 50%semiconductor inkjet cartridge plant, 2^3 DOE within Six Sigma projectMXPeer-reviewed studyValles A., Sanchez J., Noriega S., Gomez Nunez B. (2009). Implementation of Six Sigma in a Manufacturing Process: A Case Study. International Journal of Industrial Engineering 16(3):171-181
Training in India for Design of Experiments (DOE / Taguchi)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
Indian Statistical Institute - SQC & OR Unit HyderabadIn-plant training programmes (top management / middle managers / shopfloor supervisors & operators)in-plant1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloorat client plantowner/MD, plant head, supervisor, quality head, operator
IIM Mumbai - Open MDPBusiness Accelerator Program for MSMEonline3 days / 18 hoursonlineowner/MD

Employee suggestion system

People/standard work
Also known as
suggestion scheme; idea management; kaizen teian; employee suggestion scheme (ESS)
Family
People/standard work
What it fixes
A simple, fast route for every worker to propose small fixes, with quick yes/no, quick action and visible reward
Symptoms on the floor
Improvement drives start well and fade out; The same problem comes back every month; Overtime keeps rising, output does not; Too many people for the output we get
Measure before and after
Ideas submitted per employee per year; % of ideas implemented; days from idea to decision; savings (Rs) from implemented ideas; % of workers who submitted at least one idea
How to get the baseline
Count ideas in the existing suggestion box/register for the last 12 months; note how many were answered and implemented and how long each took; headcount from payroll
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Kaizen (continuous improvement), Quality circles, Daily management (tiered daily meetings), Visual management, 5S (workplace organisation)
Common pitfall
Schemes die when ideas sit unanswered for weeks or rewards favour a few big ideas over many small ones the worker can implement himself
Last verified
17 Oct 2026
Published results for Employee suggestion system
MetricResultContextCountrySource typeCitation
savings from implemented employee suggestionsSavings of nearly Rs 400 million in FY2004-05; >57,000 suggestions, ~20,000 acceptedBHEL, heavy electrical engineering PSU, company-wideINConsultant-reportedBharat Heavy Electricals Ltd (2005). BHEL's participative culture pays rich dividends: employees' suggestions lead to savings of Rs.400 million. Company press release, 02/05/2005
estimated economic effect of suggestions per firm225.4 billion yen/year across 278 firms (avg 810 million yen per firm); 12.8 suggestions per employee per year1981 survey of 427 Japanese firms (Japan Human Relations Association / Japan Suggestion Activities Association), ~1.83 million employeesJPCase studyAkaoka, I. (1983). Motivation of Employees in Japan. Kyoto University Economic Review 53:25-
Training in India for Employee suggestion system
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPKaizenonlineself-pacedRs.250onlineshop manager, supervisor, operator
National Productivity Council (NPC) - e-LEAPQuality, Waste Minimization & Safety Circlesonlineself-pacedRs.250onlinesupervisor, operator

Energy management system and energy audits

Energy/resources
Also known as
ISO 50001; EnMS; energy audit; detailed energy audit (DEA); strategic energy management; SEM
Family
Energy/resources
What it fixes
Measure where power and fuel go per unit made, fix the big leaks of energy, and keep a monthly routine so savings stay
Symptoms on the floor
The power bill per unit keeps rising; I don't know how much my machines actually run
Measure before and after
Specific energy consumption (kWh or toe per tonne / per piece); monthly energy bill per unit of output; share of energy cost in conversion cost
How to get the baseline
12 months of electricity and fuel bills divided by monthly production from the dispatch register; sub-meter or clamp-meter readings on the biggest users (furnaces, compressors, motors) for a week
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Machining and engineering, Forging, casting and sheet metal, Textiles and garments, Food and FMCG, Process industries
Do first
OEE measurement (loss tracking)
Works well with
Compressed-air leak detection and repair, Pareto analysis (80/20), Kaizen (continuous improvement), Daily management (tiered daily meetings), IoT machine monitoring, TPM (Total Productive Maintenance)
Common pitfall
A one-off audit report that nobody owns produces a list of measures but savings fade unless energy per unit is reviewed every month like output
Government support in India
BEE SME programme and BEE/TERI SAMEEEKSHA run cluster energy audits (e.g. Rajkot foundry deep-dive 2015-17)
Last verified
17 Oct 2026
Published results for Energy management system and energy audits
MetricResultContextCountrySource typeCitation
annual energy performance improvement ratearound 4.1% in the initial year of implementation and around 3.4% twelve years after implementation83 manufacturing facilities with verified ISO 50001 energy performance dataPeer-reviewed studyFitzgerald, P., Therkelsen, P. L., Sheaffer, P., Rao, P. (2023). Deeper and persistent energy savings and carbon dioxide reductions achieved through ISO 50001 in the manufacturing sector. Sustainable Energy Technologies and Assessments 57:103280
annual energy savings after detailed energy audits and implementation support757 ECMs implemented, 1409 toe/year energy savings, CO2 reductions over 12,700 t; monetary benefit Rs 1130 lakh/year (table)Rajkot foundry cluster, 110 MSME foundries, TERI-SDC deep dive 2015-17INCase studyTERI / BEE (2018). SAMEEEKSHA Newsletter Vol 9 Issue 2 (June 2018): deep dive approach in Rajkot foundry cluster
share of identified energy conservation measures needing no investment / paying back within 1 year242 ECMs (23%) required no investment; 463 (44%) paid back within one yearRajkot foundry cluster, 110 MSME foundriesINCase studyTERI / BEE (2018). SAMEEEKSHA Newsletter Vol 9 Issue 2 (June 2018)
Training in India for Energy management system and energy audits
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPISO 50001:2018 Energy Management System (EnMS)onlineself-pacedRs.1770onlineplant head, maintenance head
National Productivity Council (NPC) - e-LEAPEnergy Efficiency Techniques-22onlineself-pacedRs.1770onlineplant head, maintenance head
National Productivity Council (NPC) - e-LEAPEnergy Management System Auditors Courseonlineself-pacedRs.1770onlineplant head, maintenance head
National Productivity Council (NPC) - e-LEAPEnergy Management Professional Short Courseonlineself-pacedRs.0onlineplant head, maintenance head
National Productivity Council (NPC) - Dr. Ambedkar Institute of ProductivityEnergy Efficiency Hands-on Training on Electrical & Thermal Utilitiesclassroom5 daysChennai (AIP-NPC)plant head, maintenance head
National Productivity Council (NPC) - Dr. Ambedkar Institute of ProductivityEnergy Efficiency Practitioners Course for Industrial Applicationsclassroom5 daysChennai (AIP-NPC)plant head, maintenance head
Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI)ZED Certification (Bronze/Silver/Gold) + Gap Analysis & HandholdingcertificationBronze online self-certification; Silver/Gold with site assessmentRegistration freeSubsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEspan-Indiaowner/MD, plant head, quality head
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager
IIM Calcutta - Executive EducationAdvanced Programme in Smart Manufacturing Leadership (APSML)online8 months (Saturday evening live sessions + 4-day campus visit)Rs. 2,74,000/- + (Applicable Taxes)online + Kolkata campusowner/MD, plant head

Finite-capacity scheduling (APS)

Digital
Also known as
APS; advanced planning and scheduling; finite loading; production scheduling software; machine-level scheduling
Family
Digital
What it fixes
Plan jobs machine by machine against real hours available, so promised dates reflect what the shop can actually do
Symptoms on the floor
Machines are busy but orders still ship late; Dispatch dates keep slipping; One machine or section always holds everyone up; An order takes weeks to go through the plant; Overtime keeps rising, output does not
Measure before and after
% orders dispatched on or before promised date; planner hours per week to make the plan; utilisation of key machines; schedule changes per week
How to get the baseline
From dispatch register take last 3 months of orders, mark promised vs actual dispatch date, compute % on time; ask planner to log hours spent making/re-making the plan for two weeks
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
Machining and engineering, Forging, casting and sheet metal
Do first
OEE measurement (loss tracking), Standardised work
Works well with
Theory of Constraints (drum-buffer-rope), Quick Response Manufacturing (QRM) with POLCA, Sales and Operations Planning (S&OP), CONWIP (constant work-in-process), IoT machine monitoring
Common pitfall
Schedules are only as good as routing times and machine availability data; with wrong cycle times the software gives confident but wrong dates and planners go back to Excel
Last verified
17 Oct 2026
Published results for Finite-capacity scheduling (APS)
MetricResultContextCountrySource typeCitation
Compliance with delivery deadlinesfrom 60 to 90 percent; planning time 4 days to 1moulds and plastic/metal parts maker, Siemens Opcenter APSBRVendor-reportedSiemens Digital Industries Software (n.d.). Artis Matriz case study (Opcenter APS). Vendor web page
On-time deliverieson-time deliveries improved by 15 percentmining and aggregate heavy equipment maker, Siemens Opcenter APSCAVendor-reportedSiemens Digital Industries Software (n.d.). Masaba Canada case study (Opcenter APS). Vendor web page
Training in India for Finite-capacity scheduling (APS)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPIntroduction to Works Planning and Controlonlineself-pacedRs.250onlineplant head, shop manager
National Institute for MSME (NI-MSME)Smart Production Management with AI Decision (SED/SM/4)classroom3 daysHyderabadowner/MD, plant head

Gemba walk

Lean/TPS
Also known as
gemba walks; leader shop-floor walk; go and see; genchi genbutsu; management by walking around
Family
Lean/TPS
What it fixes
Managers walk the shop floor on a fixed schedule, watch the real work, ask operators and fix what blocks them
Symptoms on the floor
Improvement drives start well and fade out; Workers wait for material, cranes or instructions; The same problem comes back every month; Output swings shift to shift; Machines break down again and again
Measure before and after
Share of planned walks actually done; issues raised per walk and % closed within 7 days; OEE or output per shift on the walked lines; MTTR
How to get the baseline
Keep a simple walk register (date, walker, area, issues found, owner, closed date) for 4 weeks before changing anything; note current OEE/output from the production register
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
Standardised work
Works well with
Daily management (tiered daily meetings), Visual management, 5S (workplace organisation), Kaizen (continuous improvement), A3 problem solving, Hoshin kanri (policy deployment)
Common pitfall
Walks turn into inspection tours or blame sessions, workers stop raising problems and the walk schedule quietly dies
Last verified
17 Oct 2026
Published results for Gemba walk
MetricResultContextCountrySource typeCitation
Overall factory performance (OEE-type efficiency)approximately 5% increase in overall factory performance; 5% package maker; 1.5% extruder, alongside higher adherence to the gemba walk scheduleAnimal feed factory, one-year study; weekly digital reminder to keep the walk scheduleBRCase studyAlmeida, A.G.M. (2025). Uso da ferramenta de Gemba Walks para aumentar a eficiencia geral de equipamentos: um estudo de caso. Bachelor thesis (TCC), Universidade Federal de Pernambuco
Training in India for Gemba walk
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Lean Daily Work Management (DWM) Systemclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager, supervisor

Heijunka (production levelling)

Lean/TPS
Also known as
production levelling; production smoothing; level loading; mixed-model scheduling; heijunka box
Family
Lean/TPS
What it fixes
Plan the same small mix of products every day or week instead of big batches of one item, so load, stock and staffing stay even
Symptoms on the floor
Small batches and many variants kill output; Output swings shift to shift; Raw material runs out - or too much is lying around; Half-finished parts pile up between machines; Dispatch dates keep slipping
Measure before and after
Finished-goods and inter-process inventory (days of stock), average lot size, number of setups per month, on-time delivery / service level, daily output variation
How to get the baseline
From the stores register and production log take 3 months of daily output per product, lot sizes, setups per month and month-end stock; plot daily output to see swings
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Assembly lines, Process industries
Do first
SMED (quick changeover), Standardised work, Kanban (pull system), ABC/XYZ inventory classification
Works well with
Takt time planning, Kanban (pull system), In-plant milk-run with supermarket, Sales and Operations Planning (S&OP), Finite-capacity scheduling (APS), Just-in-Time (JIT) production and purchasing
Common pitfall
Levelling without short changeovers multiplies setups and can cost more than plain make-to-order; one action-research study found MTO without heijunka was cheaper for its factory
Last verified
17 Oct 2026
Published results for Heijunka (production levelling)
MetricResultContextCountrySource typeCitation
Actual inventory (monthly average)actual inventory decreased in 23% in average monthly valuesStamping-like press stage, 2 machines, up to 130 product models, make-to-stock batch production; subsidiary of a multinational; 3 months before vs 3 months afterBRPeer-reviewed studyAraujo L.F., Queiroz A.A. (2010). Production Leveling (Heijunka) Implementation in a Batch Production System: A Case Study. In: APMS 2009, IFIP AICT 338, Springer: 105-112
Average lot sizeaverage lot size has also been decreased by 18% in monthly average value; monthly set ups increased 10%; service level unchangedSame case: press stage, make-to-stock, Brazil subsidiary of multinationalBRPeer-reviewed studyAraujo L.F., Queiroz A.A. (2010). Production Leveling (Heijunka) Implementation in a Batch Production System: A Case Study. In: APMS 2009, IFIP AICT 338, Springer: 105-112
Inter-process inventoryinter-process inventory was reduced to 20% in just five yearsManufacturer of interior subassembly items for commercial jets, low-mix/low-volume; over 5 yearsCase studyKoide K., Iwata T. (2007). Kaizen Through Heijunka Production (Leveled Production). SAE Technical Paper 2007-01-3886
Training in India for Heijunka (production levelling)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing Toyota Production System - Why, What and Howclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager

Hoshin kanri (policy deployment)

Lean/TPS
Also known as
policy deployment; strategy deployment; X-matrix; catchball; management by policy
Family
Lean/TPS
What it fixes
Pick 3-5 yearly breakthrough goals, cascade them into each department's targets and projects, and review progress monthly
Symptoms on the floor
Improvement drives start well and fade out; Dispatch dates keep slipping; Overtime keeps rising, output does not; Too many people for the output we get
Measure before and after
Labour productivity (output per man-hour); on-time delivery %; order lead time; % of improvement projects linked to an annual goal; specific energy use
How to get the baseline
List all running improvement projects and check which annual goal each serves; take last 12 months of output per man-hour, OTD and lead time from dispatch and attendance registers
Typical duration
22 to 104 weeks
Who leads it
owner/MD
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Electrical and electronics, Plastics and rubber, Process industries
Do first
Daily management (tiered daily meetings), A3 problem solving
Works well with
Daily management (tiered daily meetings), Gemba walk, A3 problem solving, Six Sigma (DMAIC), Kaizen (continuous improvement), Sales and Operations Planning (S&OP)
Common pitfall
Too many goals are cascaded top-down without catchball, so departments sign targets they never own and reviews stop after the first quarter
Last verified
17 Oct 2026
Published results for Hoshin kanri (policy deployment)
MetricResultContextCountrySource typeCitation
Labour productivitylabour productivity +6% over two yearsSemiconductor manufacturer in rapid growth; lean phase then BPR phasePeer-reviewed studyYang, T.-M., Su, C.-T. (2007). Application of hoshin kanri for productivity improvement in a semiconductor manufacturing company. Journal of Manufacturing Technology Management 18(6):761-775
Lead time; on-time deliveryon-time delivery +21%; lead time 8 to 4 weeks (with visual data management)UK SME, high-performance plastics manufacturer, action researchGBCase studyJalali-Roudsari, M., Murray, S.L. (2013). Enabling initiation of a lean management system in SMEs: a case study of a high performance plastics manufacturer. Cranfield University repository (CERES)
Specific natural gas consumption-23% natural gas consumption, -7% greenhouse gas emissions over a five-month initiative (Hoshin Kanri + Six Sigma)Global pulp and paper companyPeer-reviewed studyCarneiro, F., Shakirov, E.F., Hart, A.J., Andrade, J.O., Novoa, H., Carvalho, A.M. (2026). Operational excellence as a platform for ESG integration: A case study of integrated Hoshin Kanri and six sigma in the pulp and paper industry. Sustainable Futures 12:102088
Training in India for Hoshin kanri (policy deployment)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPTQM Implementation for Business Excellenceonlineself-pacedRs.2000onlineowner/MD, plant head, quality head
IIM Mumbai - Open MDPBusiness Accelerator Program for MSMEonline3 days / 18 hoursonlineowner/MD
IIM Calcutta - Executive EducationAdvanced Programme in Smart Manufacturing Leadership (APSML)online8 months (Saturday evening live sessions + 4-day campus visit)Rs. 2,74,000/- + (Applicable Taxes)online + Kolkata campusowner/MD, plant head

In-plant milk-run with supermarket

Lean/TPS
Also known as
milk run; mizusumashi; water spider; logistics train; tugger train; line-side supermarket; internal logistics route
Family
Lean/TPS
What it fixes
A small store (supermarket) near the line plus a fixed-route, fixed-time trolley that tops up each machine, so nobody waits for material
Symptoms on the floor
Workers wait for material, cranes or instructions; Raw material runs out - or too much is lying around; The floor is cluttered, no space to grow; Half-finished parts pile up between machines
Measure before and after
Minutes machines/operators wait for material per shift; milk-run lap time; number of forklift/crane trips; floor area taken by line-side stock; material shortages at line
How to get the baseline
For one week, supervisor logs every 'waiting for material' stop with start/end time on a check sheet; time several material-feeding trips with a stopwatch and sketch the route
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Electrical and electronics, Assembly lines
Do first
5S (workplace organisation), Standardised work, Kanban (pull system)
Works well with
Line-side kitting, Kanban (pull system), Just-in-Time (JIT) production and purchasing, Plant layout redesign (Systematic Layout Planning), Spaghetti diagram (travel mapping), Takt time planning, Heijunka (production levelling)
Common pitfall
A milk-run on an unstable schedule or without fixed container quantities just becomes a costlier forklift doing emergency runs
Last verified
17 Oct 2026
Published results for In-plant milk-run with supermarket
MetricResultContextCountrySource typeCitation
milk-run lap time15% reduction of milk-run lap time; fewer laps; one vehicle with four wagons serves all linesautomotive component manufacturer, inbound in-plant milk-run redesign with management softwarePeer-reviewed studyTellini T, Silva FJG, Pereira T, Morgado L, Campilho RDSG, Ferreira LP (2019). Improving In-Plant Logistics Flow by Physical and Digital Pathways. Procedia Manufacturing 38:965-974
milk-run cycle time9% average reduction of milk-run cycle time after standardising supply and operator trainingautomotive component manufacturer, milk-run feeding an assembly line, PDCA projectPTPeer-reviewed studyAmaral VP, Ferreira AC, Ramos B (2022). Internal Logistics Process Improvement using PDCA: A Case Study in the Automotive Sector. Business Systems Research 13(3):100-115
Training in India for In-plant milk-run with supermarket
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNRLL Series M6 - Lean Tools for Supply Chain Management: JIT and Kanbanonlineself-pacedRs.1500onlineshop manager, supervisor

IoT machine monitoring

Digital
Also known as
IIoT machine monitoring; real-time OEE; machine data collection; retrofit sensors; Industry 4.0 for SMEs; MDC
Family
Digital
What it fixes
Simple sensors on machines record run, stop and count automatically, so you see real uptime and stop reasons per machine on a screen
Symptoms on the floor
I don't know how much my machines actually run; Machines run slower than they should; Output swings shift to shift; Machines break down again and again; One machine or section always holds everyone up
Measure before and after
Machine utilisation % and OEE % per machine/shift (auto-logged); unplanned stop minutes and count by reason; pieces per hour
How to get the baseline
Before sensors: supervisor run/stop log per machine at fixed intervals (work sampling) or operator downtime register for 2 weeks; compare with the sensor log after install (expect manual logs to understate short stops)
Typical duration
30 to 30 weeks
Cost
Hardware for one retrofitted hand press: GBP 93 (plus GBP 10,400 R&D/staff); commercial monitoring for 48 machines: 5-year TCO GBP 13,400 to GBP 216,000
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
OEE measurement (loss tracking)
Works well with
OEE measurement (loss tracking), Predictive maintenance (condition monitoring), CMMS / digital maintenance log, Daily management (tiered daily meetings), Visual management, TPM (Total Productive Maintenance), Work sampling
Common pitfall
Data alone changes nothing: gains came only where someone reviewed stops daily and acted; also check that demand swings are not mistaken for improvement
Last verified
17 Oct 2026
Published results for IoT machine monitoring
MetricResultContextCountrySource typeCitation
Average efficiency of work centres (real-time OEE)average efficiency improved by 12.3% in 7 monthsMedium-sized eyewear manufacturer, 3 manual assembly work centres, IoT + cloud real-time OEEBRPeer-reviewed studyNovochadlo Y.M., Paladini E.P. (2024). Application of real-time overall equipment efficiency indicator in a medium-sized company. Brazilian Journal of Operations & Production Management 21(2):2042
OEE of machining cellfrom 36.9 percent OEE to 85 percent OEE; fourth machine not neededMagellan Aerospace, Kitchener, Ontario; Memex MERLIN monitoring (vendor customer story in trade press)CAVendor-reportedAlbert M. (2014). Machine Monitoring Proves Its Worth. Modern Machine Shop
Training in India for IoT machine monitoring
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC)Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0classroom5 daysPuriplant head, shop manager, maintenance head
National Institute for MSME (NI-MSME)Smart Production Management with AI Decision (SED/SM/4)classroom3 daysHyderabadowner/MD, plant head
National Institute for MSME (NI-MSME)Smart Factory Design & AI Integration: Building Future-Ready MSME Manufacturing Enterprises (SED/SM/5)classroom3 daysHyderabadowner/MD, plant head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Introduction to Digital Factoryclassroom2 daysBengaluruplant head, maintenance head
IIM Mumbai (formerly NITIE) - Open MDPManufacturing & Operational Excellenceonline3 days / 18 hoursBulk discount for 5+ participants from same organisationonlineplant head, shop manager, quality head, maintenance head
IIM Calcutta - Executive EducationAdvanced Programme in Smart Manufacturing Leadership (APSML)online8 months (Saturday evening live sessions + 4-day campus visit)Rs. 2,74,000/- + (Applicable Taxes)online + Kolkata campusowner/MD, plant head

Ishikawa (fishbone) cause-and-effect diagram

Six Sigma/quality
Also known as
fishbone diagram; cause-and-effect diagram; 6M diagram
Family
Six Sigma/quality
What it fixes
A team draws all possible causes of one problem on a 'fish skeleton' (man, machine, method, material...) and then checks the likeliest
Symptoms on the floor
Too much rejection and rework; The same problem comes back every month; Customers complain or send material back
Measure before and after
Rejection % for the specific defect; number of hypotheses checked vs confirmed
How to get the baseline
Rejection register by defect type for 1-4 months (check sheet) to pick the one defect to analyse
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Forging, casting and sheet metal, Textiles and garments, Pharma and medical devices
Do first
Pareto analysis (80/20)
Works well with
5-Why root cause analysis, Pareto analysis (80/20), 8D problem solving, Six Sigma (DMAIC), Quality circles
Common pitfall
The diagram becomes a brainstorm list nobody tests; without data to weight and verify causes, the team fixes the loudest guess
Last verified
17 Oct 2026
Published results for Ishikawa (fishbone) cause-and-effect diagram
MetricResultContextCountrySource typeCitation
defect percentagedefect percentage decreased from 6.51% to 5.84%; annual cost reduction 199,800 bahtnylon synthetic fibre plant (Thailand); fishbone diagram + brainstorming found root causes of yarn breaks and pack changes; fixes implemented (work instructions, inspection sheets, Godet roller check schedule, factorial-DOE pack-change interval). Fishbone combined with Pareto/ECRS/DOE, so effect is of the bundle.THPeer-reviewed studySriyanalugsana S., Punnaphasasiphas P. (2024). Defect Reduction in Nylon Fibers Manufacturing Process. Thai Industrial Engineering Network Journal 10(1):1-11
Training in India for Ishikawa (fishbone) cause-and-effect diagram
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPBasic 7QC Toolsonlineself-pacedRs.250onlinesupervisor, quality head, operator
National Productivity Council (NPC) - e-LEAPNew 7 QC Toolsonlineself-pacedRs.250onlineshop manager, quality head
National Productivity Council (NPC) - e-LEAPProblem Analysis and Decision Makingonlineself-pacedRs.250onlineshop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)8D Problem Solving Methodology and 7QC Toolsclassroom2 daysGurugramsupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Problem-Solving Tools for Securing our Present & Futureclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Chhatrapati Sambhajinagarshop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Certified Specialist in Root Cause Analysisclassroom2 daysPunesupervisor, quality head, maintenance head

ISO 9001 quality management system

Six Sigma/quality
Also known as
ISO 9000; QMS certification
Family
Six Sigma/quality
What it fixes
A written, audited system for how the plant controls quality: procedures, records, corrective actions, management review
Symptoms on the floor
Customers complain or send material back; The same problem comes back every month; Quality depends on one experienced operator; Too much rejection and rework; Improvement drives start well and fade out
Measure before and after
Rejection/wastage %, customer complaints per month, repeat non-conformances, on-time corrective-action closure; sales growth
How to get the baseline
From existing rejection registers and customer complaint files: 6-12 months of monthly rejection % and complaint count before starting the system
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Cost of Poor Quality (COPQ) measurement, 8D problem solving, Standardised work, Daily management (tiered daily meetings), Statistical Process Control (SPC), Measurement System Analysis (Gauge R&R), Process FMEA (PFMEA)
Common pitfall
Certifying for the customer's paperwork (a 'certificate on the wall') without using corrective action and management review, which gives cost without performance gains
Last verified
17 Oct 2026
Published results for ISO 9001 quality management system
MetricResultContextCountrySource typeCitation
sales vs matched non-adopterssales almost 9 percentage points higher at ISO 9001 adopters than matched comparison firms (effect appears from year 4)matched sample of single-plant California firms across industriesUSWorking paperLevine D.I., Toffel M.W. (2010). Quality Management and Job Quality: How the ISO 9001 Standard for Quality Management Systems Affects Employees and Employers. Management Science 56(6):978-996
firm death (disappearance) rate0.5% of adopters vs 7.1% of matched controls disappeared by 2003622 matched pairs of California firmsUSWorking paperLevine D.I., Toffel M.W. (2010). Quality Management and Job Quality: How the ISO 9001 Standard for Quality Management Systems Affects Employees and Employers. Management Science 56(6):978-996
wastage and rejectionaverage wastage & rejection fell from 9.34% to 6.39% after ISO 9000 (machine breakdown 1.60% to 0.51%)survey of Indian manufacturing organisations, before vs after ISO 9000:2000INCase studyMaddulety K. (2010). A research study on impact of ISO 9000:2000 on selected key performance indicators of manufacturing organizations in India. Summer Internship Society journal II(1)
Training in India for ISO 9001 quality management system
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPISO-9001:2015 and IATF 16949:2016 Quality Management Systemonlineself-pacedRs.2000onlinequality head
Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI)ZED Certification (Bronze/Silver/Gold) + Gap Analysis & HandholdingcertificationBronze online self-certification; Silver/Gold with site assessmentRegistration freeSubsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEspan-Indiaowner/MD, plant head, quality head
Indian Statistical Institute - SQC & OR Unit HyderabadIn-plant training programmes (top management / middle managers / shopfloor supervisors & operators)in-plant1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloorat client plantowner/MD, plant head, supervisor, quality head, operator
Quality Council of India - National Board for Quality Promotion (NBQP), Training & Capacity Building DivisionQuality awareness workshops and tailored training / capacity buildingin-planttailoredpan-Indiaowner/MD, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Internal Auditor Course - ISO 9001:2015classroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Gurugramquality head

Jidoka and andon (stop-the-line signalling)

Lean/TPS
Also known as
Autonomation; andon cord; andon light; line-stop; digital andon
Family
Lean/TPS
What it fixes
Machine or operator stops at the first abnormality and lights a signal; help comes fast and the cause is fixed before more bad parts are made
Symptoms on the floor
Workers wait for material, cranes or instructions; Too much rejection and rework; Machines break down again and again; I don't know how much my machines actually run; The same problem comes back every month
Measure before and after
Response time from signal to help arriving (minutes); unscheduled downtime hours; number of andon calls by reason; defects escaping to next stage; OEE
How to get the baseline
For 2 weeks supervisor logs every stoppage in a register: time stopped, time help arrived, time restarted, reason; or stopwatch sample of response times
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
any plant
Do first
Standardised work, Visual management
Works well with
Poka-yoke (mistake-proofing), IoT machine monitoring, OEE measurement (loss tracking), Daily management (tiered daily meetings), Automated visual inspection (machine vision / AI camera)
Common pitfall
If nobody responds to the light quickly, or operators are blamed for stopping, people stop pulling the cord and the system dies
Last verified
17 Oct 2026
Published results for Jidoka and andon (stop-the-line signalling)
MetricResultContextCountrySource typeCitation
unscheduled downtime55.55% reduction in unscheduled downtime and 4% increase in OEE (IoT andon + BI dashboard)genset manufacturing business, single casePeer-reviewed studyNarassima M.S., Gunasekaran A., Thenarasu M., Gedam V.V., Karuppiah K. (2026). An integrated Lean-IoT-business intelligence model of IS success on the manufacturing shop floor. Production Planning & Control, 1-24
response time to andon callabout 24 min average to about 5 min within four months (vendor states 75%)medical device plant, Vandergrift PA, digital andon softwareUSVendor-reportedSmartSights (n.d.). Cook Medical: Next-Generation Andon Case Study. Vendor case study
Training in India for Jidoka and andon (stop-the-line signalling)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing Toyota Production System - Why, What and Howclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager

Just-in-Time (JIT) production and purchasing

Lean/TPS
Also known as
JIT; just in time; JIT manufacturing; JIT purchasing; JIT supply
Family
Lean/TPS
What it fixes
Make and buy only what the next step needs, when it needs it, so stock, waiting and lead time shrink across the plant
Symptoms on the floor
Raw material runs out - or too much is lying around; An order takes weeks to go through the plant; Half-finished parts pile up between machines; Dispatch dates keep slipping; The floor is cluttered, no space to grow
Measure before and after
Inventory days (RM, WIP, FG) or inventory turns; order lead time door-to-door; on-time delivery %; stock-outs per month
How to get the baseline
Monthly stock register / ERP closing stock divided by daily consumption = days of stock; tag 10 orders and log date in and date dispatched in a register to get lead time
Who leads it
owner/MD
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
5S (workplace organisation), SMED (quick changeover), TPM (Total Productive Maintenance), Kanban (pull system)
Works well with
Kanban (pull system), Heijunka (production levelling), In-plant milk-run with supermarket, Supplier development, Vendor-managed inventory (VMI), Value Stream Mapping, Takt time planning
Common pitfall
Cutting stock before setups, breakdowns and supplier reliability are fixed simply turns hidden problems into line stoppages and missed dispatches
Last verified
17 Oct 2026
Published results for Just-in-Time (JIT) production and purchasing
MetricResultContextCountrySource typeCitation
inventory levelinventories came down by 47%; lead times down 28% (JIT-Kanban with digital twin, 12 SMEs)12 small and medium automotive parts manufacturers, 30-month action research; JIT-Kanban combined with cloud digital twinSAPeer-reviewed studyAldouri SNM (2025). Digital Twin-Enabled Just-In-Time and Kanban Implementation Framework for Industry 4.0 Transformation in SMEs. International Journal of Industrial Engineering and Management 16(4):339-358
Training in India for Just-in-Time (JIT) production and purchasing
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNRLL Series M6 - Lean Tools for Supply Chain Management: JIT and Kanbanonlineself-pacedRs.1500onlineshop manager, supervisor
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing Toyota Production System - Why, What and Howclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager

Kaizen (continuous improvement)

Lean/TPS
Also known as
kaizen events; kaizen blitz; suggestion system
Family
Lean/TPS
What it fixes
Small, frequent improvements made by the people who do the work, measured every week
Symptoms on the floor
The same problem comes back every month; Improvement drives start well and fade out; Output swings shift to shift; Overtime keeps rising, output does not; Too many people for the output we get
Measure before and after
Cycle time per station; output per person-hour; number of kaizens implemented per month
How to get the baseline
Time 20 cycles per station on the target line; count implemented ideas over the last 3 months
Who leads it
shop manager
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
5S (workplace organisation)
Works well with
Value Stream Mapping, Standardised work, 5S (workplace organisation)
Common pitfall
Without a weekly review rhythm the idea board dies in 2-3 months
Government support in India
Kaizen is in MSME Lean scheme curriculum; ZED parameter Daily Works Management
Last verified
17 Oct 2026
Published results for Kaizen (continuous improvement)
MetricResultContextCountrySource typeCitation
cycle time; productivitycycle time 80 -> 75 s; productivity +6.7%; line efficiency +2.9%automotive assembly lineINPeer-reviewed studySangwa N.R., Sangwan K.S. (2020). Continuous Kaizen Implementation to Improve Leanness: A Case Study of Indian Automotive Assembly Line. Springer, Sustainable Production, Life Cycle Engineering and Management
productivity; lead timeproductivity +57.15%; lead time -69.47%small-scale enterprise, kaizen chosen via VSMINPeer-reviewed studyKumar S., Dhingra A.K., Singh B. (2018). Kaizen Selection for Continuous Improvement through VSM-Fuzzy-TOPSIS in Small-Scale Enterprises: An Indian Case Study. Advances in Fuzzy Systems
Training in India for Kaizen (continuous improvement)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPKaizenonlineself-pacedRs.250onlineshop manager, supervisor, operator
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
National Productivity Council (NPC)Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0classroom5 daysPuriplant head, shop manager, maintenance head
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
CII Institute of QualityLean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior managementhandholding/consultingengagement-basedBengaluru (pan-India delivery)owner/MD, plant head, quality head
CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), MumbaiIn-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safetyin-planttailoredMumbai (delivered pan-India)plant head, shop manager, supervisor
Quality Circle Forum of India (QCFI)40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yokeclassroom4 daysBhubaneswarshop manager, supervisor, operator
Quality Circle Forum of India (QCFI) - chaptersChapter Conventions on Quality Concepts (CCQC 2026) - Tirupati, Nagpur, Pune (virtual)classroom1-2 daysTirupati; Nagpur; Pune (virtual)supervisor, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)World Class Manufacturing - What, Why and How; Tools and Techniquesclassroom2 daysBengaluruowner/MD, plant head
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager
ACMA (Automotive Component Manufacturers Association of India)E-learning: Material Flow Cost Accounting (MFCA) incl. MFCA in Kaizen and supply chainonlineself-paced modulesonlineplant head, quality head
ACMA regional chaptersRegional Kaizen Competition; Poka Yoke & SMED Competition (ACMA North / West)classroom1 dayNCR / Uttarakhand; Puneshop manager, supervisor, operator

Kanban (pull system)

Lean/TPS
Also known as
pull production; supermarket; two-bin system
Family
Lean/TPS
What it fixes
Make or move parts only when the next step signals it needs them, so stock between machines stays small and fixed
Symptoms on the floor
Half-finished parts pile up between machines; Raw material runs out - or too much is lying around; Dispatch dates keep slipping; Workers wait for material, cranes or instructions
Measure before and after
WIP units/value between stations; raw-material days of stock; stockout count per month; replenishment time
How to get the baseline
Count WIP at each buffer twice a day for 2 weeks; list stockouts from the store register
Who leads it
shop manager
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Electrical and electronics, Assembly lines, Plastics and rubber
Do first
5S (workplace organisation), SMED (quick changeover)
Works well with
Value Stream Mapping, SMED (quick changeover), Heijunka (production levelling)
Common pitfall
Fails with long changeovers or unreliable machines - fix those first
Government support in India
JIT-Kanban is in MSME Lean scheme curriculum
Last verified
17 Oct 2026
Published results for Kanban (pull system)
MetricResultContextCountrySource typeCitation
WIP; kanban cards; replenishment timeWIP -27.79% (~20,000 units); cards 48 -> 38; replenishment 6.94 -> 6.53 daysbearing manufacturer (authors from Pune)INPeer-reviewed studyUkey K., Gajghate S.S., Kumar S., Kumar Behera A., Majumder H. (2025). Execution of Pull System and Constant Work-in-Process Using Kanban System - A Case Study. Engineering Proceedings (MDPI)
WIP between process steps-56% (injection -> painting); -45% (painting -> dispatch)SME, polymer automotive parts, with SMED and levellingPTPeer-reviewed studyMartins B. et al. (2021). Implementation of a Pull System - A Case Study of a Polymeric Production System for the Automotive Industry. Management Systems in Production Engineering 29(4):253-259
Training in India for Kanban (pull system)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNRLL Series M6 - Lean Tools for Supply Chain Management: JIT and Kanbanonlineself-pacedRs.1500onlineshop manager, supervisor
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Materials Management and Inventory Controlclassroom2 daysBengaluruplant head, shop manager

Line-side kitting

Planning
Also known as
kitting; kit supply; set parts supply; SPS; set pallet; kit trolley
Family
Planning
What it fixes
Stores pre-pick all parts for one product or one job into a kit and deliver it to the station, so operators stop walking and searching
Symptoms on the floor
Workers wait for material, cranes or instructions; People waste time looking for tools, dies, gauges; Raw material runs out - or too much is lying around; The floor is cluttered, no space to grow; Small batches and many variants kill output
Measure before and after
Operator walk/search time per unit; line stoppages due to material shortage (min/shift); line-side storage area; line-side inventory value; wrong-part assembly errors
How to get the baseline
Time-study 10 cycles at one station and split out walking/searching for parts; log every line stop for missing material in a register for two weeks; measure line-side rack area
Who leads it
shop manager
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Electrical and electronics, Assembly lines
Do first
5S (workplace organisation), ABC/XYZ inventory classification, Standardised work
Works well with
In-plant milk-run with supermarket, Kanban (pull system), Just-in-Time (JIT) production and purchasing, Poka-yoke (mistake-proofing), Spaghetti diagram (travel mapping), Plant layout redesign (Systematic Layout Planning)
Common pitfall
Kitting only some of the parts may not cut operator fetching time and adds picking work in stores (Hanson & Medbo 2012)
Last verified
17 Oct 2026
Published results for Line-side kitting
MetricResultContextCountrySource typeCitation
operator walk time; line side storage space; inventory valueoperator walk time -78.3%; line side storage space -69%; inventory value -54.3%; line side replenishment -29.6%excavator engine assembly line, Bangalore (with Caterpillar logistics); continuous supply replaced by lean kittingINCase studyRamappa R., Sharath Kumar K.M., Nairy A.K. (2013). Improvement of Material Feeding System for an Excavator Assembly Line through Lean Principles. SASTECH Journal 12(2):27-
material flow lead timematerial flow lead time -28.55%; non value added activities -11.91%automotive booster assembly line, mixed-model plant; continuous supply replaced by lean supply kitting (Pune authors)INCase studyKarandikar V., Sane S., Pulkurte R. (2014). Improvement in Line feeding System in Assembly Plant using Lean Manufacturing Techniques. International Journal of Current Engineering and Technology 4(3):1594-1599
Training in India for Line-side kitting
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
IIM Mumbai - Open MDPWarehouse Design & Automationclassroom3 daysMumbaiplant head

Measurement System Analysis (Gauge R&R)

Measurement
Also known as
gauge R&R; GRR; MSA; gauge repeatability and reproducibility; attribute agreement analysis
Family
Measurement
What it fixes
Check whether your gauges and inspectors give the same reading on the same part before trusting any quality data
Symptoms on the floor
Customers complain or send material back; Too much rejection and rework; Quality depends on one experienced operator; The same problem comes back every month
Measure before and after
%GRR (of study variation or tolerance); number of distinct categories (ndc); inspector agreement % for visual checks
How to get the baseline
10 parts x 2-3 inspectors x 2-3 repeat readings with the shop's own gauge, blind order, calculate %GRR in Excel/AIAG sheet
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Plastics and rubber
Works well with
Statistical Process Control (SPC), Design of Experiments (DOE / Taguchi), Six Sigma (DMAIC), ISO 9001 quality management system, Process FMEA (PFMEA)
Common pitfall
Study is run once for the customer audit and filed; high GRR is never traced to gauge, fixture or inspector method and fixed
Last verified
17 Oct 2026
Published results for Measurement System Analysis (Gauge R&R)
MetricResultContextCountrySource typeCitation
Total Gage R&RTotal Gage R&R from 67.80% to 10.11% after adding a Go/No-Go pinautomotive stamped part Reinf BK6, 2 operators x 10 parts x 3 repeatsIDCase studySumasto F., Nugroho Y.A., Purwojatmiko B.H., Wirandi M., Imansuri F., Aisyah S. (2023). Implementation of Measurement System Analysis to Reduce Measurement Process Failures on Part Reinf BK6. IJIEM - Indonesian Journal of Industrial Engineering and Management 4(2):212
Training in India for Measurement System Analysis (Gauge R&R)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPISO-9001:2015 and IATF 16949:2016 Quality Management Systemonlineself-pacedRs.2000onlinequality head
Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology CentreJr. Technician - Inspection & Quality Control (NSQF)classroom6 months / 600 hrs₹ 22,000/-No fee for SC/ST (NSQF courses)Bhubaneswarsupervisor, operator
Indian Statistical Institute - SQC & OR Unit HyderabadIn-plant training programmes (top management / middle managers / shopfloor supervisors & operators)in-plant1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloorat client plantowner/MD, plant head, supervisor, quality head, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)Fundamentals of APQP and Implementation of PPAPclassroom2 daysHosurquality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Measurement System Analysis (MSA)classroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Punesupervisor, quality head

OEE measurement (loss tracking)

Measurement
Also known as
Overall Equipment Effectiveness; machine utilisation tracking; downtime logging
Family
Measurement
What it fixes
Measure how much of planned time each machine really makes good parts, and which losses eat the rest
Symptoms on the floor
I don't know how much my machines actually run; Overtime keeps rising, output does not; Machines run slower than they should; One machine or section always holds everyone up; Output swings shift to shift
Measure before and after
OEE = availability x performance x quality per machine; top 5 loss reasons in minutes; share of unclassified stops
How to get the baseline
Manual stop log (start, end, reason) on 2-3 critical machines for 2 weeks; count good parts per shift
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
TPM (Total Productive Maintenance), SMED (quick changeover), Theory of Constraints (drum-buffer-rope)
Common pitfall
Almost half of losses stay unclassified unless reasons are recorded at the machine; OEE between different machines is not comparable
Government support in India
ZED parameter Measurement and Analysis
Last verified
17 Oct 2026
Published results for OEE measurement (loss tracking)
MetricResultContextCountrySource typeCitation
typical OEE level~55% (about 20 cases); performance losses dominatefield study of manufacturing casesSEPeer-reviewed study (baseline, not a result)Ljungberg O. (1998). IJOPM 18(5):495-507
typical OEE level with automatic measurementaverage 65% (23 companies, 884 machines); ~half of losses unclassifiedautomatic OEE measurement, discrete manufacturingSEPeer-reviewed study (baseline, not a result)Hedman R., Subramaniyan M., Almstrom P. (2016). Analysis of critical factors for automatic measurement of OEE. Procedia CIRP 57:128-133
Training in India for OEE measurement (loss tracking)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPTotal Productive Maintenance (TPM): Basic Programmeonlineself-pacedRs.1200onlineshop manager, supervisor, maintenance head
National Productivity Council (NPC)Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0classroom5 daysPuriplant head, shop manager, maintenance head
National Institute for MSME (NI-MSME)Smart Production Management with AI Decision (SED/SM/4)classroom3 daysHyderabadowner/MD, plant head
CII TPM Club India (CII-IQ)CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membershipcertificationassessment-basedpan-Indiaowner/MD, plant head, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Machine Breakdown Analysisclassroom2 daysPunesupervisor, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Enhancing Productivity in Grinding Operationsclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Hosurshop manager, supervisor, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)Understanding TPM and Roadmap for Implementation of TPMclassroom2 daysHosurplant head, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Introduction to Digital Factoryclassroom2 daysBengaluruplant head, maintenance head
IIM Mumbai (formerly NITIE) - Open MDPManufacturing & Operational Excellenceonline3 days / 18 hoursBulk discount for 5+ participants from same organisationonlineplant head, shop manager, quality head, maintenance head

Overall Labour Effectiveness (OLE)

Measurement
Also known as
OLE; labour OEE; revised OLE (ROLE); labour productivity measurement
Family
Measurement
What it fixes
Measures how much of paid worker time turns into good output: availability x performance x quality, like OEE but for people
Symptoms on the floor
Too many people for the output we get; Overtime keeps rising, output does not; Output swings shift to shift; Workers wait for material, cranes or instructions
Measure before and after
OLE % per section/shift (availability, performance, quality ratios); good pieces per paid labour-hour; overtime hours per good piece
How to get the baseline
Attendance register + shift log of waiting/idle time (material, crane, instructions), output counted against standard time per piece, rejects from QC register; compute OLE per shift for 2-4 weeks
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
Time and motion study, Standardised work
Works well with
OEE measurement (loss tracking), Work sampling, Assembly line balancing, Skill matrix and cross-training, Daily management (tiered daily meetings), Time and motion study
Common pitfall
OLE only measures; if losses are blamed on workers instead of the waiting and rework causes behind them, numbers get gamed and nothing improves
Last verified
17 Oct 2026
Published results for Overall Labour Effectiveness (OLE)
MetricResultContextCountrySource typeCitation
Return on assets (ROA), average of 4 periods after vs 4 before introducing OLEaverage ROA increased by 1.4%Czech manufacturing company, introduction of OLE indicatorCZPeer-reviewed studyBrabec Z., Jacova H. (2022). Overall Labor Effectiveness as a Tool for Measuring Performance in a Given Company. ACC Journal 28(2)
EBIT per converted employeeaverage EBIT per converted employee increased by approximately 20,000 CZKCzech manufacturing company, introduction of OLE indicatorCZPeer-reviewed studyBrabec Z., Jacova H. (2022). Overall Labor Effectiveness as a Tool for Measuring Performance in a Given Company. ACC Journal 28(2)

Pareto analysis (80/20)

Measurement
Also known as
Pareto chart; 80/20 rule; vital few
Family
Measurement
What it fixes
Rank defects or stoppages by count or cost so you fix the few causes that make most of the loss first
Symptoms on the floor
Too much rejection and rework; Machines break down again and again; The same problem comes back every month; Customers complain or send material back; I don't know how much my machines actually run
Measure before and after
Share of total rejection/downtime from the top 1-3 causes; total rejection % or downtime hours
How to get the baseline
Tally rejections or stoppages by cause from the existing rejection/breakdown register (or a check sheet for 2-4 weeks) and sort largest first
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Ishikawa (fishbone) cause-and-effect diagram, 5-Why root cause analysis, 8D problem solving, Six Sigma (DMAIC), OEE measurement (loss tracking), Cost of Poor Quality (COPQ) measurement
Common pitfall
Counting by frequency instead of cost/minutes lost points the team at frequent but cheap problems
Last verified
17 Oct 2026
Published results for Pareto analysis (80/20)
MetricResultContextCountrySource typeCitation
process rejection rate from dominant cause (inappropriate composition)rejection rate 2.54% -> 0.82%; dominant cause = 84% of total rejection; unit cost -2.50%pharmaceutical drug production; Pareto + SPC + fishbone within HACCPPeer-reviewed studyKharub M. (2020). Integrating the HACCP and SPC for hazard control and process improvement: a case of pharmaceutical industry. International Journal of Pharmaceutical and Healthcare Marketing 14(4):561-586
Training in India for Pareto analysis (80/20)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPBasic 7QC Toolsonlineself-pacedRs.250onlinesupervisor, quality head, operator
Quality Circle Forum of India (QCFI) HQWebinar on 'Basic Statistical Analysis'online2 days (10 AM - 4 PM)onlinesupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)8D Problem Solving Methodology and 7QC Toolsclassroom2 daysGurugramsupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Problem-Solving Tools for Securing our Present & Futureclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Chhatrapati Sambhajinagarshop manager, supervisor

Plant layout redesign (Systematic Layout Planning)

Lean/TPS
Also known as
facility layout planning; SLP; Muther SLP; re-layout; flow-oriented layout
Family
Lean/TPS
What it fixes
Re-arrange machines, stores and aisles in the order the material flows, using a from-to chart, so parts travel less and space frees up
Symptoms on the floor
The floor is cluttered, no space to grow; Workers wait for material, cranes or instructions; An order takes weeks to go through the plant; Half-finished parts pile up between machines; Too many people for the output we get
Measure before and after
Total material travel distance per product (m); material handling cost or trips per day; floor area used (sq m); throughput time
How to get the baseline
Draw the current plan to scale, list each product route, measure distances between stations with a tape or wheel and multiply by trips per day (from-to chart)
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Machining and engineering, Assembly lines, Textiles and garments, Food and FMCG, Packaging and printing
Do first
Spaghetti diagram (travel mapping), Value Stream Mapping
Works well with
Cellular manufacturing (one-piece flow cells), 5S (workplace organisation), In-plant milk-run with supermarket, Line-side kitting, Workstation ergonomics
Common pitfall
Most published SLP cases are proposals on paper; the gain appears only if the layout is physically moved and the routing is then followed
Last verified
17 Oct 2026
Published results for Plant layout redesign (Systematic Layout Planning)
MetricResultContextCountrySource typeCitation
operator travel distance per standard task cycleoperator travel distance in the classification area from 25.99 m to 18.16 m (-30.13%)mid-size frozen fruit processor (Peru); SLP layout redesign physically built ('the plant area was physically restructured to match the proposed layout'), 4-month pilot with tracked indicators.PECase studyDiaz Espinoza N., Leon Berrios C.X., Tupia-De-La-Cruz E.L. (2025). Enhancing Productivity through Lean and Layout Redesign: A Case Study in the Frozen Fruit Industry in Peru. IRJEMS 4(5):217-232. doi:10.56472/25835238/IRJEMS-V4I5P131
productivityproductivity from 621 kg/h to 847 kg/h (+36.4%)same Peruvian frozen fruit plant; layout redesign bundled with 5S, standard work and Andon, so layout share not isolated.PECase studyDiaz Espinoza N., Leon Berrios C.X., Tupia-De-La-Cruz E.L. (2025). Enhancing Productivity through Lean and Layout Redesign: A Case Study in the Frozen Fruit Industry in Peru. IRJEMS 4(5):217-232. doi:10.56472/25835238/IRJEMS-V4I5P131
Training in India for Plant layout redesign (Systematic Layout Planning)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPIndustrial Engineering Tools for Productivity Improvementonlineself-pacedRs.2000onlineshop manager, supervisor
National Institute for MSME (NI-MSME)Smart Factory Design & AI Integration: Building Future-Ready MSME Manufacturing Enterprises (SED/SM/5)classroom3 daysHyderabadowner/MD, plant head
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor
IIM Mumbai - Open MDPWarehouse Design & Automationclassroom3 daysMumbaiplant head
IIT Kanpur + IIM Calcutta + IIT MadrasPGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturingclassroom1 year full-time residential (incl. Japan immersion)Kanpur / Kolkata / Chennaiplant head, shop manager

Poka-yoke (mistake-proofing)

Six Sigma/quality
Also known as
error-proofing; baka-yoke; fool-proofing
Family
Six Sigma/quality
What it fixes
A simple jig, sensor or stop that makes the wrong part or wrong step physically impossible
Symptoms on the floor
Too much rejection and rework; Customers complain or send material back; Quality depends on one experienced operator
Measure before and after
Rejections per month (or ppm) for the targeted defect; customer complaints for that defect
How to get the baseline
Pull 6 months of rejection register by defect type; pick the top repeat defect
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Electrical and electronics, Assembly lines, Pharma and medical devices, Packaging and printing
Works well with
Six Sigma (DMAIC), Standardised work
Common pitfall
Fixes one defect at a time; needs a defect register to choose targets
Government support in India
Poka-yoke is in MSME Lean scheme curriculum
Last verified
17 Oct 2026
Published results for Poka-yoke (mistake-proofing)
MetricResultContextCountrySource typeCitation
scrap rate; OEEscrap 1.18% -> 0.56% (-52.5%); OEE 85% -> 90%CNC turning of automotive shafts, low-cost mechanical devicePTPeer-reviewed studyAlcacer V., Costa J., Ferreira R., Mendes D. (2026). Mechanical error-proofing in CNC turning: industrial validation of a Poka-Yoke device for scrap reduction. Production (SciELO)
monthly rejections12-56 per month (Jun-Dec 2016) -> 0 (Jan-Jun 2017)horn assembly line, CoimbatoreINCase studyPremanand N., Kannan V., Sangeetha P., Umamaheswari S. (2018). A Study on Implementation of Poka-Yoke Technique in Improving the Operational Performance by Reducing the Rejection Rate in the Assembly Line. Int. J. Pure and Applied Mathematics 119(17):2177-2191
Training in India for Poka-yoke (mistake-proofing)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
Quality Circle Forum of India (QCFI)40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yokeclassroom4 daysBhubaneswarshop manager, supervisor, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing Toyota Production System - Why, What and Howclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager
ACMA regional chaptersRegional Kaizen Competition; Poka Yoke & SMED Competition (ACMA North / West)classroom1 dayNCR / Uttarakhand; Puneshop manager, supervisor, operator

Predictive maintenance (condition monitoring)

TPM
Also known as
PdM; condition-based maintenance; CBM; vibration analysis; thermography; oil analysis; ultrasound
Family
TPM
What it fixes
Measure machine health (vibration, heat, oil) on a route and repair only when readings show a fault is starting
Symptoms on the floor
Machines break down again and again; I don't know how much my machines actually run; Machines run slower than they should
Measure before and after
Unplanned downtime hours/month on critical machines; number of breakdowns; MTBF; maintenance cost per month; share of planned vs emergency jobs
How to get the baseline
Breakdown register for the last 6-12 months on the 10-20 most critical machines (date, machine, hours lost, cause, spares cost); count emergency vs planned jobs from maintenance log
Cost
Much of the equipment requires cost in excess of $50,000
Who leads it
maintenance head
Plant size (employees)
200-1000, 1000+
Industries
any plant
Do first
Preventive (planned) maintenance, CMMS / digital maintenance log
Works well with
Reliability-centred maintenance (RCM), TPM (Total Productive Maintenance), IoT machine monitoring, OEE measurement (loss tracking), Autonomous maintenance, Energy management system and energy audits, Compressed-air leak detection and repair
Common pitfall
Buying sensors or instruments before ranking critical machines and training someone to read the data turns into alarms nobody acts on
Last verified
17 Oct 2026
Published results for Predictive maintenance (condition monitoring)
MetricResultContextCountrySource typeCitation
breakdowns eliminatedElimination of breakdowns: 70% to 75%; reduction in downtime 35% to 45%; reduction in maintenance costs 25% to 30% (industrial averages from independent surveys)industrial facilities starting a functional predictive maintenance programme; survey averages quoted by US DOE FEMPUSCase studyUS DOE Federal Energy Management Program (2010). Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency, Release 3.0, Ch.5 Types of Maintenance Programs. PNNL for US DOE FEMP
unplanned downtime30% unplanned downtime reduced; 12% total maintenance cost decreasedrotating equipment, one aluminium processing plant, vibration + shock-pulse monitoringPeer-reviewed studyGomes G., Ungureanu N.S., Kalácska G. (2025). Optimizing predictive maintenance for maintenance management development: a hybrid approach using vibration and shock-pulse monitoring. Review of Management and Economic Engineering 24(4):260-271
Training in India for Predictive maintenance (condition monitoring)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPMaintenance - Objectives, Types and Functionsonlineself-pacedRs.250onlinesupervisor, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Care for Machine Tool Spindles - Systematic Approach for Spindle Maintenanceclassroom3 daysRs. 6999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengalurumaintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Effective Maintenance Towards Zero Down Time (ZDT) - Electrical Aspects of CNC Machinesclassroom3 daysRs. 6999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengalurumaintenance head

Preventive (planned) maintenance

TPM
Also known as
planned maintenance; PM; time-based maintenance; PM pillar; scheduled maintenance
Family
TPM
What it fixes
Service machines on a fixed calendar (oil, filters, belts, wear parts) instead of waiting for them to break down
Symptoms on the floor
Machines break down again and again; The same problem comes back every month; Dispatch dates keep slipping; Machines run slower than they should; I don't know how much my machines actually run
Measure before and after
Breakdowns per month; breakdown hours; MTBF; MTTR; maintenance cost per machine; PM plan compliance %
How to get the baseline
Breakdown register per machine for last 3-6 months: date, stop time, restart time, cause, parts; compute MTBF and MTTR in a sheet
Typical duration
26 to 39 weeks
Who leads it
maintenance head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Electrical and electronics, Plastics and rubber, Food and FMCG, Process industries, Packaging and printing
Works well with
Autonomous maintenance, TPM (Total Productive Maintenance), CMMS / digital maintenance log, Predictive maintenance (condition monitoring), Reliability-centred maintenance (RCM), OEE measurement (loss tracking), 5-Why root cause analysis
Common pitfall
A PM calendar that production keeps postponing for urgent orders turns into paper, and breakdowns return
Last verified
17 Oct 2026
Published results for Preventive (planned) maintenance
MetricResultContextCountrySource typeCitation
breakdowns (number), year 3 of TPM25-40% drop in year 1 (model machines), 40-60% in year 2, 70-80% in year 3~70 TPM-practicing companies (domestic and overseas), PM pillar together with JH; auto, ancillary, FMCG, appliances, packing, plastic, refinery, tyres, steelINCase studyRaj B.K. (2021). Benefits of Planned Maintenance - An Analysis of Equipment Failure & Maintenance Costs in 70 TPM Practicing Companies. CII Institute of Quality, Article TPM/2021/02
MTBFindicative tangible benefits: 80% breakdown reduction, 200% MTBF increase, 35% maintenance cost reduction, 31% MTTR reduction~70 TPM-practicing companies (domestic and overseas), CII benchmarkINCase studyRaj B.K. (2021). Benefits of Planned Maintenance - An Analysis of Equipment Failure & Maintenance Costs in 70 TPM Practicing Companies. CII Institute of Quality, Article TPM/2021/02
breakdowns due to failure (CNC machining centres; lathes -23%)breakdowns -23% on CNC lathes, -38% on CNC machining centres; OEE +5%clutches and hydraulic controls manufacturer; CNC lathe and machining-centre cells; AM procedures + PM plansPTPeer-reviewed studyPinto G., Silva F.J.G., Baptista A., Fernandes N.O., Casais R., Carvalho C. (2020). TPM implementation and maintenance strategic plan - a case study. Procedia Manufacturing 51:1423-1430
Training in India for Preventive (planned) maintenance
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPTotal Productive Maintenance (TPM): Basic Programmeonlineself-pacedRs.1200onlineshop manager, supervisor, maintenance head
National Productivity Council (NPC) - e-LEAPMaintenance - Objectives, Types and Functionsonlineself-pacedRs.250onlinesupervisor, maintenance head
National Productivity Council (NPC) - e-LEAPPreventive Maintenanceonlineself-pacedRs.250onlinesupervisor, maintenance head, operator
Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology CentreSr. Technician - Machine Maintenance & Automation (NSQF)classroom6 months / 600 hrs₹ 33,810/-No fee for SC/ST (NSQF courses)Bhubaneswarmaintenance head, operator
CII TPM Club India (CII-IQ)CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membershipcertificationassessment-basedpan-Indiaowner/MD, plant head, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Care for Machine Tool Spindles - Systematic Approach for Spindle Maintenanceclassroom3 daysRs. 6999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengalurumaintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Machine Breakdown Analysisclassroom2 daysPunesupervisor, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Maintenance and Troubleshooting of Hydraulics and Pneumatics Systemsclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Ghaziabadmaintenance head, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)Understanding TPM and Roadmap for Implementation of TPMclassroom2 daysHosurplant head, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Effective Maintenance Towards Zero Down Time (ZDT) - Electrical Aspects of CNC Machinesclassroom3 daysRs. 6999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengalurumaintenance head

Process FMEA (PFMEA)

Six Sigma/quality
Also known as
FMEA; failure mode and effects analysis; RPN; action priority; AIAG-VDA FMEA
Family
Six Sigma/quality
What it fixes
List step by step how each process can go wrong, score the risk, and fix the worst ones before they reach the customer
Symptoms on the floor
Customers complain or send material back; Too much rejection and rework; The same problem comes back every month; Machines break down again and again
Measure before and after
RPN or action priority of top failure modes; defect rate / ppm; customer complaints per month; breakdown minutes
How to get the baseline
Team walks the process flow, lists failure modes, scores severity/occurrence/detection 1-10 using the complaint and rejection registers for occurrence
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Electrical and electronics, Assembly lines, Pharma and medical devices
Do first
Value Stream Mapping
Works well with
Poka-yoke (mistake-proofing), 8D problem solving, Statistical Process Control (SPC), Measurement System Analysis (Gauge R&R), Six Sigma (DMAIC), 5-Why root cause analysis, Ishikawa (fishbone) cause-and-effect diagram, ISO 9001 quality management system
Common pitfall
FMEA is written once as a customer PPAP document and never updated when complaints or new failures appear
Last verified
17 Oct 2026
Published results for Process FMEA (PFMEA)
MetricResultContextCountrySource typeCitation
overall defect rateoverall defect rate was reduced by 87.2%medical device manufacturer, FMEA-based integrated frameworkMYPeer-reviewed studyLiew C.F., Prakash J., Ong K.S. (2019). An FMEA-based integrated framework to quantify and improve operational performance in advanced manufacturing environments: a case study. International Journal of Productivity and Quality Management 28(3):318-339
OEEOEE from 87% to 92%; breakdown time 111 to 85 min/monthcylinder block machining line, automotive, FMEA within DMAICIDPeer-reviewed studyRozak A., Jaqin C., Hasbullah H. (2020). Increasing Overall Equipment Effectiveness in Automotive Company Using DMAIC and FMEA Method. Journal Europeen des Systemes Automatises 53(1):55-60
Training in India for Process FMEA (PFMEA)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPISO-9001:2015 and IATF 16949:2016 Quality Management Systemonlineself-pacedRs.2000onlinequality head
National Productivity Council (NPC) - e-LEAPHazard Identification and Risk Analysisonlineself-pacedRs.250onlineshop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Fundamentals of APQP and Implementation of PPAPclassroom2 daysHosurquality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)How to become an effective FMEA Practitioner (AIAG & VDA)classroom2 daysHosurquality head

Quality circles

People/standard work
Also known as
Quality control circles; QCC; QC circles; Gemba circles (QCFI)
Family
People/standard work
What it fixes
Small groups of shop-floor workers meet weekly, pick a problem in their own area and solve it with simple QC tools
Symptoms on the floor
Too much rejection and rework; The same problem comes back every month; Improvement drives start well and fade out; Quality depends on one experienced operator; Customers complain or send material back
Measure before and after
Rejection/rework % on the circle's chosen problem; inspection time; number of problems closed per circle per year; circle meeting attendance
How to get the baseline
Circle members keep a daily check sheet of defects by type at their station for 2-4 weeks, then make a Pareto chart before starting
Who leads it
quality head
Plant size (employees)
200-1000, 1000+
Industries
any plant
Do first
5S (workplace organisation)
Works well with
Kaizen (continuous improvement), Employee suggestion system, Pareto analysis (80/20), Ishikawa (fishbone) cause-and-effect diagram, 5-Why root cause analysis, A3 problem solving, Daily management (tiered daily meetings)
Common pitfall
Circles fade when management stops attending presentations and approving their proposals quickly
Last verified
17 Oct 2026
Published results for Quality circles
MetricResultContextCountrySource typeCitation
no-load reworkno-load rework reduced from 16% to 2% within five monthscompressor manufacturer, no-load noise rejectionINPeer-reviewed studyMittal A., Gupta P., Kumar V., Chan C.C.K. (2023). The application of quality control circle to improve the PQCDSM quality parameters: a case study. International Journal of Productivity and Quality Management 40(1):102-119
inspection timeinspection time reduced by 50%compressor manufacturerINPeer-reviewed studyMittal A., Gupta P., Kumar V., Chan C.C.K. (2023). The application of quality control circle to improve the PQCDSM quality parameters: a case study. International Journal of Productivity and Quality Management 40(1):102-119
defects per unit (rear combination lamp gap)defect rates per unit decreased from 0.130 to 0.004automotive assembly, MPV rear lamp gap; national (Sinta) journalIDCase studySetiawan S., Kurnia H., Nasihardani D., Putri H.S.D. (2025). Implementation of QCC method to reduce defects in rear combination lamp gaps on MPV vehicles in the automotive industry. Operations Excellence: Journal of Applied Industrial Engineering 17(1)
Training in India for Quality circles
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPQuality, Waste Minimization & Safety Circlesonlineself-pacedRs.250onlinesupervisor, operator
National Productivity Council (NPC) - e-LEAPTQM Implementation for Business Excellenceonlineself-pacedRs.2000onlineowner/MD, plant head, quality head
Quality Council of India - National Board for Quality Promotion (NBQP), Training & Capacity Building DivisionQuality awareness workshops and tailored training / capacity buildingin-planttailoredpan-Indiaowner/MD, quality head
Quality Circle Forum of India (QCFI)40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yokeclassroom4 daysBhubaneswarshop manager, supervisor, operator
Quality Circle Forum of India (QCFI) - chaptersChapter Conventions on Quality Concepts (CCQC 2026) - Tirupati, Nagpur, Pune (virtual)classroom1-2 daysTirupati; Nagpur; Pune (virtual)supervisor, operator

Quick Response Manufacturing (QRM) with POLCA

Planning
Also known as
QRM; POLCA; Paired-cell Overlapping Loops of Cards; MCT reduction
Family
Planning
What it fixes
Cut the calendar time an order spends in the plant: product-focused cells, spare capacity, and POLCA cards that release work only when the next cell can take it
Symptoms on the floor
An order takes weeks to go through the plant; Dispatch dates keep slipping; Half-finished parts pile up between machines; Small batches and many variants kill output; Machines are busy but orders still ship late
Measure before and after
Order lead time (calendar days from order release to dispatch, or MCT); % orders on time; WIP count/value between cells; late-delivery penalty cost
How to get the baseline
Pick 20-30 recent orders from the order register and job cards; write release date and dispatch date for each; average the gap; count jobs waiting in front of each cell once a day for two weeks
Who leads it
plant head
Plant size (employees)
50-200, 200-1000
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal
Do first
Value Stream Mapping, Cellular manufacturing (one-piece flow cells)
Works well with
CONWIP (constant work-in-process), Kanban (pull system), Theory of Constraints (drum-buffer-rope), Finite-capacity scheduling (APS), Cellular manufacturing (one-piece flow cells), Heijunka (production levelling)
Common pitfall
Running machines at near-100% utilisation and releasing every order early defeats QRM; POLCA cards fail if MRP keeps pushing work regardless of cards
Last verified
17 Oct 2026
Published results for Quick Response Manufacturing (QRM) with POLCA
MetricResultContextCountrySource typeCitation
Process lead time (front shape, products P1+P2)14.4 days reduced to 5.23 daysprecision products manufacturer, ETO/MTO, POLCA integrated QRMPKPeer-reviewed studyWang W., Khalid Q.S., Abas M., Li H., Azim S., Babar A.R., Saleem W., Khan R. (2021). Implementation of POLCA Integrated QRM Framework for Optimized Production Performance - A Case Study. Sustainability 13(6):3452
Profit lost to late-delivery penaltiesfrom more than 40% to 0.3% (averaged estimated)precision products manufacturer, ETO/MTO, POLCA integrated QRMPKPeer-reviewed studyWang W., Khalid Q.S., Abas M., Li H., Azim S., Babar A.R., Saleem W., Khan R. (2021). Implementation of POLCA Integrated QRM Framework for Optimized Production Performance - A Case Study. Sustainability 13(6):3452
Total order fulfilment timereduced by 8 weeks, 40% of baselineautomotive industry company, Podkarpackie Province, QRM cellsPLCase studyJedrusik A. (2025). QRM as a Method for Improving Processes, Using the Example of a Company in the Automotive Industry. European Research Studies Journal XXVIII(3):569-575

Reliability-centred maintenance (RCM)

TPM
Also known as
RCM; FMEA-based maintenance strategy; maintenance strategy selection
Family
TPM
What it fixes
For each critical machine, list how it can fail and pick the right maintenance task per failure: inspect, replace on schedule, monitor, or run to failure
Symptoms on the floor
Machines break down again and again; The same problem comes back every month; One machine or section always holds everyone up
Measure before and after
Breakdown downtime minutes/month per critical machine; failure rate; MTBF; availability %; maintenance cost
How to get the baseline
From the breakdown register, rank machines by downtime x impact; for top machines list failures by component for last 12 months and compute MTBF = run hours / number of failures
Who leads it
maintenance head
Plant size (employees)
200-1000, 1000+
Industries
Machining and engineering, Textiles and garments, Food and FMCG, Process industries
Do first
CMMS / digital maintenance log, Preventive (planned) maintenance, Process FMEA (PFMEA)
Works well with
Predictive maintenance (condition monitoring), TPM (Total Productive Maintenance), Autonomous maintenance, 5-Why root cause analysis, Pareto analysis (80/20), 8D problem solving
Common pitfall
Doing full RCM analysis on every asset exhausts the team; without reliable failure history the analysis is guesswork - limit it to the few critical machines
Last verified
17 Oct 2026
Published results for Reliability-centred maintenance (RCM)
MetricResultContextCountrySource typeCitation
breakdown level (filling machine)breakdown level reduced 40-60% vs semester 1 of 2018food and beverage, filling machine type A, Nutrifood Cibitung factory; autonomous maintenance tasks designed via FMEA-RCMIDPeer-reviewed studyIswidibyo D., Nugroho G., Imam A., Junianto H., Astutik R., Hadi T., Puspasari K. (2019). Developing Autonomous Maintenance through FMEA-RCM Models to Reduce % Machine Breakdown in Food and Beverages Industry. Proc. ICIB 2019, SciTePress, pp.635-639. doi:10.5220/0008434706350639
breakdown downtimebreakdown downtime down 947, 814 and 899 min/month on three machines; failure rate down 6.29%, 6.97%, 6.69%vermicelli factory, three machinesTHPeer-reviewed studyKlomjit P., Pasuktree P. (2016). The Application of Reliability Centered Maintenance in The Sample Factory. Thai Industrial Engineering Network Journal 2(2):35-41
Training in India for Reliability-centred maintenance (RCM)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Machine Breakdown Analysisclassroom2 daysPunesupervisor, maintenance head

Sales and Operations Planning (S&OP)

Planning
Also known as
S&OP; SIOP; integrated business planning; IBP; monthly demand-supply review
Family
Planning
What it fixes
A monthly meeting where sales, production, purchase and finance agree one plan: what will sell, what we can make, what stock we hold
Symptoms on the floor
Dispatch dates keep slipping; Raw material runs out - or too much is lying around; Overtime keeps rising, output does not; Output swings shift to shift
Measure before and after
Forecast accuracy (% or MAPE by product family); finished/raw inventory days; on-time-in-full to customers; order lead time for new products
How to get the baseline
For the last 6 months compare what sales forecast each month vs what was actually dispatched (from sales register); note inventory value at each month end from the balance sheet/stores
Who leads it
owner/MD
Plant size (employees)
200-1000, 1000+
Industries
any plant
Do first
ABC/XYZ inventory classification
Works well with
Finite-capacity scheduling (APS), Heijunka (production levelling), Demand-Driven MRP (DDMRP), Hoshin kanri (policy deployment), Daily management (tiered daily meetings)
Common pitfall
Becomes a sales-forecast reading session without the owner present and without a binding capacity decision, so production keeps reacting to the latest phone call
Last verified
17 Oct 2026
Published results for Sales and Operations Planning (S&OP)
MetricResultContextCountrySource typeCitation
Order lead time for newly introduced products67 percent reductioncompany 1 of 2, Asia Pacific, S&OP for new product introductionPeer-reviewed studyGoh S.H., Eldridge S. (2015). New product introduction and supplier integration in sales and operations planning: Evidence from the Asia Pacific region. International Journal of Physical Distribution & Logistics Management 45(9/10):861-886
Inventory levels30 percent reduction in inventory levelscompany 2 of 2, Asia Pacific, supplier integrated into S&OPPeer-reviewed studyGoh S.H., Eldridge S. (2015). New product introduction and supplier integration in sales and operations planning: Evidence from the Asia Pacific region. International Journal of Physical Distribution & Logistics Management 45(9/10):861-886
Forecast accuracy52 percent improvement in forecast accuracycompany 2 of 2, Asia Pacific, supplier integrated into S&OPPeer-reviewed studyGoh S.H., Eldridge S. (2015). New product introduction and supplier integration in sales and operations planning: Evidence from the Asia Pacific region. International Journal of Physical Distribution & Logistics Management 45(9/10):861-886
Training in India for Sales and Operations Planning (S&OP)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPIntroduction to Works Planning and Controlonlineself-pacedRs.250onlineplant head, shop manager
National Productivity Council (NPC) - e-LEAPMaterials Requirement Planningonlineself-pacedRs.250onlineplant head, shop manager
IIM Calcutta - Executive EducationAdvanced Programme in Smart Manufacturing Leadership (APSML)online8 months (Saturday evening live sessions + 4-day campus visit)Rs. 2,74,000/- + (Applicable Taxes)online + Kolkata campusowner/MD, plant head
IIT Kanpur + IIM Calcutta + IIT MadrasPGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturingclassroom1 year full-time residential (incl. Japan immersion)Kanpur / Kolkata / Chennaiplant head, shop manager

Six Sigma (DMAIC)

Six Sigma/quality
Also known as
Lean Six Sigma; Green Belt/Black Belt projects
Family
Six Sigma/quality
What it fixes
A data-driven project that finds the real cause of a chronic quality problem and locks the fix in
Symptoms on the floor
Too much rejection and rework; Customers complain or send material back; The same problem comes back every month; Output swings shift to shift
Measure before and after
Defects per unit / ppm / first-time yield for one product; process capability (Cpk); cost of rejection per month
How to get the baseline
Collect 4-6 weeks of defect data by type and machine; compute FTY and rejection cost from the register
Who leads it
quality head
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Electrical and electronics, Pharma and medical devices
Works well with
Poka-yoke (mistake-proofing), Kaizen (continuous improvement), Statistical Process Control (SPC)
Common pitfall
Needs a trained belt and clean data; overkill for simple defects a poka-yoke can fix
Government support in India
ZED parameters Process Control, Measurement and Analysis, Quality Management
Last verified
17 Oct 2026
Published results for Six Sigma (DMAIC)
MetricResultContextCountrySource typeCitation
defects per unit; first-time yield; OEE; savingsDPU 0.18 -> 0.0068; FTY 83.5% -> 99.32%; OEE 0.48 -> 0.83; ~$140,000/yraluminium die-casting SME, 150 employees, 3 shifts (Lean Sigma: DMAIC + VSM + 5S + TPM)INPeer-reviewed studyKumar M., Antony J., Singh R.K., Tiwari M.K., Perry D. (2006). Implementing the Lean Sigma framework in an Indian SME: a case study. Production Planning & Control 17(4):407-423
process sigma level; savingssigma 1.40 -> 5.46; Rs 0.288 million per annumSME, bicycle-chain bushesINPeer-reviewed studyKaushik P., Khanduja D., Mittal K., Jaglan P. (2012). TQM Journal 24(1):4-16
Training in India for Six Sigma (DMAIC)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
Indian Statistical Institute - SQC & OR Unit HyderabadIn-plant training programmes (top management / middle managers / shopfloor supervisors & operators)in-plant1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloorat client plantowner/MD, plant head, supervisor, quality head, operator
CII Institute of QualityLean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior managementhandholding/consultingengagement-basedBengaluru (pan-India delivery)owner/MD, plant head, quality head
IIT Kanpur + IIM Calcutta + IIT MadrasPGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturingclassroom1 year full-time residential (incl. Japan immersion)Kanpur / Kolkata / Chennaiplant head, shop manager

Skill matrix and cross-training

People/standard work
Also known as
multi-skilling; cross-training; versatility chart; skill map; flexibility matrix
Family
People/standard work
What it fixes
A wall chart of who can run which machine/job at what level, used to plan training so absences and bottlenecks don't stop the line
Symptoms on the floor
Quality depends on one experienced operator; One machine or section always holds everyone up; Output swings shift to shift; Workers wait for material, cranes or instructions; Too many people for the output we get
Measure before and after
No. of operators qualified per critical machine/job; output lost on days with absenteeism; line efficiency %; labour productivity (pcs per operator-hour)
How to get the baseline
Supervisor fills a people x jobs grid (0-4 level) from his own knowledge; from attendance and production registers, compare output on full-attendance days vs absence days
Who leads it
supervisor
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Machining and engineering, Electrical and electronics, Assembly lines, Textiles and garments, Food and FMCG, Packaging and printing
Do first
Standardised work
Works well with
TWI Job Instruction, Assembly line balancing, Standardised work, Cellular manufacturing (one-piece flow cells), Daily management (tiered daily meetings)
Common pitfall
Training everyone on everything wastes time and skills fade; simulation research (Nembhard 2014, IJOPM) finds moderate cross-training (about two tasks) beats heavy rotation
Last verified
17 Oct 2026
Published results for Skill matrix and cross-training
MetricResultContextCountrySource typeCitation
sewing line efficiency; labour productivityEfficiency +21%, labour productivity +22% (balanced layout with multi-skilled manpower)apparel sewing line; multi-skilling combined with line balancing and modular/traditional layoutPeer-reviewed studyShumon, M.R.H., Arif-Uz-Zaman, K., Rahman, A. (2012). Productivity improvement through balancing process using multi-skilled manpower in apparel industries. International Journal of Industrial and Systems Engineering 11(1/2):31-
Training in India for Skill matrix and cross-training
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPSupervisor and His Jobonlineself-pacedRs.250onlinesupervisor

SMED (quick changeover)

Lean/TPS
Also known as
Single-Minute Exchange of Die; quick die change; setup reduction
Family
Lean/TPS
What it fixes
Cut the time a machine stands still between the last good part of one job and the first good part of the next
Symptoms on the floor
Machines stand idle waiting for setup / changeover; Small batches and many variants kill output; Output swings shift to shift
Measure before and after
Changeover time per change (last good part -> first good part), split internal/external steps; changes per shift; OEE availability
How to get the baseline
Video or stopwatch 5-10 changeovers on the target machine; log every changeover for 2 weeks
Who leads it
shop manager
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Forging, casting and sheet metal, Plastics and rubber, Pharma and medical devices, Packaging and printing
Do first
5S (workplace organisation)
Works well with
TPM (Total Productive Maintenance), Standardised work, OEE measurement (loss tracking)
Common pitfall
Gains fade if the new changeover steps are not written into standard work and checked
Government support in India
ZED parameter Daily Works Management / Waste Management; SMED is in MSME Lean scheme curriculum
Last verified
17 Oct 2026
Published results for SMED (quick changeover)
MetricResultContextCountrySource typeCitation
die changeover time-43% to -45%; OEE 70% afterforging plant, die change on three press capacitiesPeer-reviewed studySundaramali G., Kandavel T.K., Santhosh Raj K., Anirudh S. (2024). Application of SMED to improve overall equipment effectiveness of die change over activities in a forging industry - a case study. Int. J. Productivity and Quality Management 42(4):445-458
welding machine changeover time-61%; >40 min of production time recovered (+4 gratings, efficiency +4.77%)bridge-grating production line, welding stationPLPeer-reviewed studyOcieczek W., Krasniewski D., Furman J. (2025). Implementation of the SMED method on a production line to improve work efficiency. Production Engineering Archives
Training in India for SMED (quick changeover)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNRLL Series M7 - Lean Tools: Single Minute Exchange of Dies (SMED)onlineself-pacedRs.1500onlineshop manager, supervisor, maintenance head
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
Quality Circle Forum of India (QCFI)40th National Convention on Quality Concepts (NCQC 2026) - case-study competitions on QC, Kaizen, 5S, Lean, SMED, Poka-yokeclassroom4 daysBhubaneswarshop manager, supervisor, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing Toyota Production System - Why, What and Howclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager
IMTMA Training (Indian Machine Tool Manufacturers' Association)Quick Changeover Techniques (SMED) in Discrete Manufacturingclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Chhatrapati Sambhajinagarshop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Quick Changeover Techniques (SMED) in Discrete Manufacturingclassroom2 daysHosurshop manager, supervisor
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager
ACMA regional chaptersRegional Kaizen Competition; Poka Yoke & SMED Competition (ACMA North / West)classroom1 dayNCR / Uttarakhand; Puneshop manager, supervisor, operator
IIM Mumbai (formerly NITIE) - Open MDPManufacturing & Operational Excellenceonline3 days / 18 hoursBulk discount for 5+ participants from same organisationonlineplant head, shop manager, quality head, maintenance head

Spaghetti diagram (travel mapping)

Lean/TPS
Also known as
string diagram; spaghetti chart; walk pattern map; flow diagram
Family
Lean/TPS
What it fixes
Draw on the floor plan every walk of one operator or one part for a shift; the tangle shows wasted travel to cut
Symptoms on the floor
Workers wait for material, cranes or instructions; People waste time looking for tools, dies, gauges; The floor is cluttered, no space to grow; An order takes weeks to go through the plant; Too many people for the output we get
Measure before and after
Walking/travel distance per part or per shift (m); walking time share of cycle; number of trips
How to get the baseline
Follow one operator or one job with a printed floor plan and pen for a full cycle or shift, draw each move, count steps or use a measuring wheel
Who leads it
supervisor
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Gemba walk, Plant layout redesign (Systematic Layout Planning), 5S (workplace organisation), Value Stream Mapping, Line-side kitting, Cellular manufacturing (one-piece flow cells)
Common pitfall
The diagram is only a diagnosis; without moving tools, stores or machines afterwards the distance stays the same
Last verified
17 Oct 2026
Published results for Spaghetti diagram (travel mapping)
MetricResultContextCountrySource typeCitation
total distance traveledtotal distance traveled reduced by 61.2% (with lead time -23.66%, WIP -8.6%)Hibret Manufacturing & Machine Building Industries, machine building; VSM + spaghetti diagramETPeer-reviewed studyGebeyehu S.G., Abebe M., Gochel A. (2022). Production lead time improvement through lean manufacturing. Cogent Engineering 9(1)
total walking distance of inspection process87 m -> 38.50 m (-55.75%); operators -33.33%incoming inspection of car-body (chassis) auto parts; spaghetti chart + container relocationTHCase studyPhakdeewanich C., Thongphrom S. (2020). Efficiency improvement of incoming auto-part inspection: a case study of car body [Thai]. PSRU Journal of Industrial Technology and Engineering 2(2):37-51
Training in India for Spaghetti diagram (travel mapping)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPValue Stream Mappingonlineself-pacedRs.1500onlineplant head, shop manager

Standardised work

People/standard work
Also known as
standard work; SOP at the workstation; standardized work combination table; standard operation sheet
Family
People/standard work
What it fixes
Write down the best known sequence, time and in-process stock for each job, post it at the station, and train everyone to it
Symptoms on the floor
Quality depends on one experienced operator; Output swings shift to shift; Machines run slower than they should; Too much rejection and rework; Improvement drives start well and fade out
Measure before and after
Output per shift vs logged capacity, cycle time and its spread between operators/shifts, operator walking distance, line downtime, defects per shift
How to get the baseline
Video or stopwatch the same job done by 2-3 operators on different shifts for 10 cycles each; note steps, walking, waits; take output per shift from the production logbook
Who leads it
supervisor
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Assembly lines
Do first
5S (workplace organisation), Time and motion study
Works well with
TWI Job Instruction, Skill matrix and cross-training, Takt time planning, Assembly line balancing, Kaizen (continuous improvement), Visual management, Daily management (tiered daily meetings)
Common pitfall
Sheets written by engineers and filed away do not stick; without supervisor checks and updates after each kaizen, operators drift back to old habits
Last verified
17 Oct 2026
Published results for Standardised work
MetricResultContextCountrySource typeCitation
Output per 7 h shift (core making workstation)SW saved 31.6 s per cycle, production up to 58 pieces per 7 h shift (vs 45-50 actual, 54 capacity); productivity up to 6.5 percentCore making process (bottleneck workstation) in a manufacturing company; no investment in machinery or toolingPeer-reviewed studyMor R.S., Bhardwaj A., Singh S., Sachdeva A. (2019). Productivity gains through standardization-of-work in a manufacturing company. Journal of Manufacturing Technology Management 30(6):899-919
Assembly line downtime36 minutes reduction in assembly time, 200 m less operator movement on average, 9.6% reduction in assembly line downtimeMedium chassis assembly line, company in South BrazilBRPeer-reviewed studyFin J.C., Vidor G., Cecconello I., Machado V.C. (2017). Improvement based on standardized work: an implementation case study. Brazilian Journal of Operations & Production Management 14(3):388-395
Output per man-hourproduction output from 45 pieces to 54 pieces per man hour (table states 16.67% increase); attainment 95.79% to 98.95%Automotive assembly line, MalaysiaMYPeer-reviewed studyAbdul Halim N.H., Jaffar A., Yusof N., Jaafar R., Adnan A.N., Mohd Salleh N.A., Azira N.N. (2015). Standardized work in TPS production line. Jurnal Teknologi 76(6):73-78
Training in India for Standardised work
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNRLL Series M4 - Productivity Improvement through Line Balancingonlineself-pacedRs.1500onlineshop manager, supervisor
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
National Productivity Council (NPC) - e-LEAPIndustrial Engineering Tools for Productivity Improvementonlineself-pacedRs.2000onlineshop manager, supervisor
National Productivity Council (NPC) - e-LEAPSupervisor and His Jobonlineself-pacedRs.250onlinesupervisor
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), MumbaiIn-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safetyin-planttailoredMumbai (delivered pan-India)plant head, shop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing Toyota Production System - Why, What and Howclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager
IMTMA Training (Indian Machine Tool Manufacturers' Association)Enhancing Productivity in Grinding Operationsclassroom2 daysRs. 4999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Hosurshop manager, supervisor, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)Lean Daily Work Management (DWM) Systemclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager, supervisor

Statistical Process Control (SPC)

Six Sigma/quality
Also known as
control charts; process capability; Cp/Cpk; X-bar R chart; p-chart
Family
Six Sigma/quality
What it fixes
Plot key dimensions or defect counts on simple charts every shift so drift is caught before bad parts are made
Symptoms on the floor
Too much rejection and rework; Customers complain or send material back; Output swings shift to shift; Quality depends on one experienced operator; The same problem comes back every month
Measure before and after
Cpk of critical dimensions; rejection % or ppm per shift; number of out-of-control points per week
How to get the baseline
Take 25 subgroups of 5 parts from the existing inspection register or gauge readings, plot X-bar/R by hand or in Excel, compute Cpk against drawing tolerance
Who leads it
quality head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Plastics and rubber, Textiles and garments, Pharma and medical devices, Packaging and printing
Do first
Measurement System Analysis (Gauge R&R), Standardised work
Works well with
Measurement System Analysis (Gauge R&R), Six Sigma (DMAIC), Design of Experiments (DOE / Taguchi), Process FMEA (PFMEA), Poka-yoke (mistake-proofing), Jidoka and andon (stop-the-line signalling), Automated visual inspection (machine vision / AI camera)
Common pitfall
Charts get filled in for the auditor but nobody reacts to out-of-control signals, so nothing improves
Last verified
17 Oct 2026
Published results for Statistical Process Control (SPC)
MetricResultContextCountrySource typeCitation
Cpk of drop impact resistanceCpk index was increased from 0.48 to 1.79aluminium two-piece beverage can manufacturer, SPC via PDCAIDPeer-reviewed studySunadi S., Purba H.H., Hasibuan S. (2020). Implementation of Statistical Process Control through PDCA Cycle to Improve Potential Capability Index of Drop Impact Resistance: A Case Study at Aluminum Beverage and Beer Cans Manufacturing Industry in Indonesia. Quality Innovation Prosperity 24(1):104-127
Training in India for Statistical Process Control (SPC)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPBasic 7QC Toolsonlineself-pacedRs.250onlinesupervisor, quality head, operator
National Productivity Council (NPC) - e-LEAPInspection for Quality Controlonlineself-pacedRs.250onlinesupervisor, quality head, operator
National Productivity Council (NPC) - e-LEAPISO-9001:2015 and IATF 16949:2016 Quality Management Systemonlineself-pacedRs.2000onlinequality head
Central Tool Room & Training Centre (CTTC) Bhubaneswar - MSME Technology CentreJr. Technician - Inspection & Quality Control (NSQF)classroom6 months / 600 hrs₹ 22,000/-No fee for SC/ST (NSQF courses)Bhubaneswarsupervisor, operator
Indian Statistical Institute - SQC & OR Unit HyderabadIn-plant training programmes (top management / middle managers / shopfloor supervisors & operators)in-plant1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloorat client plantowner/MD, plant head, supervisor, quality head, operator
Quality Circle Forum of India (QCFI) HQWebinar on 'Basic Statistical Analysis'online2 days (10 AM - 4 PM)onlinesupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Fundamentals of APQP and Implementation of PPAPclassroom2 daysHosurquality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing SPC, a Game Changer for Cost Reductionclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Punesupervisor, quality head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Implementing SPC, a Game Changer for Cost Reductionclassroom2 daysBengalurusupervisor, quality head
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor

Supplier development

Six Sigma/quality
Also known as
supplier development programme; supplier upgrading; cluster programme; Honda BP; supplier quality development
Family
Six Sigma/quality
What it fixes
Buyer actively helps key suppliers fix their quality, delivery and cost (visits, training, joint kaizen) instead of only rating or switching them
Symptoms on the floor
Suppliers deliver late or with defects; Too much rejection and rework; Customers complain or send material back; Dispatch dates keep slipping; Raw material runs out - or too much is lying around
Measure before and after
Supplier incoming rejection PPM; supplier on-time-in-full %; line stoppages due to supplier parts; supplier lead time; cost of supplier-caused rework
How to get the baseline
From goods-receipt and incoming inspection registers: rejections per supplier per month (PPM), late deliveries vs PO date, and production log entries of stops for missing/bad bought-out parts, for the last 3-6 months
Typical duration
52 to 52 weeks
Cost
Rs. 65'000-125'000 per company for Preparatory Cluster (Level 1), 12 months (1 visit / month); Rs. 125'000+ for Advanced Cluster (Lean, 15-18 visits), as of Feb 2016 (UNIDO-ACMA programme)
Who leads it
owner/MD
Plant size (employees)
200-1000, 1000+
Industries
any plant
Do first
ISO 9001 quality management system, Pareto analysis (80/20)
Works well with
8D problem solving, Vendor-managed inventory (VMI), Kaizen (continuous improvement), 5S (workplace organisation), Cost of Poor Quality (COPQ) measurement, In-plant milk-run with supermarket
Common pitfall
Short-term, buyer-demands-only programmes fade; gains often stay on the one line the buyer touched unless the supplier's own management takes ownership
Last verified
17 Oct 2026
Published results for Supplier development
MetricResultContextCountrySource typeCitation
Productivity on lines reengineered by buyer's supplier development teamaverage productivity gains of 50% on lines reengineered by BPHonda of America BP programme, US automotive suppliers, 1994USPeer-reviewed studyMacDuffie J.P., Helper S. (1997). Creating Lean Suppliers: Diffusing Lean Production through the Supply Chain. California Management Review 39(4):118-151
Overall cost competitiveness profile (composite)Overall cost competitiveness profile of ACMA firms improved by 13.3%Indian auto-component SMEs, UNIDO-ACMA-DHI cluster/supplier development programme, 152 firms, 2014-2018INCase studyUNIDO Independent Evaluation Division (2018). Independent Terminal Project Evaluation: Supporting SMEs in the automotive component industry in India (UNIDO-ACMA-DHI Partnership Programme), project 100245
Supplier product defects (range across firms)Reducing product defects by 5 - 90%; improving on-time delivery by 6 - 15%US firms, Supplier Development research of NC State Supply Chain Resource CooperativeUSCase studySupply Chain Resource Cooperative, NC State University (2002). Supplier Development Strategies and Outcomes
Training in India for Supplier development
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
Ministry of MSME - MSME Sustainable (ZED) Certification Scheme (implemented by QCI)ZED Certification (Bronze/Silver/Gold) + Gap Analysis & HandholdingcertificationBronze online self-certification; Silver/Gold with site assessmentRegistration freeSubsidy on certification cost per scheme guidelines; handholding (consultancy) support up to Rs.2 lakh; free ZED certification for women-owned MSMEspan-Indiaowner/MD, plant head, quality head
Indian Statistical Institute - SQC & OR Unit HyderabadIn-plant training programmes (top management / middle managers / shopfloor supervisors & operators)in-plant1-3 days top mgmt; 3-5 days managers; 2-3 days shopfloorat client plantowner/MD, plant head, supervisor, quality head, operator
CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), MumbaiIn-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safetyin-planttailoredMumbai (delivered pan-India)plant head, shop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Fundamentals of APQP and Implementation of PPAPclassroom2 daysHosurquality head
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager

Takt time planning

Lean/TPS
Also known as
takt; customer demand rate; pacing to demand
Family
Lean/TPS
What it fixes
Work out how many seconds per piece the customer demand allows, and pace every station and staffing level to that beat
Symptoms on the floor
Overtime keeps rising, output does not; Dispatch dates keep slipping; Output swings shift to shift; Too many people for the output we get; One machine or section always holds everyone up
Measure before and after
Line cycle time vs takt time, output per man-hour, overtime hours per month, schedule attainment %
How to get the baseline
Takt = available minutes per shift / required pieces per shift (from orders); stopwatch actual cycle time at each station; take overtime hours and attainment from attendance and production registers
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Forging, casting and sheet metal, Assembly lines, Textiles and garments
Do first
Time and motion study
Works well with
Assembly line balancing, Standardised work, Heijunka (production levelling), Value Stream Mapping, Cellular manufacturing (one-piece flow cells)
Common pitfall
Takt is only a number on paper unless stations are rebalanced and standard work set to it; in high-mix shops a single takt hides very different product work contents
Last verified
17 Oct 2026
Published results for Takt time planning
MetricResultContextCountrySource typeCitation
Line cycle time vs taktline CT was reduced by 16.0%, from 78.0 sec to 65.5 sec, managed to be lower than line takt timeAutomotive assembly line (TPS line), Malaysia; takt set from 5 months demand, line rebalanced and standard work appliedMYPeer-reviewed studyAbdul Halim N.H., Jaffar A., Yusof N., Jaafar R., Adnan A.N., Mohd Salleh N.A., Azira N.N. (2015). Standardized work in TPS production line. Jurnal Teknologi 76(6):73-78
Average overtimeAverage overtime was reduced from 193.56 hours to 55.0 hours per monthSame automotive assembly line, Malaysia, after balancing to taktMYPeer-reviewed studyAbdul Halim N.H., Jaffar A., Yusof N., Jaafar R., Adnan A.N., Mohd Salleh N.A., Azira N.N. (2015). Standardized work in TPS production line. Jurnal Teknologi 76(6):73-78
Training in India for Takt time planning
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPNRLL Series M4 - Productivity Improvement through Line Balancingonlineself-pacedRs.1500onlineshop manager, supervisor
IIM Mumbai (formerly NITIE) - Open MDPManufacturing & Operational Excellenceonline3 days / 18 hoursBulk discount for 5+ participants from same organisationonlineplant head, shop manager, quality head, maintenance head

Theory of Constraints (drum-buffer-rope)

TOC
Also known as
TOC; DBR; bottleneck management; Goldratt
Family
TOC
What it fixes
Find the one machine that limits the whole plant, keep it running every minute, and pace everything else to it
Symptoms on the floor
One machine or section always holds everyone up; Machines are busy but orders still ship late; Dispatch dates keep slipping; An order takes weeks to go through the plant; Half-finished parts pile up between machines
Measure before and after
Output of the bottleneck per shift; bottleneck idle minutes; on-time dispatch %; lead time; WIP
How to get the baseline
Find where WIP piles up; log the bottleneck's running vs idle time for 2 weeks; take on-time % from dispatch register
Who leads it
owner/MD
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Textiles and garments, Process industries
Works well with
Value Stream Mapping, OEE measurement (loss tracking), Kanban (pull system)
Common pitfall
Literature reports almost no failures - expect smaller gains; bottleneck moves after the fix
Last verified
17 Oct 2026
Published results for Theory of Constraints (drum-buffer-rope)
MetricResultContextCountrySource typeCitation
lead time; inventory; due-date performance; revenue/throughputlead time -69% (n=32); inventory -50% (n=28); due-date performance +60% (n=12); revenue/throughput +68%review of published TOC applications, mostly manufacturingReview of studiesBalderstone S.J., Mabin V.J. (c.1998). A Review of Goldratt's Theory of Constraints (TOC) - lessons from the international literature. Victoria University of Wellington (basis of Mabin & Balderstone 2003, IJOPM 23(6):568-595, doi 10.1108/01443570310476636)

Time and motion study

Measurement
Also known as
time study; motion study; method study; work measurement; work study; stopwatch study
Family
Measurement
What it fixes
Watch and time each job step with a stopwatch, cut useless motions and waiting, and set a fair standard time per piece
Symptoms on the floor
Too many people for the output we get; Overtime keeps rising, output does not; Output swings shift to shift; Workers wait for material, cranes or instructions; One machine or section always holds everyone up
Measure before and after
Pieces per operator-hour; cycle time per operation; share of non-value-added time; standard vs actual time per piece
How to get the baseline
Supervisor or IE times 10-20 cycles per operation with a stopwatch or phone video, splits each into elements, records waiting/walking, and compares to output register
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Assembly lines, Textiles and garments, Process industries
Works well with
Work sampling, Standardised work, Assembly line balancing, Takt time planning, Workstation ergonomics, Spaghetti diagram (travel mapping)
Common pitfall
Timing people without explaining why turns it into a rate-cutting fight and operators slow down while being watched
Last verified
17 Oct 2026
Published results for Time and motion study
MetricResultContextCountrySource typeCitation
work efficiency (model production)efficiency increased 53 percent; model production capacity reached 237tea-glass manufacturer, model production (moulder work), time survey vs standard timeTRPeer-reviewed studyDuran C., Cetindere A., Aksu Y.E. (2015). Productivity Improvement by Work and Time Study Technique for Earth Energy-glass Manufacturing Company. Procedia Economics and Finance 26:109-113
overall productivity14% productivity increase; annual financial gain 21,84,000 (currency not stated, INR format)sheet-metal stamping, Piaggio Ape 3-wheeler mid-body frame line, Budhale StampingsINCase studyShinde A., Jadhav P., Oswal A. (2023). Productivity Improvement by using Time Study: A Case Study on Mid Body Frame Manufacturing. International Journal For Multidisciplinary Research 5(6)
Training in India for Time and motion study
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPIndustrial Engineering Tools for Productivity Improvementonlineself-pacedRs.2000onlineshop manager, supervisor
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor
IIM Mumbai (formerly NITIE) - Open MDPManufacturing & Operational Excellenceonline3 days / 18 hoursBulk discount for 5+ participants from same organisationonlineplant head, shop manager, quality head, maintenance head

TPM (Total Productive Maintenance)

TPM
Also known as
autonomous maintenance; jishu hozen; planned maintenance
Family
TPM
What it fixes
Operators and maintenance together keep machines in shape so they stop breaking down and stop running slow
Symptoms on the floor
Machines break down again and again; Machines run slower than they should; One machine or section always holds everyone up; Too much rejection and rework
Measure before and after
OEE split into availability x performance x quality; breakdown hours per month; MTBF/MTTR; rejection %
How to get the baseline
Log every stop over 5 minutes with reason and duration for 4 weeks; compute OEE per critical machine
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Forging, casting and sheet metal, Textiles and garments, Process industries, Packaging and printing
Do first
5S (workplace organisation)
Works well with
OEE measurement (loss tracking), SMED (quick changeover), Kaizen (continuous improvement)
Common pitfall
Multi-year programme; stalls if operators are not given time and authority for daily checks
Government support in India
ZED parameter Planned Maintenance & Calibration; TPM is in MSME Lean scheme curriculum; CII TPM Club India (JIPM MoU since 1998) runs TPM certificate
Last verified
17 Oct 2026
Published results for TPM (Total Productive Maintenance)
MetricResultContextCountrySource typeCitation
OEE; breakdown time; rejection; productionOEE +17.08%; breakdown time -23.14%; rejection -17.94%; production +15.63%manufacturing unit, North IndiaINPeer-reviewed studySingh J., Singh H., Sharma V. (2018). Success of TPM concept in a manufacturing unit - a case study. IJPPM 67(3):536-549
OEE51.39% -> 58.81%jute bag plantBDPeer-reviewed studyHaider M.M.N., Rafiquzzaman M. (2023). Implementation of Total Productive Maintenance in a Jute Bag Industry: a Case Study. J. Engineering Science 14(1):137-149
Training in India for TPM (Total Productive Maintenance)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPTotal Productive Maintenance (TPM): Basic Programmeonlineself-pacedRs.1200onlineshop manager, supervisor, maintenance head
National Productivity Council (NPC)Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0classroom5 daysPuriplant head, shop manager, maintenance head
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
CII TPM Club India (CII-IQ)CII TPM Certificate / Excellence in Operational Technology (EOT) award & certification assessment; TPM Club membershipcertificationassessment-basedpan-Indiaowner/MD, plant head, maintenance head
IMTMA Training (Indian Machine Tool Manufacturers' Association)World Class Manufacturing - What, Why and How; Tools and Techniquesclassroom2 daysBengaluruowner/MD, plant head
IMTMA Training (Indian Machine Tool Manufacturers' Association)Understanding TPM and Roadmap for Implementation of TPMclassroom2 daysHosurplant head, maintenance head
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager
IIT Kanpur + IIM Calcutta + IIT MadrasPGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturingclassroom1 year full-time residential (incl. Japan immersion)Kanpur / Kolkata / Chennaiplant head, shop manager

TWI Job Instruction

People/standard work
Also known as
Training Within Industry; TWI-JI; 4-step job instruction; JI
Family
People/standard work
What it fixes
A 4-step way for supervisors to teach a job (prepare, show, try, follow up) so new operators get it right fast and the same way
Symptoms on the floor
Quality depends on one experienced operator; Too much rejection and rework; Output swings shift to shift; The same problem comes back every month; Too many people for the output we get
Measure before and after
Days for a new operator to reach standard output; first-pass yield / rejection per operator; output variation between operators and shifts; training hours per operator
How to get the baseline
From production and rejection registers, compare output and rejects of new vs experienced operators per job; note days until a new joiner reaches target output
Who leads it
shop manager
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
Standardised work
Works well with
Standardised work, Skill matrix and cross-training, Kaizen (continuous improvement), Daily management (tiered daily meetings), Poka-yoke (mistake-proofing)
Common pitfall
Training supervisors once without job breakdown sheets and follow-up on the floor turns JI into a classroom course that changes nothing
Last verified
17 Oct 2026
Published results for TWI Job Instruction
MetricResultContextCountrySource typeCitation
firm productivity vs non-trained applicants+6% productivity within one year, rising to +27% after ten years11,575 US firms that applied to the TWI programme 1940-45; trained vs non-trained applicantsUSWorking paperBianchi, N., Giorcelli, M. (2022). The Dynamics and Spillovers of Management Interventions: Evidence from the Training within Industry Program. Journal of Political Economy 130(6):1630-1675 (figures from NBER Working Paper 28833, 2021)
share of companies with production up at least 25%86% of 600 companies increased production by at least 25%; 100% reduced training time by 25% or more; 55% reduced scrap by at least 25%1945 TWI programme report, 600 participating US companies (cited secondhand)USCase studyMisiurek, B., Koch, T. (2014). Teaching formula of the training for operators on effective application of lean management tools. Management and Production Engineering Review 5(1):21-27

Value analysis / value engineering

Six Sigma/quality
Also known as
VA/VE; VAVE; value analysis; function cost analysis; design to cost
Family
Six Sigma/quality
What it fixes
Take your costliest parts, ask what each must do, and redesign material, shape or process to make it cheaper without losing function
Symptoms on the floor
Material cost per part is too high, margins shrinking; Too much rejection and rework
Measure before and after
Material + conversion cost per part (Rs/piece); weight per part; number of operations; margin on the product
How to get the baseline
Cost sheet per part from purchase rates and routing: raw material weight x rate + machine hours x rate; pick top parts by Pareto of annual spend
Who leads it
owner/MD
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Auto and auto components, Machining and engineering, Forging, casting and sheet metal, Electrical and electronics
Do first
Pareto analysis (80/20)
Works well with
Cost of Poor Quality (COPQ) measurement, Supplier development, Process FMEA (PFMEA), Kaizen (continuous improvement), Design of Experiments (DOE / Taguchi)
Common pitfall
Cutting material without checking the function and the customer's approval causes field failures and lost orders, wiping out the saving
Last verified
17 Oct 2026
Published results for Value analysis / value engineering
MetricResultContextCountrySource typeCitation
component cost reductionrotor 30%, pump body 4%, stator housing 10% cost reductionfuel-dispenser Global Pumping Unit, Indian retail marketINPeer-reviewed studyBhosle, A., Sah, A., Shinde, D. K. (2020). Application of Value Analysis and Value Engineering for Cost Reduction of Global Pumping Unit. In: Advances in Simulation, Product Design and Development, Springer, pp. 663-674
component cost reductioncost reductions of up to 36% of initial component costproduct engineering department of an automotive company, mass-produced componentsBRPeer-reviewed studyCandido, G. M., Kaminski, P. C. (2008). Product value optimisation engineering applied to current component designs: a case study from the Brazilian automotive industry. International Journal of Automotive Technology and Management 8(3):270
Training in India for Value analysis / value engineering
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPValue Analysisonlineself-pacedRs.250onlineowner/MD, plant head
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor

Value Stream Mapping

Lean/TPS
Also known as
VSM; material and information flow mapping
Family
Lean/TPS
What it fixes
Draw how one order really moves through the plant, door to door, and see where it waits
Symptoms on the floor
An order takes weeks to go through the plant; Machines are busy but orders still ship late; Half-finished parts pile up between machines; Too many people for the output we get; Workers wait for material, cranes or instructions
Measure before and after
Order lead time (days, door to door); WIP between each pair of stations; value-added time / lead time
How to get the baseline
Walk one product family with a stopwatch and count WIP at each station on one day; take lead time from 20 recent orders
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Works well with
Kanban (pull system), Theory of Constraints (drum-buffer-rope), Kaizen (continuous improvement), SMED (quick changeover)
Common pitfall
A map without follow-up kaizen changes nothing; big headline numbers usually bundle several tools
Government support in India
VSM is in MSME Lean scheme curriculum
Last verified
17 Oct 2026
Published results for Value Stream Mapping
MetricResultContextCountrySource typeCitation
lead time; WIP; costlead time -27%; WIP -27% to -32%; INR 2,17,728 value-added cost savingsmall-scale industry, KeralaINPeer-reviewed studyMenon B.R., Shalij P.R., Kiron K.R., Sreejith J., Sajeesh P. (2020). Cost value stream mapping as a lean assessment tool in a small-scale industry. IJPQM 30(1):72-91
lead time; WIP; scraplead time -81%; WIP -91%; scrap -90%automobile rubber components (oil seals); bundled with new oven, auto-trimming and kanbanINPeer-reviewed studyPradeep A., Balaji K. (2022). Reduction of lead time in an automobile rubber components manufacturing process through value stream mapping. Proc IMechE Part E
Training in India for Value Stream Mapping
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPValue Stream Mappingonlineself-pacedRs.1500onlineplant head, shop manager
National Productivity Council (NPC) - e-LEAPRapid Lean Learning Courseonlineself-pacedRs.7080onlineplant head, shop manager
National Productivity Council (NPC)Operational Excellence in Manufacturing: Lean, TPM & Industry 4.0classroom5 daysPuriplant head, shop manager, maintenance head
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
CII Institute of QualityLean Six Sigma hand-holding & implementation; cost-saving projects; advanced programmes for senior managementhandholding/consultingengagement-basedBengaluru (pan-India delivery)owner/MD, plant head, quality head
CII Naoroji Godrej Centre of Manufacturing Excellence (CII CME), MumbaiIn-house programmes for companies (curated knowledge modules / coaching): lean, 5S, Kaizen & 3M, cost reduction, safetyin-planttailoredMumbai (delivered pan-India)plant head, shop manager, supervisor
IMTMA Training (Indian Machine Tool Manufacturers' Association)World Class Manufacturing - What, Why and How; Tools and Techniquesclassroom2 daysBengaluruowner/MD, plant head
ACMA Centre for Technology (ACT) - ACMA Cluster ProgrammeACMA Cluster Programme (Foundation QCD cluster, Lean, TPM, Zero-Defect, MFCA, Low-Cost Automation, Energy Efficiency, Safety, Digital)handholding/consultingmulti-month cluster (duration not printed in source)auto-component hubs (Pune, NCR, Chennai etc.)owner/MD, plant head, shop manager
ACMA (Automotive Component Manufacturers Association of India)E-learning: Material Flow Cost Accounting (MFCA) incl. MFCA in Kaizen and supply chainonlineself-paced modulesonlineplant head, quality head
IIM Mumbai (formerly NITIE) - Open MDPManufacturing & Operational Excellenceonline3 days / 18 hoursBulk discount for 5+ participants from same organisationonlineplant head, shop manager, quality head, maintenance head
IIT Kanpur + IIM Calcutta + IIT MadrasPGPEX-VLM: Post Graduate Program for Executives - Visionary Leadership in Manufacturingclassroom1 year full-time residential (incl. Japan immersion)Kanpur / Kolkata / Chennaiplant head, shop manager

Vendor-managed inventory (VMI)

Planning
Also known as
VMI; supplier-managed inventory; consignment stock with supplier replenishment; continuous replenishment
Family
Planning
What it fixes
Supplier sees your stock and usage and refills to agreed min/max levels himself, instead of you raising every purchase order
Symptoms on the floor
Suppliers deliver late or with defects; Raw material runs out - or too much is lying around; Workers wait for material, cranes or instructions; Dispatch dates keep slipping
Measure before and after
Raw-material/packaging stock days; stock-outs or line stops for material per month; total inventory cost; supplier fill rate %
How to get the baseline
Stores ledger: daily closing stock per item vs consumption (days of cover), count of production stoppages/shortage slips for missing material, and PO count per month for the selected items
Who leads it
plant head
Plant size (employees)
200-1000, 1000+
Industries
Auto and auto components, Forging, casting and sheet metal, Food and FMCG, Packaging and printing
Do first
ABC/XYZ inventory classification, Supplier development
Works well with
Kanban (pull system), In-plant milk-run with supermarket, Demand-Driven MRP (DDMRP), Sales and Operations Planning (S&OP), Just-in-Time (JIT) production and purchasing, ABC/XYZ inventory classification
Common pitfall
VMI works only with trust and shared data; managers expecting big cost savings are often disappointed - the main gain is service level and fewer stock-outs
Last verified
17 Oct 2026
Published results for Vendor-managed inventory (VMI)
MetricResultContextCountrySource typeCitation
downstream inventory levelVMI decision-transfer reduces inventory levels by 7% on averageeconometric analysis of item-level data from distributors with actual VMI programmes vs information-sharing only (US); effect beyond information sharing.USPeer-reviewed studyDong Y., Dresner M., Yao Y. (2014). Beyond Information Sharing: An Empirical Analysis of Vendor-Managed Inventory. Production and Operations Management 23(5):817-828
stockoutsVMI decision-transfer reduces stockouts by 31% on average (benefit mostly after first year)same distributor item-level dataset (US); stockout reduction more likely realised after the first year of implementation.USPeer-reviewed studyDong Y., Dresner M., Yao Y. (2014). Beyond Information Sharing: An Empirical Analysis of Vendor-Managed Inventory. Production and Operations Management 23(5):817-828
Training in India for Vendor-managed inventory (VMI)
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
IMTMA Training (Indian Machine Tool Manufacturers' Association)Materials Management and Inventory Controlclassroom2 daysBengaluruplant head, shop manager

Visual management

Lean/TPS
Also known as
visual factory; visual control; KPI boards; production boards; floor marking; shadow boards
Family
Lean/TPS
What it fixes
Make the plan, actual output, problems and standards visible on boards and floor markings so anyone sees status at a glance
Symptoms on the floor
I don't know how much my machines actually run; Output swings shift to shift; People waste time looking for tools, dies, gauges; The floor is cluttered, no space to grow; Dispatch dates keep slipping
Measure before and after
Hour-by-hour plan vs actual; OEE; number of problems logged and closed from boards; time to find tools/material
How to get the baseline
For 2 weeks write hourly plan vs actual on paper per line; time with a stopwatch how long it takes to find a die/gauge; count issues currently logged anywhere
Who leads it
shop manager
Plant size (employees)
50-200, 200-1000, 1000+
Industries
any plant
Do first
5S (workplace organisation)
Works well with
Daily management (tiered daily meetings), OEE measurement (loss tracking), Jidoka and andon (stop-the-line signalling), 5S (workplace organisation), Standardised work, Gemba walk
Common pitfall
Boards are put up once and not updated daily, so within weeks nobody trusts or reads them
Last verified
17 Oct 2026
Published results for Visual management
MetricResultContextCountrySource typeCitation
Improvement memos raised from visual control tables61 improvement memos, 39% fully implemented (24 months; bundle with SMED, 5S, TPM; OEE 87.9% to 92.3%)Leading confectionery producer, >25,000 t/year, 24-month lean programmeRSPeer-reviewed studyDjekic, I., Zivanovic, D., Dragojlovic, S., Dragovic, R. (2014). Lean Manufacturing Effects in a Serbian Confectionery Company - Case Study. Organizacija 47(3):143-152
Training in India for Visual management
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAP5Sonlineself-pacedRs.250onlineshop manager, supervisor, operator
Ministry of MSME - MSME Competitive (LEAN) Scheme (implementing agencies QCI, NPC)MSME Competitive LEAN Scheme: Basic / Intermediate / Advanced levelshandholding/consultingBasic ~2 months (self-paced LMS + pledge); Intermediate/Advanced with lean consultantBasic freeGovt bears 90% of lean-consultant fee for Intermediate/Advanced (per scheme guidelines)pan-India (online LMS + in-plant)owner/MD, plant head, shop manager, supervisor
Quality Circle Forum of India (QCFI)5S training, implementation & certification (in-plant)in-plantengagement-basedat client plantshop manager, supervisor, operator
IMTMA Training (Indian Machine Tool Manufacturers' Association)Lean Daily Work Management (DWM) Systemclassroom1 dayRs. 2999/- +18% GSTGroup concession 10% for 3-5, 20% for 6+ delegates (as printed on IMTMA pages)Bengaluruplant head, shop manager, supervisor

Work sampling

Measurement
Also known as
activity sampling; ratio delay study; snap-reading method
Family
Measurement
What it fixes
Take many random snapshots of people and machines (working, waiting, idle) to see what share of the shift is really productive
Symptoms on the floor
I don't know how much my machines actually run; Workers wait for material, cranes or instructions; Too many people for the output we get; Overtime keeps rising, output does not; Machines run slower than they should
Measure before and after
% of observations productive for operators and machines; OEE; crew size per line/shift
How to get the baseline
Walk the floor at random times over several days with a check sheet, tick each person/machine as working, waiting for material, idle, setup or breakdown; ~2,000 observations give a reliable %
Who leads it
plant head
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Machining and engineering, Assembly lines, Food and FMCG, Process industries
Works well with
Time and motion study, OEE measurement (loss tracking), IoT machine monitoring, Standardised work, Gemba walk, Assembly line balancing
Common pitfall
Observations at fixed predictable times or too few rounds give a flattering, wrong picture
Last verified
17 Oct 2026
Published results for Work sampling
MetricResultContextCountrySource typeCitation
OEE of production lineOEE 32% -> 56% (+24 points); workers productive 50.2% of time at baseline (2,200 observations)beverage manufacturer, fruit juice production line, 24 workers over 2 shifts; actions: work-sequence rearrangement, removing unnecessary activities, standard proceduresCase studyLee K.S. (2014). Work sampling. APO Productivity Methodologies, Tools, and Techniques (Asian Productivity Organization web column)
crew size for two shiftscrew reduced from 24 to 15 workers for two shiftsbeverage manufacturer, fruit juice production lineCase studyLee K.S. (2014). Work sampling. APO Productivity Methodologies, Tools, and Techniques (Asian Productivity Organization web column)
Training in India for Work sampling
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPIndustrial Engineering Tools for Productivity Improvementonlineself-pacedRs.2000onlineshop manager, supervisor
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor

Workstation ergonomics

People/standard work
Also known as
participatory ergonomics; workstation redesign; ergonomic risk assessment (RULA/REBA/OCRA)
Family
People/standard work
What it fixes
Redesign work height, reach, jigs, lifting and layout so operators work faster with less strain, fatigue and injury
Symptoms on the floor
Machines run slower than they should; Too many people for the output we get; Overtime keeps rising, output does not; Too much rejection and rework; Output swings shift to shift
Measure before and after
Pieces per operator-hour; cycle time per piece; rejection %; musculoskeletal complaints / injury days; ergonomic risk score (RULA/REBA/OCRA)
How to get the baseline
Stopwatch cycle time and count output per operator for a few shifts; tally pain complaints and first-aid/injury register; photo/video of postures scored with a RULA sheet
Typical duration
104 to 104 weeks
Who leads it
shop manager
Plant size (employees)
50-200, 200-1000, 1000+
Industries
Machining and engineering, Forging, casting and sheet metal, Electrical and electronics, Assembly lines, Textiles and garments, Packaging and printing
Works well with
5S (workplace organisation), Standardised work, Time and motion study, Cellular manufacturing (one-piece flow cells), Kaizen (continuous improvement)
Common pitfall
Buying chairs and mats without involving operators and without re-measuring output gives comfort claims but no productivity proof
Last verified
17 Oct 2026
Published results for Workstation ergonomics
MetricResultContextCountrySource typeCitation
productivity+16% productivity and -22.7% upper-limb overload risk (OCRA) in about two yearsmanufacturing company, production line; ergonomics training + workstation layout and work organisation changesITPeer-reviewed studyBattevi, N., Vitelli, N. (2013). Ergonomics and productivity: an example applied to a manufacturing industry. La Medicina del Lavoro 104(3):203-212
output quantity; good-quality outputHoles drilled +22%, good holes +50% vs conventional workstationrepetitive drill-press operation, experimental workstation redesign (jig/fixture, chair, work height, reach, training)Peer-reviewed studyDas, B., Shikdar, A.A., Winters, T. (2007). Workstation redesign for a repetitive drill press operation: A combined work design and ergonomics approach. Human Factors and Ergonomics in Manufacturing 17(4):395-410
products per person per dayProducts per person per day +44%, order lead time -46%, workspace -44% (participatory approach)participatory ergonomics in assembly, reported in review citing van Rhijn et al. (2005)Peer-reviewed studyVink, P., Koningsveld, E.A.P., Molenbroek, J.F. (2006). Positive outcomes of participatory ergonomics in terms of greater comfort and higher productivity. Applied Ergonomics 37(4):537-546
Training in India for Workstation ergonomics
ProviderProgrammeFormatDurationFeeSubsidyCitiesFor
National Productivity Council (NPC) - e-LEAPSafety Management Courseonlineself-pacedRs.1800onlineplant head, shop manager, supervisor
National Productivity Council (NPC) - e-LEAPHazard Identification and Risk Analysisonlineself-pacedRs.250onlineshop manager, supervisor
Indian Institution of Industrial Engineering (IIIE), Navi MumbaiGraduateship in Industrial Engineering (IE Grad) - membership-based distance examinationcertificationmulti-year, exam sessions (Aug 2026 session running)distance / exam centresshop manager, supervisor
Prepared by Mama from published studies, case reports and providers' own pages · data as of 17 Oct 2026
Want to see where your floor loses time? Get a free camera plan
Free · no obligation

Get a camera plan for your floor

Tell Mama about your plant and Mama will come back with how many cameras you need, where they go, and the retention your state expects — sized to your floor, in ₹. Built for Indian factories.

  • How many cameras & exact placement
  • Compliance-ready (BIS/STQC, women's night shift)
  • Honest ₹ estimate — guard vs camera-AI

Mama replies by email or phone — whichever you left. No spam, no obligation.