mama Get a free camera plan ☰
Tools

India Factory Incentives Navigator

Buying a line or building a plant? See what the Centre and 4 states (Karnataka, Maharashtra, Tamil Nadu and Uttar Pradesh) pay back, the duty you don't pay and the credit you can unlock: 130 measures, each with the clause behind its number. Data as of

Loading the measures

About this data

The Navigator holds 130 support measures for manufacturing plants: 21 from the Centre and 109 from Karnataka, Maharashtra, Tamil Nadu and Uttar Pradesh. One line is one benefit of one scheme, so a state policy with a capital subsidy, an interest subsidy and a quality-certification refund appears as three lines, each with its own rate, ceiling and conditions

Every rate, ceiling and date is taken from the scheme's own document: the policy text, the government order or notification, the ministry's guidelines or press release, or the circular of the agency that runs it (DGFT, CGTMSE, NCGTC). Each line links to that document and names the paragraph or page where the number is printed, with the date it was last checked. Where a document does not print a number, the Navigator does not show one

The estimate adds up only what can be worked out from your capex, machinery value and term loan, using the formula of each measure. It counts one measure per policy and benefit type, because state policies usually let a plant take one capital subsidy, not several. Guarantees and duty exemptions are kept apart from cash: a guarantee lets you borrow without collateral, and EPCG lets you import machinery without paying customs duty in return for exports, but neither puts rupees in your account. Measures that depend on payroll, tax paid or power bills are listed without a total

Measures whose printed end date has passed are not shown, unless the ministry still describes the scheme as running; then the line says what was checked and when. The Udyam size (micro, small, medium, large) is the one on your certificate. State documents written before April 2025 use older size limits, so check the clause before you apply

Estimate, not legal or tax advice. Check the clause before you apply. Eligibility is decided by the nodal agency named in each line

Read next: before a ₹2 crore expansion loan, prove the capacity you have, before buying another CNC, MSME machinery loans, CGTMSE and leasing

Every measure as text, by Centre and state

The same 130 measures as the Navigator above, with the conditions, the agency that runs each one and the clause of the source document. Open a section to read its table.

Centre

21 measures
Centre: support measures for manufacturing plants
MeasureBenefitTerms as printedPlant sizeIndustryConditionsHow to applyNodal agencyValidSource and clause
ADEETIE: reimbursement of investment-grade energy audit and DPR
ADEETIE (Ministry of Power)
Other support100% of the eligible cost · up to ₹1 lakhmicro, small, medium14 ADEETIE sectorsas for ADEETIE interest subvention; Zone: 60 identified clustersadeetie.beeindia.gov.inBureau of Energy Efficiency (BEE)1 Apr 2025 to 31 Mar 2028BEE ADEETIE scheme page
Clause: Scheme Components (ii)
ADEETIE: interest subvention for energy-efficient technology
Assistance in Deploying Energy Efficient Technologies in Industries & Establishments (Ministry of Power)
Interest subsidyUdyam; bank/FI loan Rs 10 lakh-15 cr; up to 75% debt funding qualifies; net interest floor 2%; minimum 10% energy savings sustainedmicro, small, mediumBrass;Bricks;Ceramics;Chemicals;Fisheries;Food Processing;Forging;Foundry;Glass & Refractory;Leather;Paper;Pharmaceutical;Steel Re-Rolling;TextilesUdyam; bank/FI loan Rs 10 lakh-15 cr; up to 75% debt funding qualifies; net interest floor 2%; minimum 10% energy savings sustained; Zone: 60 identified energy-intensive clustersadeetie.beeindia.gov.inBureau of Energy Efficiency (BEE)1 Apr 2025 to 31 Mar 2028BEE ADEETIE scheme page
Clause: Scheme Components (i); Eligibility; Duration
Credit Guarantee Scheme for Micro and Small Enterprises (CGTMSE, CGS-I)
CGTMSE (Ministry of MSME + SIDBI)
Credit guaranteeLoan up to ₹10 crmicro, smallany industrycollateral-free credit; guarantee ceiling raised from Rs 5 cr to Rs 10 cr by CGTMSE Circular 250/2024-25 dt 18.03.2025 (cited in Circular 251); revised fee applies to guarantees approved/renewed on or after 01.04.2025; Zone: all Indiathrough the lending bankCGTMSE via lending bankCGTMSE Circular No.251/2024-25, 18 Mar 2025
Clause: fee table; ceiling per Circular 250/2024-25 cited in para 1
Advance Authorisation (duty-free import of inputs for exports)
Foreign Trade Policy 2023, Chapter 4
Customs duty exemption100% of the eligible costmicro, small, medium, largeany industryexempt from Basic Customs Duty, additional duty, anti-dumping/safeguard duty (with exceptions) and IGST + Compensation Cess on inputs; actual-user condition; Obligation: inputs must be physically incorporated in export product (SION or self-declared norms); minimum value addition 15% (lower for Appendix 4D products); Zone: all IndiaAdvance Authorisation online on DGFT portalDGFT (Regional Authority)FTP 2023 Chapter 4
Clause: para 4.03, 4.09, 4.14, 4.16
Export Promotion Capital Goods (EPCG) Scheme
Foreign Trade Policy 2023, Chapter 5
Customs duty exemption100% of customs duty on capital goodsmicro, small, medium, largeany industryIEC holder; capital goods for pre-production, production, post-production incl. spares, moulds, dies, jigs, fixtures; import within 24 months, no revalidation; IGST and Compensation Cess also exempt for physical exports; Obligation: Export obligation = 6x duties, taxes and cess saved, within 6 years of authorisation, over and above average exports of previous 3 years; 25% lower specific EO if capital goods sourced in India; Zone: all IndiaEPCG authorisation online on DGFT portalDGFT (Regional Authority)FTP 2023 Chapter 5
Clause: para 5.01(a),(b),(d); 5.04(c),(d)
International Cooperation Scheme: Capacity Building of First Time MSE Exporters (CBFTE)
International Cooperation (IC) Scheme, Ministry of MSME
Certification refundreimbursement of RCMC registration-cum-membership fee, export insurance premium, testing and quality certification for first-time exportersmicro, smallany industryfirst-time MSE exporter; Zone: all Indiaic.msme.gov.in / EPCExport Promotion Councils / ECGC / NSICMinistry of MSME, 'Schemes for MSMEs' booklet (2025)
Clause: p.23 Sub-Component-II
International Cooperation Scheme: Market Development Assistance (trade fairs abroad)
International Cooperation (IC) Scheme, Ministry of MSME
Other supportup to ₹3 lakhmicro, small, mediumany industryparticipation through eligible organisation (Ministry bodies, govt organisations, registered industry associations); Zone: all Indiaic.msme.gov.inMinistry of MSME (ic.msme.gov.in) via associations/organisationsMinistry of MSME, 'Schemes for MSMEs' booklet (2025)
Clause: p.21-22 Sub-Component-I
MCGS-MSME: special provisions for exporters
MCGS-MSME (modified 21 Mar 2026)
Credit guaranteeLoan up to ₹20 cr · 75% guaranteedmicro, small, mediumany industryprofitable unit exporting at least 25% of turnover in each of previous 3 financial years; export realisation conditions; Zone: all Indiathrough the lending bankNCGTC via lending bankPIB, Ministry of Finance, 21 Mar 2026
Clause: Special provisions for exporters
MSME Competitive (LEAN) Scheme
MSME Champions Scheme
Other support90% of the eligible cost · up to ₹2.2 lakhmicro, small, mediumany industryUdyam; Lean pledge; certificate valid 3 years; Zone: all India; Status: Printed scheme validity: 31.03.2026 (MSME Champions Scheme period 2021-22 to 2025-26). Extension order not found on msme.gov.in / dcmsme.gov.in (checked 17 Oct 2026); lean.msme.gov.in portal shows MSME registration and login open (checked 17 Oct 2026).lean.msme.gov.inMinistry of MSME / QCI (lean.msme.gov.in)10 Mar 2023 to 31 Mar 2026MSME Competitive (LEAN) Scheme Guidelines, 07 Oct 2022
Clause: p.4 Scheme Validity; para 9.0 Financial Assistance (p.19)
MSME Innovative: Design intervention projects
MSME Champions Scheme (MSME Innovative)
Other support60%–75% by size of the eligible cost · up to ₹40 lakhmicro, small, mediumany industryUdyam; design project approved via implementing agency (e.g. NID, IITs); MSME deposits its share with IA; Zone: all India; Status: Printed scheme validity: 31.03.2026 (MSME Champions Scheme period 2021-22 to 2025-26). Extension order not found on msme.gov.in / dcmsme.gov.in (checked 17 Oct 2026); innovative.msme.gov.in portal is live and running MSME Idea Hackathon 6.0 (checked 17 Oct 2026).innovative.msme.gov.inMinistry of MSME (innovative.msme.gov.in)until 31 Mar 2026Ministry of MSME, 'Schemes for MSMEs' booklet (2025)
Clause: p.42 'Design Project'
MSME Innovative: IPR registration reimbursement
MSME Champions Scheme (MSME Innovative)
Other support100% of the eligible cost · up to ₹5 lakhmicro, small, mediumany industrymanufacturing MSME with Udyam; Zone: all India; Status: Printed scheme validity: 31.03.2026 (MSME Champions Scheme period 2021-22 to 2025-26). Extension order not found on msme.gov.in / dcmsme.gov.in (checked 17 Oct 2026); innovative.msme.gov.in portal is live with the IPR reimbursement section (checked 17 Oct 2026).innovative.msme.gov.inMinistry of MSME / IP Facilitation Centresuntil 31 Mar 2026Ministry of MSME, 'Schemes for MSMEs' booklet (2025)
Clause: p.43 IPR table
MSME Sustainable (ZED) Certification: subsidy on certification cost
MSME Champions Scheme (ZED guidelines 2022)
Certification refund50%–80% by size of the certification costmicro, small, mediumany industryUdyam; take ZED pledge; Zone: all India; +10% for SC/ST-owned or NER/Himalayan/LWE/island/aspirational districts; +5% for SFURTI/MSE-CDP; Status: Printed scheme validity: 31.03.2026 (MSME Champions Scheme period 2021-22 to 2025-26). Extension order not found on msme.gov.in / dcmsme.gov.in (checked 17 Oct 2026); Ministry of MSME press release of 04 Aug 2026 describes the scheme as operating.zed.msme.gov.inMinistry of MSME / QCI (zed.msme.gov.in)28 Apr 2022 to 31 Mar 2026ZED Certification Scheme Guidelines 2022
Clause: Scheme Validity; 3.4.4; 3.4.5
ZED: financial assistance for testing / system / product certification
MSME Champions Scheme (ZED)
Certification refund75% of the certification cost · up to ₹50,000micro, small, mediumany industryZED-certified MSME; Zone: all India; Status: Printed scheme validity: 31.03.2026 (MSME Champions Scheme period 2021-22 to 2025-26). Extension order not found on msme.gov.in / dcmsme.gov.in (checked 17 Oct 2026); Ministry of MSME press release of 04 Aug 2026 describes the scheme as operating.zed.msme.gov.inMinistry of MSME / QCI28 Apr 2022 to 31 Mar 2026PIB, Ministry of MSME, 04 Aug 2026
Clause: Background para: up to 75%, max Rs 50,000
ZED: handholding/consultancy and Zero Effect technology upgradation support
MSME Champions Scheme (ZED)
Capital subsidy50%–80% by size of the eligible cost · up to ₹5 lakhmicro, small, mediumany industryminimum Bronze certification; up to Rs 2 lakh consultancy + up to Rs 3 lakh for zero-effect solutions, pollution control, cleaner technology; on consultant recommendation, MSME-DI verification, PMAC approval; Zone: all India; +10% / +5% top-ups as for certification; Status: Printed scheme validity: 31.03.2026 (MSME Champions Scheme period 2021-22 to 2025-26). Extension order not found on msme.gov.in / dcmsme.gov.in (checked 17 Oct 2026); Ministry of MSME press release of 04 Aug 2026 describes the scheme as operating.zed.msme.gov.inMinistry of MSME / MSME-DI / QCI28 Apr 2022 to 31 Mar 2026ZED Certification Scheme Guidelines 2022
Clause: para 3.5 Handholding through Consultancy
Mutual Credit Guarantee Scheme for MSMEs (MCGS-MSME)
Ministry of Finance (DFS); Union Budget 2024-25
Credit guaranteeLoan up to ₹100 cr · 60% guaranteedmicro, small, mediumany industryUdyam; equipment/machinery at least 60% of project cost (21 Mar 2026; was 75%); loans up to Rs 50 cr: up to 8 years repayment incl. up to 2 years moratorium; guarantee expires after 10 years; Zone: all Indiathrough the lending bankNCGTC via lending bank/NBFC/AIFIPIB, Ministry of Finance, 29 Jan 2025
Clause: Salient Features
Prime Minister's Employment Generation Programme (PMEGP): margin money subsidy
Ministry of MSME (KVIC nodal)
Capital subsidymargin money subsidy 15%-35% of project cost; special categories (SC/ST/women/minorities/ex-servicemen/transgender/aspirational…microany industrymargin money subsidy 15%-35% of project cost; special categories (SC/ST/women/minorities/ex-servicemen/transgender/aspirational districts/NER) 35% rural, 25% urban; own contribution 10% (5% special); Zone: all India; higher rates for rural areas and special categorieskviconline.gov.in/pmegpeportalKVIC / KVIB / DIC via banksMinistry of MSME, 'Schemes for MSMEs' booklet 2025-26 (same file as dcmsme.gov.in/ebook/MSMESchemebooklet2025-26.pdf)
Clause: p.3-4 PMEGP
Self Reliant India (SRI) Fund: growth equity for MSMEs
Ministry of MSME; NSIC Venture Capital Fund Ltd
Other supportequity / quasi-equity via daughter funds (Category I/II AIFs); Govt of India contribution Rs 10,000 cr; fund life 15 yearsmicro, small, mediumany industryviable MSME with growth plan; through daughter fund; Zone: all Indianvcfl.co.inNVCFL via SEBI-registered daughter fundsMinistry of MSME, 'Schemes for MSMEs' booklet (2025)
Clause: p.48-49 SRI Fund
National SC-ST Hub: capital subsidy on plant & machinery
National SC-ST Hub Scheme, Ministry of MSME
Capital subsidy25% of plant and machinery · up to ₹25 lakhmicro, smallany industrySC/ST-owned enterprise; Zone: all Indiascsthub.in / NSICNSIC / Ministry of MSMEMinistry of MSME, 'Schemes for MSMEs' booklet (2025)
Clause: p.24 National SC-ST Hub
PMEGP 2nd loan for upgradation of existing PMEGP/REGP/MUDRA units
PMEGP, Ministry of MSME
Capital subsidy15% of the eligible cost · up to ₹15 lakhmicro, smallany industryexisting well-performing PMEGP/REGP/MUDRA unit; expansion, technology upgradation, automation; Zone: all India except NER and Hill Stateskviconline.gov.in/pmegpeportalKVIC via banksMinistry of MSME, 'Schemes for MSMEs' booklet 2025-26 (same file as dcmsme.gov.in/ebook/MSMESchemebooklet2025-26.pdf)
Clause: p.5, 1.1 2nd Loan: 'Maximum subsidy would be 15% of the project cost ... i.e. Rs. 15.00 lakhs in Non-NER'
PMEGP 2nd loan for upgradation of existing PMEGP/REGP/MUDRA units
PMEGP, Ministry of MSME
Capital subsidy20% of the eligible cost · up to ₹20 lakhmicro, smallany industryexisting well-performing PMEGP/REGP/MUDRA unit; expansion, technology upgradation, automation; Zone: NER and Hill Stateskviconline.gov.in/pmegpeportalKVIC via banksMinistry of MSME, 'Schemes for MSMEs' booklet 2025-26 (same file as dcmsme.gov.in/ebook/MSMESchemebooklet2025-26.pdf)
Clause: p.5, 1.1 2nd Loan: '(20%) for NER and Hill States ... Rs. 20.00 Lakh for NER and Hill States'
Emergency Credit Line Guarantee Scheme 5.0 (ECLGS 5.0)
Union Cabinet, 05 May 2026 (West Asia situation)
Credit guaranteeLoan up to ₹100 cr · 100% guaranteedmicro, small, medium, largeany industryexisting working capital limits with standard account as of 31 Mar 2026; cover 100% for MSMEs, 90% for non-MSMEs; Zone: all Indiathrough the existing lending bankNCGTC via lending bank5 May 2026 to 31 Mar 2027PIB, Cabinet, 05 May 2026
Clause: Salient features; Duration of the Scheme

Karnataka

23 measures
Karnataka: support measures for manufacturing plants
MeasureBenefitTerms as printedPlant sizeIndustryConditionsHow to applyNodal agencyValidSource and clause
Base subsidy for Large/Mega/Ultra Mega: capital expenditure subsidy
Karnataka Industrial Policy 2025-2030
Capital subsidy10%–25% by zone of fixed capital investmentlargeany industryLarge Rs 50-300 cr, Mega 300-1000 cr, Ultra Mega 1000+ cr; % of total value of fixed assets, 5 equal instalments after commercial production; minimum employment per Table (p.35); Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: section 5.1.1, Table 5 (p.34)
Base subsidy for Large/Mega/Ultra Mega: production-linked incentive
Karnataka Industrial Policy 2025-2030
Other support% of net sales turnover for 7 years from commercial production; capped at 60% of VFA (Z1, Z2) / 30% (Z3)largeany industry% of net sales turnover for 7 years from commercial production; capped at 60% of VFA (Z1, Z2) / 30% (Z3); Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: section 5.1.2, Table 6 (p.34)
Base subsidy for medium industries: capital subsidy
Karnataka Industrial Policy 2025-2030
Capital subsidy25% of fixed capital investment · up to ₹10 crmediumany industryZ1 25% of VFA (max Rs 10 cr), Z2 20% (max Rs 8 cr), Z3 10% (max Rs 4 cr); 4 annual instalments after commercial production; +5% (max Rs 50 lakh) most backward, +3% (max Rs 25 lakh) more backward taluks; Zone: Zone 1 taluks (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: base subsidy for medium industries, Capital Subsidy column (p.46): Zone 1
Base subsidy for medium industries: capital subsidy
Karnataka Industrial Policy 2025-2030
Capital subsidy20% of fixed capital investment · up to ₹8 crmediumany industryZ1 25% of VFA (max Rs 10 cr), Z2 20% (max Rs 8 cr), Z3 10% (max Rs 4 cr); 4 annual instalments after commercial production; +5% (max Rs 50 lakh) most backward, +3% (max Rs 25 lakh) more backward taluks; Zone: Zone 2 taluks (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: base subsidy for medium industries, Capital Subsidy column (p.46): Zone 2
Base subsidy for medium industries: capital subsidy
Karnataka Industrial Policy 2025-2030
Capital subsidy10% of fixed capital investment · up to ₹4 crmediumany industryZ1 25% of VFA (max Rs 10 cr), Z2 20% (max Rs 8 cr), Z3 10% (max Rs 4 cr); 4 annual instalments after commercial production; +5% (max Rs 50 lakh) most backward, +3% (max Rs 25 lakh) more backward taluks; Zone: Zone 3 - only Bengaluru Rural district (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: base subsidy for medium industries, Capital Subsidy column (p.46): Zone 3
Base subsidy for medium industries: production-linked incentive
Karnataka Industrial Policy 2025-2030
Other support% of net sales turnover for 7 years; capped at 60% of VFA (Z1, Z2) / 30% (Z3); +5% / +3% of cap in most / more backward taluksmediumany industry% of net sales turnover for 7 years; capped at 60% of VFA (Z1, Z2) / 30% (Z3); +5% / +3% of cap in most / more backward taluks; Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: base subsidy for medium industries (p.46)
Capital subsidy for micro industries
Karnataka Industrial Policy 2025-2030
Capital subsidy30% of fixed capital investment · up to ₹30 lakhmicroany industrygeneral: Z1 30% (max Rs 30 lakh), Z2 25% (25 lakh), Z3 10% (10 lakh); special category (SC/ST, women, minorities, PwD, ex-servicemen): 35%/35 lakh, 30%/30 lakh, 15%/15 lakh; 2 instalments; +5% (max Rs 5 lakh) most backward, +3% (max Rs 3 lakh) more backward taluks; Zone: Zone 1 taluks (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 21, capital subsidy for micro industries, General column (p.45): Zone 1
Capital subsidy for micro industries
Karnataka Industrial Policy 2025-2030
Capital subsidy25% of fixed capital investment · up to ₹25 lakhmicroany industrygeneral: Z1 30% (max Rs 30 lakh), Z2 25% (25 lakh), Z3 10% (10 lakh); special category (SC/ST, women, minorities, PwD, ex-servicemen): 35%/35 lakh, 30%/30 lakh, 15%/15 lakh; 2 instalments; +5% (max Rs 5 lakh) most backward, +3% (max Rs 3 lakh) more backward taluks; Zone: Zone 2 taluks (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 21, capital subsidy for micro industries, General column (p.45): Zone 2
Capital subsidy for micro industries
Karnataka Industrial Policy 2025-2030
Capital subsidy10% of fixed capital investment · up to ₹10 lakhmicroany industrygeneral: Z1 30% (max Rs 30 lakh), Z2 25% (25 lakh), Z3 10% (10 lakh); special category (SC/ST, women, minorities, PwD, ex-servicemen): 35%/35 lakh, 30%/30 lakh, 15%/15 lakh; 2 instalments; +5% (max Rs 5 lakh) most backward, +3% (max Rs 3 lakh) more backward taluks; Zone: Zone 3 - only Bengaluru Rural district (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 21, capital subsidy for micro industries, General column (p.45): Zone 3
Capital subsidy for recycling and waste-to-energy facilities
Karnataka Industrial Policy 2025-2030
Capital subsidy50% of fixed capital investment · up to ₹5 crmicro, small, medium, largeplastic, e-waste, biomedical waste recycling; waste-to-energyone-time capital subsidy up to 50% of facility cost, ceiling Rs 5 cr; Zone: all zonesKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: incentive to all enterprises (p.45)
Capital subsidy for small industries
Karnataka Industrial Policy 2025-2030
Capital subsidy25% of fixed capital investment · up to ₹2 crsmallany industrygeneral: Z1 25% (max Rs 200 lakh), Z2 20% (150 lakh), Z3 10% (50 lakh); special category: 30%/225 lakh, 25%/175 lakh, 15%/75 lakh; 2 instalments; +5% (max Rs 10 lakh) most backward, +3% (max Rs 5 lakh) more backward taluks; Zone: Zone 1 taluks (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 21, capital subsidy for small industries, General column (p.45-46): Zone 1
Capital subsidy for small industries
Karnataka Industrial Policy 2025-2030
Capital subsidy20% of fixed capital investment · up to ₹1.5 crsmallany industrygeneral: Z1 25% (max Rs 200 lakh), Z2 20% (150 lakh), Z3 10% (50 lakh); special category: 30%/225 lakh, 25%/175 lakh, 15%/75 lakh; 2 instalments; +5% (max Rs 10 lakh) most backward, +3% (max Rs 5 lakh) more backward taluks; Zone: Zone 2 taluks (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 21, capital subsidy for small industries, General column (p.45-46): Zone 2
Capital subsidy for small industries
Karnataka Industrial Policy 2025-2030
Capital subsidy10% of fixed capital investment · up to ₹50 lakhsmallany industrygeneral: Z1 25% (max Rs 200 lakh), Z2 20% (150 lakh), Z3 10% (50 lakh); special category: 30%/225 lakh, 25%/175 lakh, 15%/75 lakh; 2 instalments; +5% (max Rs 10 lakh) most backward, +3% (max Rs 5 lakh) more backward taluks; Zone: Zone 3 - only Bengaluru Rural district (Annexure 6, p.87-92); most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-ons (p.46 note)Karnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 21, capital subsidy for small industries, General column (p.45-46): Zone 3
Employment booster on base subsidy (Large and above)
Karnataka Industrial Policy 2025-2030
Employment and trainingextra % on capex subsidy / PLI amount when employment is 3x-4x, 4x-5x, >5x the minimum employment; +5% VFA limit if PLI chosenlargeany industryextra % on capex subsidy / PLI amount when employment is 3x-4x, 4x-5x, >5x the minimum employment; +5% VFA limit if PLI chosen; Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: employment booster table (p.36)
Export certification incentive
Karnataka Industrial Policy 2025-2030
Certification refund50% of the certification cost · up to ₹5 lakhmicro, small, mediumany industryCE, CCC, phyto-sanitary, IFS/BRC/FSSC 22000, SEDEX, GHP, GMP, GLP, HACCP or other recognised international certification; total cap Rs 5 lakh per entity; Zone: KarnatakaKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 24 Export Readiness Certification Support for MSMEs (p.49)
Green and sustainability incentives (Large and above)
Karnataka Industrial Policy 2025-2030
Capital subsidy50% of the eligible costlargeany industrycapped at 10% of VFA overall: ETP 50% up to Rs 2.5 cr; CETP/waste projects 50% up to Rs 5 cr; ZLD 50% up to Rs 1 cr; air pollution control 50% up to Rs 1 cr; energy efficiency certification 50% up to Rs 1 cr; electrification of thermal processes/BESS 50% up to Rs 1 cr; in-plant EVs 10% up to Rs 20 lakh; Zone: KarnatakaKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: section 5.6, Table 16 Sustainability initiatives linked incentives for large and above investments (p.42-43)
Green and sustainability incentives (MSME)
Karnataka Industrial Policy 2025-2030
Capital subsidy50% of the eligible cost · up to ₹50 lakhmicro, small, mediumany industrycapped at 10% of VFA: ETP/CETP/waste 50% up to Rs 50 lakh; ZLD 50% up to Rs 50 lakh; air pollution control 50% up to Rs 50 lakh; energy efficiency certification 50% up to Rs 50 lakh; thermal electrification/BESS 50% up to Rs 50 lakh; in-plant EVs 10% up to Rs 10 lakh; Zone: KarnatakaKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 17 Sustainability initiatives linked incentives for MSME investments (p.43)
Large and above: stamp duty exemption and concessional registration
Karnataka Industrial Policy 2025-2030
Stamp dutyloan agreements (first 5 years) and lease/sale deeds for plots in KIADB/KSSIDC/approved parks; registration Rs 1 per Rs 1,000 in Zones…largeany industryloan agreements (first 5 years) and lease/sale deeds for plots in KIADB/KSSIDC/approved parks; registration Rs 1 per Rs 1,000 in Zones 1-2; land conversion fee reimbursed 100% in Zones 1-2; Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: stamp duty / registration / land conversion (p.38-39)
Micro and small: power subsidy Rs 1 per unit
Karnataka Industrial Policy 2025-2030
Power tariff and electricity dutyreimbursement Rs 1.00 per unit consumed for 3 yearsmicro, smallany industryreimbursement Rs 1.00 per unit consumed for 3 years; Zone: Zones 1 and 2 onlyKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: power subsidy for micro and small (p.48)
MSME: exemption from tax on electricity tariff
Karnataka Industrial Policy 2025-2030
Power tariff and electricity duty100% of the eligible costmicro, small, mediumany industrygeneral: Z1 100% for 7 years, Z2 6 years, Z3 nil; special category: 8 / 7 / 4 years; Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: MSME electricity tax (p.48)
MSME: stamp duty exemption and concessional registration
Karnataka Industrial Policy 2025-2030
Stamp dutygeneral Z1/Z2 100%, Z3 nil; special category Z1/Z2 100%, Z3 75%; registration Rs 1 per Rs 1,000; land conversion fee reimbursement same…micro, small, mediumany industrygeneral Z1/Z2 100%, Z3 nil; special category Z1/Z2 100%, Z3 75%; registration Rs 1 per Rs 1,000; land conversion fee reimbursement same pattern; Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: MSME stamp duty / registration / land conversion (p.47-48)
Quality certification incentive
Karnataka Industrial Policy 2025-2030
Certification refund50% of the certification cost · up to ₹5 lakhmicro, small, mediumany industryISO, BIS, FSSAI, AGMARK, ECOMARK, ZED, ISI, FPO, BEE or other recognised certification; 50% of application cost, total cap Rs 5 lakh per entity; Zone: KarnatakaKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: Table 23 Quality Certification Support for MSMEs (p.48)
Women workforce booster on base subsidy (Large and above)
Karnataka Industrial Policy 2025-2030
Employment and trainingextra % on capex subsidy / PLI when women are 50%+, 60%+, 70%+ of workforcelargeany industryextra % on capex subsidy / PLI when women are 50%+, 60%+, 70%+ of workforce; Zone: Zones 1 / 2 / 3 by taluk (Annexure 6, p.87-92); Zone 3 incentives only in Bengaluru Rural district; most-backward / more-backward taluks per Dr D.M. Nanjundappa Committee get add-onsKarnataka single window (Know Your Incentives / CAF)Commerce & Industries Dept, Karnataka / Karnataka Udyog Mitra / DICKarnataka Industrial Policy 2025-2030 (Commerce & Industries Dept, print edition)
Clause: women participation booster table (p.37)

Maharashtra

26 measures
Maharashtra: support measures for manufacturing plants
MeasureBenefitTerms as printedPlant sizeIndustryConditionsHow to applyNodal agencyValidSource and clause
MSME: Capital subsidy for export-oriented, circular-economy and women/SC/ST/PwD-owned units
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy20% of plant and machinery · up to ₹25 crmicro, small, medium, largeEOU (>=50% exports); circular economy (>=50% recycled inputs, ISO 14021 / EN 15343); units fully owned by women/SC/ST/PwD with >=50% women employeeseligible base: 50% of plant & machinery investment; subsidy up to Rs 25 cr or 20% of eligible FCI, whichever lower; max Rs 5 cr per year in equal instalments over 5 years; lapses for years when conditions not met; Zone: Taluka class Aonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) Table 4 (PDF p.59) + 'Capital subsidy' (PDF p.60)
MSME: Capital subsidy for export-oriented, circular-economy and women/SC/ST/PwD-owned units
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy20% of plant and machinery · up to ₹25 crmicro, small, medium, largeEOU (>=50% exports); circular economy (>=50% recycled inputs, ISO 14021 / EN 15343); units fully owned by women/SC/ST/PwD with >=50% women employeeseligible base: 50% of plant & machinery investment; subsidy up to Rs 25 cr or 20% of eligible FCI, whichever lower; max Rs 5 cr per year in equal instalments over 7 years; lapses for years when conditions not met; Zone: Taluka class Bonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) Table 4 (PDF p.59) + 'Capital subsidy' (PDF p.60)
MSME: Capital subsidy for export-oriented, circular-economy and women/SC/ST/PwD-owned units
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy20% of plant and machinery · up to ₹25 crmicro, small, medium, largeEOU (>=50% exports); circular economy (>=50% recycled inputs, ISO 14021 / EN 15343); units fully owned by women/SC/ST/PwD with >=50% women employeeseligible base: 80% of plant & machinery investment; subsidy up to Rs 25 cr or 20% of eligible FCI, whichever lower; max Rs 5 cr per year in equal instalments over 7 years; lapses for years when conditions not met; Zone: Taluka class Conline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) Table 4 (PDF p.59) + 'Capital subsidy' (PDF p.60)
MSME: Capital subsidy for export-oriented, circular-economy and women/SC/ST/PwD-owned units
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy20% of fixed capital investment · up to ₹25 crmicro, small, medium, largeEOU (>=50% exports); circular economy (>=50% recycled inputs, ISO 14021 / EN 15343); units fully owned by women/SC/ST/PwD with >=50% women employeeseligible base: 100% of land, building and plant & machinery investment; subsidy up to Rs 25 cr or 20% of eligible FCI, whichever lower; max Rs 5 cr per year in equal instalments over 10 years; lapses for years when conditions not met; Zone: Taluka classes D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) Table 4 (PDF p.59) + 'Capital subsidy' (PDF p.60)
MSME: Credit rating incentive
Maharashtra Industries, Investment and Services Policy 2025
Other support50% of the eligible cost · up to ₹1 lakhmicro, small, mediumany industryrating by SIDBI or Govt-recognised rating agency; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), item 4 (PDF p.61)
MSME: Electricity duty exemption
Maharashtra Industries, Investment and Services Policy 2025
Power tariff and electricity duty100% of the eligible costmicro, small, mediumany industryC, D, D+ and lower: for incentive period; A, B: only EOUs with 50% export turnover (DGFT-certified) and units fully owned by women/SC/ST/PwD employing 50% such workers; orders under Electricity Duty Act 1958 issued separately by Energy Dept; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'Electricity duty' (PDF p.60)
MSME: Employment-linked subsidy (EPF reimbursement)
Maharashtra Industries, Investment and Services Policy 2025
Employment and training50% of the employer's EPF · up to ₹5 cr a yearmicro, small, mediumany industryemployment factor > 20 direct jobs per Rs 1 cr investment: 50% of employer EPF contribution for 5 years; max Rs 5 cr per unit per year; Zone: D, D+ and lower talukasonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'ELS' (PDF p.60)
MSME: Energy and water audit incentive
Maharashtra Industries, Investment and Services Policy 2025
Other support50% of the eligible cost · up to ₹2 lakhmicro, small, mediumany industrywater audit 50% up to Rs 1 lakh; energy audit 50% up to Rs 2 lakh, per unit; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), item 2 (PDF p.61)
MSME: Energy efficiency equipment incentive
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy50% of the eligible cost · up to ₹5 lakhmicro, small, mediumany industryadditional capital equipment for energy efficiency; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), item 3 (PDF p.61)
MSME: Industrial Promotion Subsidy (IPS) - 100% of SGST on first sale
Maharashtra Industries, Investment and Services Policy 2025
Tax reimbursement100% of SGST paidmicro, small, medium, largeany industrySGST on first sale of eligible products billed and dispatched in Maharashtra; total incentives capped at % of eligible fixed capital investment by taluka: A 30% (5 yrs), B 40% (7), C 50% (7), D 60% (10), D+ 70% (10), Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule 80% (10), no-industry/Naxal/aspirational 100% (10); max FCI Rs 125 cr (Table 4); large units below Special LSI threshold get MSME incentives; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), Table 4 (PDF p.59)
MSME: Interest subsidy
Maharashtra Industries, Investment and Services Policy 2025
Interest subsidy5% a year on the term loan · up to ₹1 cr a yearmicro, small, mediumany industryunit must itself bear at least 5% interest p.a.; max Rs 1 cr per year; Zone: Taluka class Aonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'Interest subsidy' (PDF p.60); period Table 4 (PDF p.59)
MSME: Interest subsidy
Maharashtra Industries, Investment and Services Policy 2025
Interest subsidy5% a year on the term loan · up to ₹1 cr a yearmicro, small, mediumany industryunit must itself bear at least 5% interest p.a.; max Rs 1 cr per year; Zone: Taluka classes B and Conline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'Interest subsidy' (PDF p.60); period Table 4 (PDF p.59)
MSME: Interest subsidy
Maharashtra Industries, Investment and Services Policy 2025
Interest subsidy5% a year on the term loan · up to ₹1 cr a yearmicro, small, mediumany industryunit must itself bear at least 5% interest p.a.; max Rs 1 cr per year; Zone: Taluka classes D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districtsonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'Interest subsidy' (PDF p.60); period Table 4 (PDF p.59)
MSME: One-time growth grant on moving up a category
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy50% of fixed capital investment · up to ₹25 lakhmicro, small, mediumany industry50% of additional fixed capital investment: micro->small up to Rs 5 lakh; small->medium up to Rs 10 lakh; medium->large up to Rs 25 lakh; first 25,000 eligible units only; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'One-time growth grant' (PDF p.61)
MSME: Patent and IP registration cost refund
Maharashtra Industries, Investment and Services Policy 2025
Other supportup to ₹10 lakhmicro, small, mediumany industryunits set up during policy period; domestic patent/copyright/trademark/GI up to Rs 2 lakh; international up to Rs 10 lakh; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), item 8 (PDF p.61)
MSME: Power tariff subsidy Rs 1 per unit
Maharashtra Industries, Investment and Services Policy 2025
Power tariff and electricity dutyup to ₹1 crmicro, small, mediumany industryRs 1 per unit for 3 years, up to Rs 1 cr; Zone: D, D+ and lower talukasonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'Power tariff subsidy' (PDF p.60)
MSME: Production-linked incentive for export-oriented units
Maharashtra Industries, Investment and Services Policy 2025
Other supportup to ₹1 cr a yearmicro, small, mediumEOUs (100% or >50% exports)1.5% (100% EOU) / 1% (>50% EOU) of incremental turnover for 5 years; total up to 10% of FCI; MSME max Rs 1 cr per year; only for units not taking IPS (SGST); Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'PLI' (PDF p.60-61)
MSME: Quality certification incentive
Maharashtra Industries, Investment and Services Policy 2025
Certification refund75% of the certification cost · up to ₹5 crmicro, small, mediumany industry75% of certification cost; GMP and Hallmark up to Rs 1 lakh; patent and GI registration up to Rs 2 lakh; 50% for national/international certification of independent R&D projects; overall up to Rs 5 cr in investment period; CA-certified; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), item 7 (PDF p.61)
MSME: SME exchange listing cost reimbursement
Maharashtra Industries, Investment and Services Policy 2025
Other support50% of the eligible cost · up to ₹5 lakhmicro, small, mediumany industryCA-certified listing cost; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), item 5 (PDF p.61)
MSME: Special category incentive (+10% of P&M investment)
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy10% of plant and machinerymicro, small, mediumany industryone of: fully owned by women/SC/ST/PwD with >=50% such employees; unit in D, D+ or lower talukas or emerging districts; priority sector with >=10 direct jobs per Rs 1 cr; total incentives within 120% of FCI; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'Special category incentives' (PDF p.62)
MSME: Stamp duty exemption
Maharashtra Industries, Investment and Services Policy 2025
Stamp dutyC, D, D+ and lower: 100%; A, B: 50% on first lease/transfer deed for land or term loanmicro, small, mediumany industryC, D, D+ and lower: 100%; A, B: 50% on first lease/transfer deed for land or term loan; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a) 'Stamp duty' (PDF p.60)
MSME: Technology upgradation assistance
Maharashtra Industries, Investment and Services Policy 2025
Capital subsidy50% of plant and machinery · up to ₹25 lakhmicro, small, mediumany industryadditional capital equipment for technology upgradation; over 5 years; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), performance incentives item 1 (PDF p.61)
MSME: ZED certification fee refund
Maharashtra Industries, Investment and Services Policy 2025
Certification refund50% of the certification cost · up to ₹50,000micro, small, mediumany industryUdyam-registered; fee paid for ZED certification; Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(a), item 9 (PDF p.61)
Special Large Industries: Employment-linked subsidy (EPF reimbursement)
Maharashtra Industries, Investment and Services Policy 2025
Employment and training50% of the employer's EPF · up to ₹10 cr a yearlargeany industryemployment factor > 20 jobs per Rs 1 cr: 50% of employer EPF for 5 years; max Rs 10 cr per unit per year; stamp duty (100% C/D/D+, 50% A/B) and electricity duty exemption also apply; Zone: D, D+ and lower talukasonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(b) (PDF p.63)
Special Large Industries: Industrial Promotion Subsidy - 100% of SGST
Maharashtra Industries, Investment and Services Policy 2025
Tax reimbursement100% of SGST paidlargeany industrySpecial LSI thresholds (FCI Rs cr / jobs, cap % of FCI, years): A,B 750/1000, 40%, 7; C 500/750, 50%, 7; D 350/500, 60%, 7; D+ 250/200, 80%, 7; Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule 200/150, 90%, 9; no-industry/Naxal/aspirational 150/125, 100%, 9 (investment OR jobs); Zone: taluka classes A, B, C, D, D+, Vidarbha/Marathwada/Ratnagiri/Sindhudurg/Jalgaon/Dhule, no-industry districts / Naxal-affected / aspirational districts (Dharashiv, Gadchiroli, Washim, Nandurbar)online via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(b), Table 5 (PDF p.62-63)
Special Large Industries: Power tariff subsidy Rs 1 per unit
Maharashtra Industries, Investment and Services Policy 2025
Power tariff and electricity dutyup to ₹1.5 crlargeany industryRs 1 per unit for 3 years, up to Rs 1.5 cr; Zone: D, D+ and lower talukasonline via MAITRI single window / Directorate of IndustriesDirectorate of Industries / Department of Industries, Investment and Services, Maharashtra31 Dec 2025 to 30 Dec 2030Maharashtra Industries, Investment and Services Policy 2025, GR MAUDHO-2023/PK187/Udyog-2 dt 31.12.2025 (Marathi)
Clause: para 4.1.1(b) (PDF p.63)

Tamil Nadu

39 measures
Tamil Nadu: support measures for manufacturing plants
MeasureBenefitTerms as printedPlant sizeIndustryConditionsHow to applyNodal agencyValidSource and clause
MSME Policy 2021: Additional capital subsidy for cleaner and environment-friendly technologies
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy25% of plant and machinery · up to ₹10 lakhmicro, small, mediumany industryTamil Nadu Pollution Control Board certificate that equipment leads to cleaner production; Zone: micro: anywhere; small/medium: 254 industrially backward blocks (Annexure I, para 5.6) and industrial estates, excluding industrial estates within 50 km of Chennai city centre; also Agro-based and Food Processing small/medium enterprises in any of the 388 blocks in the Stateonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 7.5.1-7.5.3
MSME Policy 2021: Additional capital subsidy for micro manufacturing enterprises
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy10% of plant and machinery · up to ₹5 lakhmicroany industryUdyam; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 7.3.1-7.3.4
MSME Policy 2021: Additional capital subsidy for scaling up
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy5% of plant and machinery · up to ₹25 lakhmicro, smallany industryexisting micro/small graduating to a higher category by installing additional plant and machinery; once per category; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 7.6.1-7.6.4
MSME Policy 2021: Additional capital subsidy for women / SC / ST / differently abled / transgender entrepreneurs
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy5% of plant and machinery · up to ₹5 lakhmicro, small, mediumany industrycertificate/ID of the category; Zone: micro: anywhere; small/medium: 254 industrially backward blocks (Annexure I, para 5.6) and industrial estates, excluding industrial estates within 50 km of Chennai city centre; also Agro-based and Food Processing small/medium enterprises in any of the 388 blocks in the Stateonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 7.4.1-7.4.3
MSME Policy 2021: Assistance for listing on SME Exchange
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Other support20% of the eligible cost · up to ₹5 lakhsmall, mediumany industrysuccessful listing on NSE/BSE SME platform; apply within 6 months; merchant banker, due diligence, RTA, audit, exchange and listing fees; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: ch.17, para 17.1-17.5
MSME Policy 2021: Back-ended interest subsidy for technology upgradation
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Interest subsidy5% a year on the term loan · up to ₹25 lakhmicro, smallany industryupgrade of existing plant and machinery; prompt repayment; reimbursed quarterly to lender; Zone: anywhere in Tamil Naduthrough lender and DICTIIC / SIDBI / GM DIC (by lender)G.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 11.1-11.4
MSME Policy 2021: Back-ended interest subsidy on CGTMSE loans
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Interest subsidy5% a year on the term loan · up to ₹20 lakhmicro, smallany industryterm loan under CGTMSE; prompt repayment; Zone: anywhere in Tamil Naduthrough lender and DICTIIC / SIDBI / GM DIC (by lender)G.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 11.1-11.2
MSME Policy 2021: Capital Subsidy for micro manufacturing enterprises
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy25% of plant and machinery · up to ₹25 lakhmicroany industryUdyam; micro unit that grows to small/medium on expansion keeps 25% up to Rs 25 lakh if ineligible under 7.2; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 7.1.1-7.1.4
MSME Policy 2021: Capital Subsidy for small and medium manufacturing enterprises
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy25% of plant and machinery · up to ₹1.5 crsmall, mediumany industryUdyam; manufacturing only; Zone: 254 industrially backward blocks (Annexure I, para 5.6) and industrial estates, excluding industrial estates within 50 km of Chennai city centre; also Agro-based and Food Processing small/medium enterprises in any of the 388 blocks in the Stateonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 7.2.1-7.2.4; 5.6
MSME Policy 2021: Generator subsidy
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy25% of the eligible cost · up to ₹5 lakhmicroany industrynew generator up to 320 kVA; Electrical Inspectorate safety certificate; apply within 6 months of purchase; Zone: units on rural feederonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: ch.12, para 12.1-12.6
MSME Policy 2021: Low Tension Power Tariff subsidy
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Power tariff and electricity duty20% of the eligible costmicroany industryLT power (Tariff III); 20% of power charges paid to TANGEDCO for first 36 months; apply within 3 months of production/power connection; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: ch.10, para 10.1-10.5
MSME Policy 2021: PEACE - incentive for implementing energy audit recommendations
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy50% of the eligible cost · up to ₹10 lakhmicro, small, mediumany industryat least 10% saving in specific energy consumption vs 12-month average; technology, replacement, retrofit costs after audit; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 13.6.1-13.6.6, 13.7
MSME Policy 2021: PEACE - subsidy on detailed energy audit
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Other support75% of the eligible cost · up to ₹1 lakhmicro, small, mediumany industryfirst energy audit or after 3 years; BEE-empanelled/accredited auditor; per unit; claim within 1 year; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: para 13.5.3-13.5.9
MSME Policy 2021: Reimbursement of stamp duty and registration charges
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Stamp duty50% of the eligible costmicro, smallany industryland for industrial use up to 5x plinth area; apply within 6 months of commercial production; Zone: declared backward blocksonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: ch.15, para 15.1-15.4
MSME Policy 2021: Scheme for Acquiring Quality Certifications (Q-CERT)
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Certification refund100% of the certification cost · up to ₹10 lakhmicro, small, mediumany industryISO 9000/14001/22000, HACCP, GHP/GMP, BIS, ZED or certification required by importing countries; cap Rs 2 lakh national / Rs 10 lakh international; renewals and statutorily mandatory certifications not eligible; apply within 1 year; Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: ch.14, para 14.1-14.5
MSME Policy 2021: Special Capital Subsidy for thrust sector enterprises
TN MSME Policy 2021 (G.O.(Ms) No.11 MSME Dept, 16.02.2021); guidelines G.O.(Ms) No.37, 06.07.2021
Capital subsidy25% of plant and machinery · up to ₹1.5 crmicro, small, mediumElectrical and electronics;Leather;Auto parts and components;Drugs and pharmaceuticals;Solar energy equipment;Gold and diamond jewellery for exports;Pollution control equipment;Sports goods;Cost-effective building materials;Readymade garments;Food processing;Plastic (except single-use);Rubber;Alternatives to single-use plastics;EV components and charging;Medical devices;Technical and medical textiles;Aerospace and defence;ESDM;Biotechnology;Petrochemicals and speciality chemicals;Industry 4.0;E-waste processingUdyam; not in Annexure IV; electrical/electronic items need ISI or ISO 9001; auto parts need ISO 9001/IATF 16949 (para 8.5); subsidy up to Rs 50 lakh in one instalment, above in 3 instalments (para 5.16.2); Zone: anywhere in Tamil Naduonline on Commissionerate of Industries and Commerce portal (para 5.7)Commissionerate of Industries and Commerce, Tamil Nadu / GM, District Industries CentreG.O.(Ms) No.37 MSME Dept, 06.07.2021 (guidelines, MSME Policy 2021)
Clause: ch.8: para 8.1-8.5
Textile Policy 2025-26: Capital subsidy for expansion/modernisation of textile processing units
TN New Integrated Textile Policy 2025-26
Capital subsidy25% of fixed capital investment · up to ₹4 crmicro, small, medium, largeTextile processing and IETPsper unit; Zone: Tamil Naduas per guidelines to be issued under the policy (para 3, Operational period)Department of Handlooms and Textiles, Tamil NaduTN New Integrated Textile Policy 2025-26
Clause: para 4.4 (ii) (p.25)
Textile Policy 2025-26: Capital subsidy for new textile processing units
TN New Integrated Textile Policy 2025-26
Capital subsidy25% of fixed capital investment · up to ₹5 crmicro, small, medium, largeTextile processing (dyeing, printing, finishing) and IETPsper unit; Zone: Tamil Naduas per guidelines to be issued under the policy (para 3, Operational period)Department of Handlooms and Textiles, Tamil NaduTN New Integrated Textile Policy 2025-26
Clause: para 4.4 (i) (p.25)
Textile Policy 2025-26: Energy and water conservation equipment
TN New Integrated Textile Policy 2025-26
Capital subsidy25% of the eligible cost · up to ₹10 lakhmicro, small, medium, largeTextile and apparel value chainequipment recommended by the resource efficiency audit; Zone: Tamil Naduas per guidelines to be issued under the policy (para 3, Operational period)Department of Handlooms and Textiles, Tamil NaduTN New Integrated Textile Policy 2025-26
Clause: para 4.7 (ii) (p.28)
Textile Policy 2025-26: Interest subvention for replacing old spinning capacity
TN New Integrated Textile Policy 2025-26
Interest subsidy6% a year on the term loanmicro, small, medium, largeSpinning (ring, open-end, air-jet)replacement of 15+ year old spindle capacity; Rs 500 cr outlay over 10 years split by machine type; Zone: Tamil Naduas per guidelines to be issued under the policy (para 3, Operational period)Department of Handlooms and Textiles, Tamil NaduTN New Integrated Textile Policy 2025-26
Clause: para 4.1 Spinning Sector (PDF p.16, printed p.10)
Textile Policy 2025-26: Resource efficiency walkthrough audit
TN New Integrated Textile Policy 2025-26
Other support50% of the eligible cost · up to ₹3 lakhmicro, small, medium, largeTextile and apparel value chainenergy, water, chemicals, waste, wastewater assessment; Zone: Tamil Naduas per guidelines to be issued under the policy (para 3, Operational period)Department of Handlooms and Textiles, Tamil NaduTN New Integrated Textile Policy 2025-26
Clause: para 4.7 (i) (p.28)
Textile Policy 2025-26: Special capital subsidy for technical textiles, recycled MMF yarn and MMF fabric
TN New Integrated Textile Policy 2025-26
Capital subsidy25% of fixed capital investmentmedium, largeTechnical textiles;MMF yarn from recycled materials;MMF fabrictechnical textiles / recycled MMF yarn: Rs 50 cr + 50 jobs; MMF fabric: Rs 100 cr + 50 jobs; 4-year investment period; disbursed in equal annual instalments over 10 years; Zone: B and C category districts only (TNIP 2021 para 12.1.3) for technical textiles, recycled MMF yarn and MMF fabricas per guidelines to be issued under the policy (para 3, Operational period)Department of Handlooms and Textiles, Tamil NaduTN New Integrated Textile Policy 2025-26
Clause: para 5.3.1-5.3.2 (p.33-35)
Circular Economy Investment Policy 2026: capital subsidy for recycling facilities
Tamil Nadu Circular Economy Investment Policy 2026
Capital subsidy10% of fixed capital investment · up to ₹3 crsmall, medium, largerecycling / recovery / upcycling of eligible waste streamsRs 20 cr EFA within 2 years from 01.07.2024; 25 new hires; >=50% revenue from recycled materials (in-house unit) or >80% (stand-alone); land capped at 20% of EFA; Zone: Tamil Naduper policy implementation guidelinesIndustries, Investment Promotion and Commerce Department, Tamil NaduTN Circular Economy Investment Policy 2026
Clause: section 5.1 (p.16-17)
TNIP 2021: 100% SGST reimbursement on final products (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Tax reimbursement100% of SGST paidlargeany industryfinal products sold in the State with traceable end-use; base volume principle for expansion; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.1.1
TNIP 2021: Electricity tax exemption (Sub-Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Power tariff and electricity duty100% of the eligible costmedium, largeany industrynew or expansion manufacturing; power from TANGEDCO or captive; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.5.1; 19.2
TNIP 2021: Fixed Capital Subsidy for Large and above projects
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Capital subsidy10%–20% by zone of fixed capital investmentlargeany industryLarge Rs 300-500 cr + 150 jobs (B, C districts only); Mega Rs 500-5000 cr + 400 jobs; Ultra-Mega > Rs 5000 cr + 2000 jobs; disbursed over 10/12/15 years; Large in A district: back-ended fixed capital subsidy Rs 1 cr instead of % (13.1.2); Zone: "A" Category Districts: Chengalpattu, Chennai, Kancheepuram, Tiruvallur (TNIP 2021 para 12.1.3); Large projects not eligible for % FCS in A (back-ended Rs 1 cr instead)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.1.2, Fixed Capital Subsidy table, row 'A District'; disbursal 10 yrs (Mega), 15 yrs (Ultra-Mega)
TNIP 2021: Fixed Capital Subsidy for Large and above projects
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Capital subsidy10%–22% by zone of fixed capital investmentlargeany industryLarge Rs 300-500 cr + 150 jobs (B, C districts only); Mega Rs 500-5000 cr + 400 jobs; Ultra-Mega > Rs 5000 cr + 2000 jobs; disbursed over 10/12/15 years; Large in A district: back-ended fixed capital subsidy Rs 1 cr instead of % (13.1.2); Zone: "B" Category Districts: Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore (TNIP 2021 para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.1.2, Fixed Capital Subsidy table, row 'B District'; disbursal 10 yrs (Large), 12 yrs (Mega), 15 yrs (Ultra-Mega)
TNIP 2021: Fixed Capital Subsidy for Large and above projects
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Capital subsidy12%–25% by zone of fixed capital investmentlargeany industryLarge Rs 300-500 cr + 150 jobs (B, C districts only); Mega Rs 500-5000 cr + 400 jobs; Ultra-Mega > Rs 5000 cr + 2000 jobs; disbursed over 10/12/15 years; Large in A district: back-ended fixed capital subsidy Rs 1 cr instead of % (13.1.2); Zone: "C" Category Districts: the other 22 districts (TNIP 2021 para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.1.2, Fixed Capital Subsidy table, row 'C District'; disbursal 10 yrs (Large), 12 yrs (Mega), 15 yrs (Ultra-Mega)
TNIP 2021: Green industry incentive (Sub-Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Capital subsidy25% of the eligible cost · up to ₹1 crmedium, largeany industrywaste/water recycling, ZLD, rainwater harvesting, IoT water solutions, in-plant EVs, green buildings (IGBC/LEED/GRIHA), pollution control devices; online monitoring where applicable; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.5.3; 19.4
TNIP 2021: Intellectual property creation incentive (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Other support50% of the eligible cost · up to ₹30 lakhlargeany industrypatent, copyright, trademark, GI registration; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.5.5
TNIP 2021: Land cost incentive in SIPCOT parks (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Land10% of the eligible costlargeany industryconcession on SIPCOT land cost for land up to 20% of EFA; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: "A" Category Districts: Chengalpattu, Chennai, Kancheepuram, Tiruvallur (para 12.1.3); SIPCOT landonline application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.3
TNIP 2021: Land cost incentive in SIPCOT parks (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Land10% of the eligible costlargeany industryconcession on SIPCOT land cost for land up to 20% of EFA; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: "B" Category Districts: Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore (para 12.1.3); SIPCOT landonline application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.3
TNIP 2021: Land cost incentive in SIPCOT parks (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Land50% of the eligible costlargeany industryconcession on SIPCOT land cost for land up to 20% of EFA; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: "C" Category Districts: the other 22 districts (para 12.1.3); SIPCOT landonline application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.3
TNIP 2021: Quality certification incentive (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Certification refund50% of the certification cost · up to ₹25 lakhlargeany industryISO, ISI, BIS, FPO, BEE, AGMARK, ECOMARK or other national/international certification; CA-certified cost; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.5.4
TNIP 2021: Refund of input SGST on capital goods under inverted duty structure (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Tax reimbursement100% of SGST paidlargeany industryunable to use or get refund of ITC on capital goods due to inverted tax structure; refunded in 5 equal annual instalments; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.6
TNIP 2021: Stamp duty concession (Sub-Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Stamp duty50% of the eligible costmedium, largeany industrylease or purchase of land/shed/buildings for industrial use; Zone: SIPCOT/SIDCO parks (Sub-Large); Large+: 50% in SIPCOT parks in A/B, 100% in SIPCOT/SIPCOT JV/SIDCO parks in C districtsonline application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.5.2; 19.3
TNIP 2021: Standard incentives for Sub-Large projects - capital subsidy
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Capital subsidyup to ₹1 crmedium, largeany industryinvestment Rs 50-300 cr in eligible fixed assets within 4 years; at least 50 employees; manufacturing / manufacturing services; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 12.1.1, Table 1, para 19.1
TNIP 2021: Sub-Large projects in C districts - fixed capital subsidy 5% of EFA
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Capital subsidy5% of fixed capital investmentmedium, largeany industryas for Sub-Large; disbursed in equal annual instalments over 5 years; Zone: C category districts only. District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 19.1
TNIP 2021: Training subsidy (Large and above)
Tamil Nadu Industrial Policy 2021 (TNIP 2021), validity extended to 31.12.2026 by G.O.(Ms) No.74, 27.06.2025
Employment and trainingup to ₹36,000largeany industryresidents of Tamil Nadu; Structured Package (para 13) applies to Mega/Ultra-Mega in A districts and Large/Mega/Ultra-Mega in B and C districts - Large (Rs 300-500 cr) in A districts not eligible; Zone: District categories: A = Chengalpattu, Chennai, Kancheepuram, Tiruvallur; B = Coimbatore, Erode, Karur, Krishnagiri, Namakkal, The Nilgiris, Ranipet, Salem, Tiruchirappalli, Tirupattur, Tiruppur, Vellore; C = other 22 districts (para 12.1.3)online application to SIPCOT (Sub-Large) / Guidance TN (Large and above) (para 20)SIPCOT (implementing and disbursal agency); Guidance Tamil Nadu1 Jan 2021 to 31 Dec 2026Tamil Nadu Industrial Policy 2021
Clause: para 13.2

Uttar Pradesh

21 measures
Uttar Pradesh: support measures for manufacturing plants
MeasureBenefitTerms as printedPlant sizeIndustryConditionsHow to applyNodal agencyValidSource and clause
IIEPP 2022: Capital subsidy option (Large and above)
UP IIEPP 2022
Capital subsidy10% of fixed capital investment · up to ₹5 cr a yearlargeany industry% of eligible capital investment (ECI): Large 10% (GBN, Ghaziabad) / 12% (Madhyanchal, Paschimanchal) / 15% (Bundelkhand, Purvanchal) over 10 years, annual ceiling Rs 5 cr; Mega 18/20/22% over 12 years, ceiling Rs 10 cr; scaled by capacity utilisation multiple (GCM); Zone: Gautam Buddh Nagar and Ghaziabad districtsNivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.1, Table 3 (PDF p.38): Large, GBN & Ghaziabad 10% of ECI over 10 years, Annual Ceiling Rs 5 Cr; Large = above Rs 50 cr, below Rs 200 cr (PDF p.37)
IIEPP 2022: Capital subsidy option (Large and above)
UP IIEPP 2022
Capital subsidy12% of fixed capital investment · up to ₹5 cr a yearlargeany industry% of eligible capital investment (ECI): Large 10% (GBN, Ghaziabad) / 12% (Madhyanchal, Paschimanchal) / 15% (Bundelkhand, Purvanchal) over 10 years, annual ceiling Rs 5 cr; Mega 18/20/22% over 12 years, ceiling Rs 10 cr; scaled by capacity utilisation multiple (GCM); Zone: Madhyanchal and Paschimanchal (except Gautam Buddh Nagar and Ghaziabad)Nivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.1, Table 3 (PDF p.38): Large, Madhyanchal & Paschimanchal 12% of ECI over 10 years, Annual Ceiling Rs 5 Cr
IIEPP 2022: Capital subsidy option (Large and above)
UP IIEPP 2022
Capital subsidy15% of fixed capital investment · up to ₹5 cr a yearlargeany industry% of eligible capital investment (ECI): Large 10% (GBN, Ghaziabad) / 12% (Madhyanchal, Paschimanchal) / 15% (Bundelkhand, Purvanchal) over 10 years, annual ceiling Rs 5 cr; Mega 18/20/22% over 12 years, ceiling Rs 10 cr; scaled by capacity utilisation multiple (GCM); Zone: Bundelkhand and PoorvanchalNivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.1, Table 3 (PDF p.38): Large, Bundelkhand & Poorvanchal 15% of ECI over 10 years, Annual Ceiling Rs 5 Cr
IIEPP 2022: Capital subsidy option (Large and above)
UP IIEPP 2022
Capital subsidy18% of fixed capital investment · up to ₹10 cr a yearlargeany industryMega (Rs 200 cr or above but below Rs 500 cr); % of ECI x GCM in 12 annual instalments; annual ceiling Rs 10 cr, Rs 15 cr with boosters; Zone: Gautam Buddh Nagar and Ghaziabad districtsNivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.1, Table 3 (PDF p.38): Mega, GBN & Ghaziabad 18% of ECI over 12 years, Annual Ceiling Rs 10 Cr (Rs 15 Cr with boosters); Mega = Rs 200 cr to below Rs 500 cr (PDF p.37)
IIEPP 2022: Capital subsidy option (Large and above)
UP IIEPP 2022
Capital subsidy20% of fixed capital investment · up to ₹10 cr a yearlargeany industryMega (Rs 200 cr or above but below Rs 500 cr); % of ECI x GCM in 12 annual instalments; annual ceiling Rs 10 cr, Rs 15 cr with boosters; Zone: Madhyanchal and Paschimanchal (except Gautam Buddh Nagar and Ghaziabad)Nivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.1, Table 3 (PDF p.38): Mega, Madhyanchal & Paschimanchal 20% of ECI over 12 years, Annual Ceiling Rs 10 Cr
IIEPP 2022: Capital subsidy option (Large and above)
UP IIEPP 2022
Capital subsidy22% of fixed capital investment · up to ₹10 cr a yearlargeany industryMega (Rs 200 cr or above but below Rs 500 cr); % of ECI x GCM in 12 annual instalments; annual ceiling Rs 10 cr, Rs 15 cr with boosters; Zone: Bundelkhand and PoorvanchalNivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.1, Table 3 (PDF p.38): Mega, Bundelkhand & Poorvanchal 22% of ECI over 12 years, Annual Ceiling Rs 10 Cr
IIEPP 2022: Net SGST reimbursement option (Large and above)
UP IIEPP 2022
Tax reimbursement100% of SGST paidlargeany industryLarge: 6 years; annual ceiling 16% of ECI (GBN, Ghaziabad) / 18% (Madhyanchal, Paschimanchal) / 20% (Bundelkhand, Poorvanchal); overall 80% / 90% / 100% of ECI; expansion on incremental turnover; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsNivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.2, Table 5 (p.40-41)
IIEPP 2022: Stamp duty exemption (Large and above)
UP IIEPP 2022
Stamp duty100% Bundelkhand and Purvanchal, 75% Madhyanchal and Paschimanchal (except GBN, Ghaziabad), 50% GBN and Ghaziabad; bank guarantee of…largeany industry100% Bundelkhand and Purvanchal, 75% Madhyanchal and Paschimanchal (except GBN, Ghaziabad), 50% GBN and Ghaziabad; bank guarantee of equal amount until commercial production; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsNivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.2 (p.36)
IIEPP 2022: Top-up of 30% on Government of India PLI
UP IIEPP 2022
Other support30% of the eligible costlargeany industry30% of PLI incentive disbursed by GoI under any PLI scheme; overall cap 100% of ECI; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsNivesh Mitra / Invest UP; Letter of Comfort from Empowered CommitteeInvest UP / Infrastructure & Industrial Development Dept, UPUttar Pradesh Industrial Investment & Employment Promotion Policy 2022 (IIEPP 2022), English version
Clause: para 12.3.3 (p.41)
MSME: Capital interest subsidy for new micro enterprises
UP MSME Promotion Policy 2022
Interest subsidy50% of the interest · up to ₹25 lakhmicroany industry50% of interest payable (60% for SC/ST/women-owned, >=51% share), max Rs 25 lakh per unit over 5 years; claimed annually after interest paid; land excluded; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.3.5-5.3.5.4 (p.9)
MSME: Clean production technology reimbursement
UP MSME Promotion Policy 2022
Capital subsidy40% of plant and machinery · up to ₹20 lakhmicro, small, mediumany industryraw material substitution, water and energy saving, pollution control equipment; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.9.4 (p.15)
MSME: Environment management lab / system
UP MSME Promotion Policy 2022
Other support50% of the eligible cost · up to ₹10 lakhmicro, small, mediumany industrysetting up environment management lab or system; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.9.7 (p.15)
MSME: Green / energy / water audit and recommended equipment
UP MSME Promotion Policy 2022
Other support75% of the eligible cost · up to ₹50,000micro, small, mediumany industryaudit fee 75% up to Rs 50,000; equipment recommended by auditor 50% up to Rs 20 lakh; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.9.5 (p.15)
MSME: IGBC green rating consultation fee
UP MSME Promotion Policy 2022
Certification refund50% of the certification cost · up to ₹2.5 lakhmicro, small, mediumany industryapplication for IGBC green rating; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.9.6 (p.15)
MSME: Investment Promotion Assistance (capital subsidy)
UP MSME Promotion Policy 2022
Capital subsidy15%–25% by size of fixed capital investment · up to ₹4 crmicro, small, mediumany industryBundelkhand & Purvanchal: micro 25%, small 20%, medium 15%; Madhyanchal & Paschimanchal: 20% / 15% / 10%; on plant, machinery, equipment and building (not land); +2% for SC/ST/women; ceiling Rs 4 cr per unit; 2 instalments; Zone: Bundelkhand and Purvanchal regionsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.3.4 table, 5.3.4.3 (p.9): Bundelkhand and Purvanchal 25%/20%/15%; ceiling Rs 4 crore per unit
MSME: Investment Promotion Assistance (capital subsidy)
UP MSME Promotion Policy 2022
Capital subsidy10%–20% by size of fixed capital investment · up to ₹4 crmicro, small, mediumany industryBundelkhand & Purvanchal: micro 25%, small 20%, medium 15%; Madhyanchal & Paschimanchal: 20% / 15% / 10%; on plant, machinery, equipment and building (not land); +2% for SC/ST/women; ceiling Rs 4 cr per unit; 2 instalments; Zone: Madhyanchal and Paschimanchal regionsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.3.4 table, 5.3.4.3 (p.9): Madhyanchal and Paschimanchal 20%/15%/10%; ceiling Rs 4 crore per unit
MSME: Patent and GI registration reimbursement
UP MSME Promotion Policy 2022
Other support75% of the eligible cost · up to ₹10 lakhmicro, small, mediumany industrynational/international patents incl. process patents and GI; attorney fee max Rs 50,000 national / Rs 2 lakh international; paid after grant; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.5.5 (p.12)
MSME: Quality certification and testing support
UP MSME Promotion Policy 2022
Certification refund25%–75% by size of the certification cost · up to ₹5 lakhmicro, small, mediumany industryZED, WHO-GMP, Hallmark and other BIS/NABCB-endorsed certification; certification/third-party testing up to Rs 5 lakh; testing lab and equipment up to Rs 5 lakh; IT systems up to Rs 2 lakh; mandatory professional training up to Rs 0.5 lakh; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.5.3, table (p.11-12)
MSME: Stamp duty exemption
UP MSME Promotion Policy 2022
Stamp duty100% Purvanchal and Bundelkhand; 75% Madhyanchal and Paschimanchal (except Gautam Buddh Nagar, Ghaziabad); 50% Gautam Buddh Nagar and…micro, small, mediumany industry100% Purvanchal and Bundelkhand; 75% Madhyanchal and Paschimanchal (except Gautam Buddh Nagar, Ghaziabad); 50% Gautam Buddh Nagar and Ghaziabad; 100% anywhere for women entrepreneurs; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.3.3 (p.8-9)
MSME: State pays CGTMSE guarantee fee
UP MSME Promotion Policy 2022
Other support100% of the eligible costmicro, smallany industryone-time guarantee fee under CGTMSE for collateral-free bank loans up to Rs 2 cr; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.3.2 (p.8)
MSME: Zero liquid discharge equipment assistance
UP MSME Promotion Policy 2022
Capital subsidy50% of the eligible cost · up to ₹75 lakhmicro, small, mediumany industryat least 50% waste recycling through ZLD certified by UP Pollution Control Board; Zone: regions: Bundelkhand, Purvanchal / Madhyanchal, Paschimanchal / Gautam Buddh Nagar and Ghaziabad districtsonline to Deputy Commissioner Industries of the district (para 6.1-6.2)Commissioner & Director of Industries, UP / District Industries and Enterprise Promotion Centre28 Sep 2022 to 27 Sep 2027Uttar Pradesh MSME Promotion Policy 2022 (notified 28.09.2022), English version
Clause: para 5.9.2 (p.15)
Prepared by Mama from the scheme documents of the Government of India and the state governments · data as of 17 Oct 2026
Before you buy the next machine, see how many hours the current ones really run. Get a free camera plan
Free · no obligation

Get a camera plan for your floor

Tell Mama about your plant and Mama will come back with how many cameras you need, where they go, and the retention your state expects — sized to your floor, in ₹. Built for Indian factories.

  • How many cameras & exact placement
  • Compliance-ready (BIS/STQC, women's night shift)
  • Honest ₹ estimate — guard vs camera-AI

Mama replies by email or phone — whichever you left. No spam, no obligation.